| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | ₹9.0 L | L1 | Accepted-AOC Agreement Executed |
| 2 | L2₹9.1 LRejected-Finance | ₹9.1 L | L2 | Rejected-Finance Highest rate quoted |
| Sl No | Description | Qty | Unit | Varghese.K.T L1 | k v john L2 |
|---|---|---|---|---|---|
| 1.00repai and maintenance work | |||||
| 1.002.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means | |||||
| 1.00 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. | 8 | cum | 54.5 ₹436 | 55 ₹440 |
| 1.00 | OD182417/2025-2026:Removing damaged concrete:
Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm. | 96.94 | sqm | 499.71 ₹48,440.89 | 504.3 ₹48,885.83 |
| 1.00 | OD182555/2025-2026:Rust remover/Rust Convertor:
Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid
based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust
converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted
metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as
required to exposed reinforcement bar at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries complete as per detail
specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface
area containing the cleaned rebars shall be measured for payment. As per approved data of Rehabilitation of kalluthankadavu bridge. | 27 | sqm | 356.43 ₹9,625.04 | 359.7 ₹9,713.34 |
| 1.00 | OD182661/2025-2026:New/Additional steel Reinforcement:
Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional
steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing
with old existing reinforcement which was reduced to 15 % or more of its original diameter as
required as provided in original structure and additional steels as directed by EIC and/ or
consultant as required tying with 16 gauge annealed binding wire complete as per drawing and
specifications for all heights including all material, labour, tools, temporary supports for
structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required)As per approved data of Rehabilitation of kalluthankadavu bridge. | 387 | kg | 76.3 ₹29,528.10 | 77 ₹29,799 |
| 1.01 | OD182799/2025-2026:Anchoring mainsteel and stirrups:
Drilling holes of min 4mm larger than new rebar diameter into existing concrete substrate for
anchoring of new rebar and depth of Min. 10 times the diameter of rebar and fixing with anchor
resin grout Lokfix E (35/55/75) series or Lokfix P or Emfix or chemical anchor material or
Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836 including
cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for
structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge
and/or consultant for all heights. As per approved data of Rehabilation of kalluthan kadavu bridge) | 25 | no | 352.07 ₹8,801.75 | 355.3 ₹8,882.50 |
| 1.01 | OD182413/2025-2026:Anchoring Steel & Shear Connectors: Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18- 836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights | 30 | no | 265.96 ₹7,978.80 | 268.4 ₹8,052 |
| 1.01 | OD182809/2025-2026:Anti Corrosive treatment to Steel:
Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars,after cleaning & removing scales and rust completely as specified in 1.4, Two component
inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having
specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40
microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as
per manufacturer?s specification in two coats at all heights, including all material, labour, tools,
temporary supports for structures, electricity, plant and machineries, necessary surface
preparation and necessary protection after and during work. The concrete surface area
contianing the rebars where the treatment is carried out shall be considered for measurement.Data as per approved data of Rehabilitation of Kalluthankadvu bridge. | 39.68 | sqm | 247.43 ₹9,817.28 | 249.7 ₹9,907.35 |
| 1.01 | OD182418/2025-2026:Polymer Modified Mortar (Pre -Packed):Providing and Applying single component,High strength,Fiber reinforced,thixotropic cementitous patch repair moratar that achieve compressive strengthminimum 15 Mpa at 1 day and 45Mpa at 28 days and capable of applaying up to 50mm thick in single layer such as rendroc SP40 of fosroc or Master Emaco S348 of Basf or equilent to the prepared concrete area for thickness up to 50mm after applying apoxy resin based bonding coat as per manufacture 's specification befor the bonding agent become tack free ,initially by hand and finaly finishing the same with trowel care fully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns ,slab,beam etc,at all heights ,where the thickness of application is less than 50mm in patches as per specification .Item rate is inclusive of all materials including the bond coat , labour , tools ,temperory supports for structures, electricity,Plant and machineries,curing etc.Complete and directed by Engineer in charge and/or consultant .(Payment to be made in square meter for thickness up to 50mm of PMM for patch area repaired) | 102.6 | sqm | 4,671.74 ₹4.8 L | 4,714.6 ₹4.8 L |
Tender Value
₹8.5 L
EMD Value
₹21,136
Closing Date
27 Dec 2025, 5:00 pmClosed
Assistant Executive Engineer Bridges Sub Division
Assistant Executive Engineer Bridges Sub Division kozhikode
Urgent manitenance work to the bridge at Chainage 3100 under Mini by pass road Mankavu
2025_PWD_823278_1
PWD/BR/13410/2025-2026
Open Tender
Civil Works - Bridges
180 days
Mini by pass road Mankavu
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,865
Yes
₹21,136
Yes
5 Mar 2026
22 Dec 2025
30 Dec 2025
22 Dec 2025
27 Dec 2025
22 Dec 2025
repai and maintenance work
2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
OD182417/2025-2026:Removing damaged concrete: Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm.
OD182555/2025-2026:Rust remover/Rust Convertor: Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as required to exposed reinforcement bar at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries complete as per detail specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface area containing the cleaned rebars shall be measured for payment. As per approved data of Rehabilitation of kalluthankadavu bridge.
OD182661/2025-2026:New/Additional steel Reinforcement: Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing with old existing reinforcement which was reduced to 15 % or more of its original diameter as required as provided in original structure and additional steels as directed by EIC and/ or consultant as required tying with 16 gauge annealed binding wire complete as per drawing and specifications for all heights including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required)As per approved data of Rehabilitation of kalluthankadavu bridge.
OD182799/2025-2026:Anchoring mainsteel and stirrups: Drilling holes of min 4mm larger than new rebar diameter into existing concrete substrate for anchoring of new rebar and depth of Min. 10 times the diameter of rebar and fixing with anchor resin grout Lokfix E (35/55/75) series or Lokfix P or Emfix or chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836 including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights. As per approved data of Rehabilation of kalluthan kadavu bridge)
OD182413/2025-2026:Anchoring Steel & Shear Connectors: Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18- 836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights
OD182809/2025-2026:Anti Corrosive treatment to Steel: Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars,after cleaning & removing scales and rust completely as specified in 1.4, Two component inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40 microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as per manufacturer?s specification in two coats at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, necessary surface preparation and necessary protection after and during work. The concrete surface area contianing the rebars where the treatment is carried out shall be considered for measurement.Data as per approved data of Rehabilitation of Kalluthankadvu bridge.
OD182418/2025-2026:Polymer Modified Mortar (Pre -Packed):Providing and Applying single component,High strength,Fiber reinforced,thixotropic cementitous patch repair moratar that achieve compressive strengthminimum 15 Mpa at 1 day and 45Mpa at 28 days and capable of applaying up to 50mm thick in single layer such as rendroc SP40 of fosroc or Master Emaco S348 of Basf or equilent to the prepared concrete area for thickness up to 50mm after applying apoxy resin based bonding coat as per manufacture 's specification befor the bonding agent become tack free ,initially by hand and finaly finishing the same with trowel care fully compacting the same around the rebar and finishing to bring it in line with existing concrete surface on the columns ,slab,beam etc,at all heights ,where the thickness of application is less than 50mm in patches as per specification .Item rate is inclusive of all materials including the bond coat , labour , tools ,temperory supports for structures, electricity,Plant and machineries,curing etc.Complete and directed by Engineer in charge and/or consultant .(Payment to be made in square meter for thickness up to 50mm of PMM for patch area repaired)
OD182530/2025-2026:Microconcrete Reinstatement for thickness more than 50mm for RCC members:- Providing and laying of special repair material micro-concrete for reinstatement of members having thickness of repair more than 50mm and jacketing, using Single component, high strength, high flow cementitious micro-concrete having compressive strength minimum of M40 at 28 days such as MasterEmaco 346 or Renderoc RGL / RGS of Fosroc or equivalent, blended with washed saturated surface-dry (SSD), graded, low absorption, high density, aggregates of size 3mm to 10mm at 50% by weight of micro concrete (if thickness is 100mm or more) and water as per data sheet and pouring into the shuttering if required than use birds beak type form work using suitable arrangement or if required using pumping device for uniform flow of Microconcrete. The side shuttering can be removed after Minimum of 24 hours, preferably 3 days and the bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete substrate at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-in-charge and/or consultant. (Payment shall be made in Sq.M for thickness upto 100mm of Microconcrete of area repaired, ) including shuttering work (Only steel reinforcement shall be paid in other relevant items) As per approved data of Rehabilitation of kalluthankadavu bridge.
OD182419/2025-2026: Removing white or colour wash by scrapping and sand papering and preparing the surfacesmooth including necesssary repairs to scratches ect complete. (Data derived from DAR Civil 13.88,)
OD182414/2025-2026: Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) ( Data derived from DAR Civil 13.46.1,)
55.10.2:Providing and erecting retro-reflectorised Object Hazard Marker 450mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801. 450mm x 900 mm
OD215625/2025-2026:Providing and fixing hanging platform for inspection of repair works using steel hollow sections and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be equipped with accessibility provisions with ladders and the same shall be stiffened with bracings, runners, connection with the bridge deck etc. at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The horizontal area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
OD215656/2025-2026:Engaging man mazdoor for cleaning the premises of bridge,etc., as directed by the departmental officers
OD217203/2025-2026:Data derived from DAR civil 60.7.1. - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
8.4.4:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 80 mm x 60 mm rectangular
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1379890.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1379890.xls
BOQ • 0.32 MB
viewsbd.pdf
Other Document • 1.63 MB
Download all tender documents and submit your bid