| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance KORBA CHHATTISGARH 495677 INDIA | KORBA | CHHATTISGARH | 495677 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical QR non-Compliant |
| 4 | Rejected-Technical | Rejected-Technical QR non-Compliant |
| 5 | Rejected-Technical 4B TOWN SQUARE CHINAR PARK RAJARHAT KOLKATA 700 136 | Rejected-Technical QR non-Compliant |
Tender Value
Refer Docs
EMD Value
₹30.1 L
Closing Date
2 Sept 2024, 3:00 pmClosed
Sr. General Manager, C and M Department
3rd floor, CandM Deptt.,DVC TOWERS, KOLKATA-700054
SITE LEVELLING PACKAGE FOR RAGHUNATHPUR THERMAL POWER STATION PHASE-II (2X660MW)
2024_DVC_202377_1
DVC/C and M/ENGINEERING/RTPS PHII/EPC/ CIVIL_ SL
Open Tender
Miscellaneous Works
300 days
RTPS, DVC
Please refer Tender documents.
15 documents required · 15 mandatory
₹35,000
DAMODAR VALLEY CORPORATION
₹30.1 L
3rd Floor, C and M Department, DVC HQ,KOL-700054
18 Oct 2024
24 Jul 2024
3 Sept 2024
24 Jul 2024
2 Sept 2024
24 Jul 2024
24 Jul 2024 - 7 Aug 2024
7 Aug 2024
Amount
TOPOGRAPHICAL SURVEY
Topographical survey of project area / site levelling area as per tender drawing for site levelling works, showing all permanent features/objects, carrying the Bench Mark (up to 5 Kms.) from existing plant area / nearest available source and establishing at suitable locations and detail survey by taking spot levels on an average at 25 m intervals, constructing bench marks, preparation of survey maps indicating grid lines, contour lines at 0.5 m intervals and furnishing soft/digital copy in AutoCAD and pdf format of various drawings as per specifications. Note: Topographical survey shall be completed prior to start of excavation/ filling/ site levelling work.
SITE LEVELLING WORKS
Earthwork in excavation in All Kinds of Soil, deposited ash, deposited coal etc. within site levelling boundary for site levelling work and disposal of excavated Soil, ash, coal etc in area within or outside the site leveling boundary as identified by the Owner, including clearing of excavation areas as per technical specification for 'Site Clearance', full compensation for excavation/cutting in soil, ash, coal etc. trimming bottom and slopes of excavation, loading, transportation and unloading of materials to disposal site, including the cost of lead upto 5 kms. and all lifts in respect of excavation, disposal, transportation and placement of disposal materials within/outside the site levelling boundary, dressing to the required slopes/ shapes, levels and profiles, bailing out rain/surface/sub-soil water (dewatering including pumps) from the excavation and disposal sites, excavation below subsoil water level, removal of slush as per requirements, providing all labour, materials, tools, equipment, safeguards and incidentals as per specifications, drawings and directions of the Engineer. Note: The payments for such works shall be based on volume in cutting only.
Earthwork in excavation in Ordinary Rock within site levelling boundary for site levelling work and disposal of excavated rock in area within or outside the site leveling boundary as identified by the owner, including clearing of excavation areas as per technical specification for 'Site Clearance', full compensation for excavation/cutting in rock, trimming bottom and slopes of excavation, loading, transportation and unloading of materials to disposal site, including the cost of lead upto 5 kms. and all lifts in respect of excavation, disposal, transportation and placement of disposal materials within/outside the site levelling boundary, dressing to the required slopes/ shapes, levels and profiles, bailing out rain/surface/sub-soil water (dewatering including pumps) from the excavation and disposal sites, excavation below subsoil water level, removal of slush as per requirements, providing all labour, materials, tools, equipment, safeguards and incidentals as per specifications, drawings and directions of the Engineer. Notes: a) Measurement and payment for such works shall be based on volume of rock in excavation /cutting only. b) In ordinary rock blasting operations shall not be generally adopted. However, the contractor may resort to blasting with the permission of the Engineer but nothing extra shall be paid for such blasting operations.
prasad AND company project works (BID ID -736273)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid