Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | -1.11% | ₹2.9 Cr | L1 | Admitted-Finance |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
18 Aug 2026, 4:00 pmClosed
Executive Engineer RandB Division Baramulla
Executive Engineer RandB Division Baramulla
Balance work for Transit Accommodation for JandK Migrant Employees at Fatehpora II (flood Colony) Baramulla (21st Block and 72 Flats) and Construction of internal and External Sewarage Network for STP at Transit Accommodation Khowjabagh Bla
2026_PWDJK_318909_1
70/5014-23/2026-27/RnB/Bla Dated 31.07.2026
Open Tender
Civil Works
Percentage
365 days
Baramulla
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,500
Executive Engineer RandB Division Baramulla
₹5.8 L
27 Aug 2026
1 Aug 2026
19 Aug 2026
1 Aug 2026
18 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | Civil works | - | - | - | - |
| 0.000 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 17.94 | Cum | 6,591.25 | ₹1,18,247.03 |
| 0.000 | Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying :
(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253kg/ sqm. This layer will be allowed to air cure for 4 hours.
(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm . This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. | 117.73 | Sqm | 485.1 | ₹57,110.82 |
| 0.000 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) with Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 121.79 | Cum | 9,027.2 | ₹10,99,422.69 |
| 0.000 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length complete First class deodar wood | 5.66 | Cum | 1,64,074.65 | ₹9,28,662.52 |
| 0.000 | Providing and fixing 35mm wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt
hinges bright finished of required size with necessary screws as per direction of Engineer-in-charge : First class kail wood incl. carriages | 40.75 | Sqm | 3,797.4 | ₹1,54,744.05 |
| 0.000 | Providing and fixing 35mm glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. First class kail wood incl. carriages | 40.75 | Sqm | 3,894.9 | ₹1,58,717.18 |
| 0.000 | Providing and fixing 35mm thick panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. | 86.06 | Sqm | 3,201.8 | ₹2,75,546.91 |
| 0.000 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick First Class kail wood | 68.84 | Sqm | 2,588.15 | ₹1,78,168.25 |
| 0.000 | Supply filling and spreading of RBM under floors including, watering, ramming, consolidating and dressing by hand ramming incl. all leads lifts costs and carriages from source to site of work complete . | 174.51 | Cum | 850 | ₹1,48,333.5 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_1053545.xls
BOQ • 0.42 MB
70extension.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .