Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.9 Cr
EMD Value
₹12.9 L
Closing Date
26 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Damanganga Canal Inv. Dn, Valsad
Construction of Amboshi-1 Weir Across Man River near village Amboshi Tal. Dharampur Dist. Valsad
364687
14 of 2026-27
Open
Civil - All
Works
Valsad
16 documents required · 14 mandatory · 2 optional
₹18,000
Executive Engineer, Damanganga Canal Inv. Dn,Valsad
₹12.9 L
7 Nov 2026
7 Nov 2026
7 Nov 2026
26 Nov 2026
7 Nov 2026
120 days
BILL OF QUANTITIES
BILLOF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder, Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and aregiventoprovidea commonbasisforbidding.Thebasisofpayment
willbethe actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and
prices tendered in the pricedBill of Quantities, where applicable, andotherwise at such rates andprices as the Engineer may fix within the terms of the
3. The rates and prices tendered in the priced Bill of Quantities shall, except in sofar as it is otherwise provided under the Contract, include all
constructionalplant, layout, supervision, materials, erection, maintenance, insurance, profit, taxes and duties, together with all general risks, liabilities
and obligations set out or implied in the Contract.
4. TheratesandpricesshallbequotedentirelyinIndianCurrency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities are stated or not. The cost of Items against which Contractor
has failed to enter a rate or price shall be deemed to be covered by other rates and prices entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complyingwith the provisions ofthe Contract shall be included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated or summarized in the Bill of Quantities. References to the
relevant sections of the contract documentation shall be made before entering rates or prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the specification for Road and Bridge works. For building works specifications
for building are to be followed.
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerrorspursuanttoClause29oftheInstructionsto Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw with a single rear mounted heavy
BILLOF QUANTITIES
(A) PercentageRateTender(UptoINR50Cr.)
Construction of Amboshi-1Weir on Man river near village Amboshi, Tal. Dharampur, Dist. Valsad.: Valsad.
Item Description of Item (with brief specification and reference Rate
Quantity Unit Amount.
No. tobook of specifications) in Figure
Excavation for foundation in all sorts of soil including yellow, sandy, gravelly
soil, soft & hard murrum, etc. dry condition including depositing the excavated
1 stuff in uniform layers in banks or as directed etc. complete for lead uo to 1.0 1274.20 m3 81.50
Km and all all lifts. (By machinery) (a) Above water table
Excavation for foundation in soft rock including depositing the excavated stuff
as and where directed etc. complete for lead upto 1.0 Km and all lifts.(By
(a) Above water table
Excavation for foundation in hard rock including blasting and chiseling if
necessary sorting out and stacking separately the usable rubble, depositing the
excavated stuff as and where directed including back filing trenches with
suitable excavated stuff etc. complete for lead upto 1.0 Km. and all lifts.(By
(a) Above water table
Providing and laying plain/reinforced Design Mix cement concrete of various
grade with cement, sand and coarse aggregates including centering,
4 shhuttering, batching, mixing, transporting, placing, vibrating, smooth finishing, 2449.00 m3 4500.40
curing etc. complete for all lead and lift. (Batching Plant Based, Excluding
dewatering) (I) M-20 Grade
Providing and laying plain/reinforced Design Mix cement concrete of various
grade with cement, sand and coarse aggregates including centering, shuttering,
5 batching, mixing, transporting, placing, vibrating, smooth finishing, curing etc. 17181.00 m3 4536.00
complete for all lead and lift. (Batching Plant Based, Including dewatering). (II)
Drilling hole of 35 mm dia. Vertical or inclined in all formations of rock /
6 concrete upto required depth including washing with air & water at required 2750.00 Rmt 2321.70
pressure for following stage of depth. (A) For 0.00 to 10.0 meter depth
Providing and fixing in position 110mm dia PVC pipe weep holes in abutment,
6(A) wing wall, and laying training etc. complete. 374.40 Rmt 263.70
Nipple fixing including drilling the holes diameter 22mm.( minimum 15mm
internal diameter of nipples) and 20cm in RCC/PCC irrigation structure's
components incl fixing of nipple by applying prime coat done with BIS standard
quality material of Resin+Hardner mixing material & quality that works in
wetted condition. Pointing done with water plugging BIS standard quality
material in first coat and after that second coat done with epoxy base putty of
Resin+Hardener mixing ( 1part + Resin + 1 part Hardener + 8 part Sillica ) and
sealing the nipple hole with appropriate material and process after grouting.
Pressure (Injection) grouting to structures with cement slurry by including
providing PVC nipple size of 15cm long 1/2" at 30cm C/C distance at a
7(A) maximum pessure of 7.50 kg/sq.cm including providing necessary scaffolding 346.50 SQM 712.40
and materials etc. complete.
Providing and placing in position reinforcement bars including cutting, bending
8 welding, joints where necessary, hooking etc. complete as per drawing for all 2841.84 Qtl. 7194.00
lead and lifts. (b) TMT
Providing fabricating and placing cutting edge and curbs as per design and
drawing manufactured from structural steel or MS plate confirming to ISS 226-
1962 incl.Riveting, welding etc complete. Incl. ms bars, anchor bolts and
structural steel etc complete.
Back filling the foundation trenches around the structures etc. with selected
10 excavated stuff including watering, ramming, compacting etc. complete. (By 739.40 m3 19.50
Providing and fixing in position PVC heavy duty water stops in barrels, trough,
and wing wall with 25 mm wide expansion joint as shown in drawing including
filling the joints with asphalt pad or bitumins or cork board of approved
quality. (B) 300 mm wide PVC water stop
Manufacturing, transportation and erection of vertical gateincluding
performance test, supplying, transportation and erection of manually operated
screw lift hoist assembly for operating the vertical gate consisting of capstan
having screw worm and worm wheel, stem rod, thrust bearing, taper bearing,
hand operating device, gate position indicator with all accessories and
equipments, supplying and fixing access ladder, entry gate including painting,
installing the hoist with gate to ensure smooth and watertight operation
including performance test etc. complete as per drawing and specification with
the 5 MT capacity screw lift hoist assembly and 900 dia pipe opening etc.
Providing and fixing in position (different diameter) I.S NP3 class reinforced
pipe with caulking the joints with cement mortar 1:1 proportion using jute
13 string soaked in cement slurry, finishing joints, and laying pipes to the designed 60.44 Rmt 3590.90
grade and levels, curing etc. complete for all lead and lifts. (e) NP3 class 900mm
Providing and applying ready mixed oil paint of approved quality after scraping
the old surface in two coats and figuring the so pianted surface with ready
mixed oil paint to form a guage strip including scaffolding, preparing surface
Supplying and laying mechanically woven double twisated Hexagonal Zn+ PVC
coated box wire mesh reno mattress Size 1m x 1m x 0.30m filled with 10 to
kg. trap rubble stone (approximate 2.70) tone with mesh size 6 cm x 8 cm
including packing, interlocking of stones & fusing top of gabion & tying to each
other & laying to the required line, level slope with all leads & lifts as directed
etc. comp. (Considering lead of 45 km for rubble materials)
Providing inverted filter of 30 cm. Sand and 30 cm. gravel below/behind
16 wall/Pitching including laying to correct slopes after neccesary trimming of 607.4 Sq.M. 550.74
earth work etc. complete.
Providing Videography on occasion of function or for on going construction
work including dubbing, titeling etc. complete including cost of cassette/CD. Time
(b) Up To 4 Hrs (4 hours)
Providing and Fixing G.I. Pipe railing (B-class medium duty) as per design of
mt height, using 75x75x10 mm size M.S angle at 2.0 mt c/c for vertical posts
and 38 mm dia G.I Pipe for 4 horizontal rows incl on coat of red oxide primer &
two coats of oil paint etc complete.
Providing & fixing in position sign board of standard size of 1.20mx0.90m with
M.S angle 40mmx40mmx6mm with 3mm thick iron plate including fixing in
1:5:10 prop. Concrete block size 40cmx40cmx75 cm including painting existing
data on the board etc. complete as directed
Providing and fixing marble plate of 2 cm thickness including engraving and
20 filling Paint for letters as directed. 108 100 cm 2 250.60
Providing and laying rough chiseled dressed stone flooring over 20mm average
thick base of cement mortar 1:5 (1-Cement : 5-coarse sand) or L.M. 1:1.5 (1-
Lime putty : 1.5 - coarse sand) including pointing with cement mortar 1:2 (1-
cement : 2-stone dust) etc. complete. (A) 25mm thick
Care & Diversion of river/creek including required dewatering during
22 construction of spillway and allied works as prescribed and directed etc. 1 Job 95000.00
23 Constructing WBM Approach road ( Width 3.75 ) 1.1 km 1652614.50
In words Twelve Crore Nighty Three Lakhs Ninety Nine Thousand Nine and Paise Sixty Two Rupees
I/Weam/arewillingtocarryouttheworkat… ......................... %above/belowpercent (Should
bewritteninfiguresandwords)oftheestimatedratementionedabove.Amountofmy/our tender works out as under.
Estimatedamountputto tender Rs. 12,93,99,009=62 Estimatedamountputto tender Rs.12,93,99,009=62
Deduct………%below Add………%Above
Inwords Inwords
1 The Contractor shall exhibit a board with detailed specification and details of work asdirected by the Engineer-In-Charge for which
no extra payment shall be made.
2 Thelabourcesswillbe deductedasperprevailingrulesi.e.1%ofthework done.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsof bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-
10/2017CementConsumption/16/CDate:11/05/2017asstatedin
S.O.R.thereforeinR.C.C.itemswherethereisachangeasperactualmixdesignthecost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the
Deputy Executive Engineer Divisional Accountant Executive Engineer,
Damanganga OFD Sub Division Damanganga Canal Investigation Division Damanganga Canal Investigation Division
Pardi Valsad Valsad
CEMENT CONSUMPTION STATEMENT
Construction of Amboshi-1Weir on Man river near village Amboshi, Tal.
Dharampur, Dist. Valsad.
Description of Item Qty. Unit s As Per
Rate Theoretical
Providing and laying plain/reinforced
Design Mix cement concrete of
various grade with cement, sand and
coarse aggregates including centering,
shuttering, batching, mixing, Bags
transporting, placing, vibrating, /m3
smooth finishing, curing etc. complete
for all lead and lift. (Batching Plant
Based, Excluding dewatering) (I) M-
Providing and laying plain/reinforced
Design Mix cement concrete of
various grade with cement, sand and
coarse aggregates including centering,
shuttering, batching, mixing, Bags
transporting, placing, vibrating, /m3
smooth finishing, curing etc. complete
for all lead and lift. (Batching Plant
Based, Excluding dewatering) (II) M-
Pressure (Injection) grouting to
structures with cement slurry by
including providing PVC nipple size of
15cm long 1/2" at 30cm C/C distance Bags
at a maximum pessure of 7.50 /m2
kg/sq.cm including providing
necessary scaffolding and materials
Providing and fixing in position sign
board of standard size of 1.20 m x
0.90 m with M.S. Angle 40 mm x40
mm x 6 mm with 3 mm thick iron
19 plate including fixing in 1:5:10 prop. 2.00 NO 0.66
Concrete block size 40 cm x40 cm x
75 cm including painting existing
data on the board etc. complete as
Providing and laying rough chiseled
dressed stone flooring over 20mm
average thick base of cement mortar
1:5 (1-Cement : 5-coarse sand) or L.M. Bags
1:1.5 (1-Lime putty : 1.5 - coarse /m2
sand) including pointing with cement
mortar 1:2 (1-cement : 2-stone dust)
etc. complete. (A) 25mm thick
Deputy Executive Engineer Executive Engineer
Damanganga OFD Sub Division Damanganaga Canal Investigation Division
Steel Consumption Statement
Construction of Amboshi-1Weir on Man river near village Amboshi, Tal.
Dharampur, Dist. Valsad.
No. Discription of Item Qty. Unit
Providing and placing in position
reinforcement bars including cutting, bending,
8 welding, joints where necessary, hooking etc. 2841.84 Qtl
complete as per drawing for all lead and lift.
Total in Qtl 2841.84 Qtl
Total in MT 284.18 MT
Deputy Executive Engineer Executive Engineer
Damanganga OFD Sub Division Damanganaga Canal Investigation Division
(B) ForItemRateTender(ForaboveINR50Cr.):
Ite Description of Item Quantity Unit Rat Amount
m (with brief e
No specification In In
andreferencetobookof figure Word
specifications) s s
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)……………………
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with detailed specification and details of
work asdirected by the Engineer-In-Charge for which no extra payment shall be
2 Thelabourcesswillbe deductedasperprevailingrulesi.e.1%ofthework done.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsof bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been
taken as per Govt.G.R.:PRC-
10/2017CementConsumption/16/CDate:11/05/2017asstatedin
S.O.R.thereforeinR.C.C.itemswherethereisachangeasperactualmixdesignthecost
of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Name of Work:- Construction of Amboshi-1 Weir on Man river near village Amboshi,
Tal. Dharampur, Dist. Valsad.
Details of Labour, Material & P.O.L component
[A] Estimated Amount put to Tender Rs.
[B] Cost of cement Rs.
[B] Cost of steel Rs.
[B] Cost of Asphalt Rs.
Cost of Materials Other than cement &
[C] Asphalt Rs.
[D] Cost of P.O.L. Rs.
[E] Cost of Labour = [A] - [B] - [C] - [D] Rs. 22896657.04 35%
Cost of plant machinaries
Percentage of Labour component
Percentage of Cement component
Percentage of Steel component
Percentage of Bitumen component
Percentage of P.O.L. component
Percentage of Material component
Percentage of plant machineries
Deputy Executive Engineer Divisional Accountant
Damanganga OFD Sub Division Damanganaga Canal Investigation Division
Executive Engineer
Damanganaga Canal Investigation Division
Name of Work:- Construction of Amboshi-1Weir on Man river near village
Amboshi, Tal. Dharampur, Dist. Valsad.
Cost of Materials
Sr.No. Details of Material Qty. Input Rate Per Amount
A Steel,Cement & Asphalt
2 TMT Steel (FE 500 D) 284.18 44237.30 M.T.
3 Emulsion RS1 0.000 0.00 M.T.
4 Asphalt VG-30 0.000 0.00 M.T.
B Material Other than Steel, Cement & Asphalt
1 Geo Fabric Filter Roller 0.00 96.00 Sq.mt.
3 Rubble 127.68 211.00 Cum
4 Vinyl sheet pile 0.00 0.00 M
Deputy Executive Engineer Divisional Accountant
Damanganga OFD Sub Division Damanganaga Canal Investigation
Executive Engineer
Damanganaga Canal Investigation Division
Name of Work:- Construction of Amboshi-1Weir on Man river near village Amboshi, Tal.
Dharampur, Dist. Valsad.
Details of P.O.L.
Details of Qty per No.of Av. Total
Sr.No. Qty. Unit
Material trip trip lead K.M.
A Steel,Cement & Asphalt
3 Emulsion RS1 0.00 M.T. 20.0 0 0
4 Asphalt VG-30 0.00 M.T. 20.0 0 0
B Material Other than Steel, Cement & Asphalt
Geo Fabric Filter
4 Vinyl sheet pile 0.00 M 10.00 0.00 13482
Say 105625.00 Km
[A] Qty. of Diesel required @ 4.0 Km./Litre 105625.00 = 26406.25 Ltr.
Qty. of oil required @3% of
Diesel 792.19 Ltr.
Cost of Diesel @ Rs. 100.00/Ltr. 26406.3 x 100.00 =
Cost of Oil @ Rs.
Deputy Executive Engineer Divisional Accountant
Damanganga OFD Sub Division Damanganaga Canal Investigation
Executive Engineer
Damanganaga Canal Investigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Section 7-BOQ.pdf
SBD-Amboshi-1_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .