| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹11.1 L+₹47,551.43 (4.49%)Rejected-Finance | L2 | Rejected-Finance ok | |
| 3 | L3₹11.1 L+₹54,601.52 (5.15%)Rejected-Finance CHAMANAPASSIL HOUSE CRAV 25 VELLAPPALLY KOCHI 28 | KOCHI | ERNAKULAM | KERALA | L3 | Rejected-Finance ok | |
| 4 | L4₹11.6 L+₹98,866.44 (9.33%)Rejected-Finance NELLIMOOTTIL THOTTUVA MANAKKALA P O ADOOR | L4 | Rejected-Finance ok | |
| 5 | L5₹13.4 L+₹2.8 L (26.1%)Rejected-Finance | L5 | Rejected-Finance ok |
Tender Value
₹12.9 L
EMD Value
₹32,196
Closing Date
6 Mar 2023, 6:00 pmClosed
The Assistant Engineer, LID and EW Section ,Adoor
The Assistant Engineer, LID and EW Section ,Adoor Municiplaity
PROJ No.90/23 RENOVATION OF PULIKANNAL POND-
2023_LSGD_561447_5
P1/3606/22/ Phase5/item
Open Tender
Civil Works - Water Works
Item Rate
270 days
The Assistant Engineer, LID and EW Section, Adoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹32,196
Yes
23 May 2023
25 Feb 2023
7 Mar 2023
25 Feb 2023
6 Mar 2023
25 Feb 2023
Amount
POND RENOVATION
OD376059/2022-2023:Engaging Man coolie
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
OD376062/2022-2023:RR with departmental.Stone-Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
OD376075/2022-2023:Providing & fixing GI 5.5 mm wire gauze to windows, clerestory windows & doors with MS 25x25x3 mm equal angle and nuts & bolts complete.<br>Galvanised M.S. Wire gauze with 5.5 mm dia wire and 5 cm aperture on both sides including applying primer
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD379988/2022-2023:Providing and fixing of good quality granate name board with lettering inclooding of allcost, conveyance,labour charges etc complete
SOMARAJAN.D
UNNIKRISHNAN
RAY THOMAS
ANILKUMAR. R
Bidder Name
UNNIKRISHNAN
RAY THOMAS
SOMARAJAN.D
ANILKUMAR. R
SUDAN G
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_827132.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .