| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Fee/PreQual/Technical/Finance | ₹1.3 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.6 Cr+₹23.7 L (17.8%)Admitted-Fee/PreQual/Technical/Finance | ₹1.6 Cr+₹23.7 L (17.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.6 Cr+₹23.7 L (17.8%)Admitted-Fee/PreQual/Technical/Finance | ₹1.6 Cr+₹23.7 L (17.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Kishor Kumar M J L2 | RANJITH KUMAR N L3 | BAIJU A A L1 |
|---|---|---|---|---|---|---|
| 1.00ROAD ,CULVERT&IRON BRIDGE | ||||||
| 1.00 | 2.3.B.2:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. B. Lead upto 1000 m (ii) Girth above 600 mm to 900 mm | 21.5 | each | 1,246.32 ₹26,795.88 | 1,252.01 ₹26,918.22 | 1,058.4 ₹22,755.6 Lowest |
| 1.00 | 2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (D) Dry Rubble Masonry | 90 | cum | 526.1 ₹47,349 | 528.51 ₹47,565.9 | 446.78 ₹40,210.2 Lowest |
| 1.00 | 2.9.B:Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specification Clause 202. <br>(B) Excluding dismembering | 2.5 | tonne | 3,337.64 ₹8,344.1 | 3,352.88 ₹8,382.2 | 2,834.4 ₹7,086 Lowest |
| 1.00 | 2.5.1.A:Dismantling of Structures <br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. <br> (I) By Manual Means <br> (A) Lime Concrete | 0.5 | cum | 1,093.32 ₹551.03 | 1,098.32 ₹553.55 | 928.48 ₹467.95 Lowest |
| 1.00 | 2.7.A:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br> (A) Rubble Stone Masonry in Lime Mortar | 19.2 | cum | 680.79 ₹13,071.17 | 683.9 ₹13,130.88 | 578.15 ₹11,100.48 Lowest |
| 1.01 | 2.5.2.A:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br>(II) By Mechanical Means <br> (A) Cement Concrete | 36.48 | cum | 860.93 ₹31,406.73 | 864.86 ₹31,550.09 | 731.12 ₹26,671.26 Lowest |
| 1.01 | OD313146/2025-2026:Pumping or Bailing out water and removing slush etc by using pump set including cost of
labour, oil hire charges of pumpset, etc complete | 364 | hour | 394.18 ₹1,43,481.52 | 395.98 ₹1,44,136.72 | 334.75 ₹1,21,849 Lowest |
| 1.01 | OD535463/2025-2026:Supply and stacking well matuerd straight coconut post for driving down through various strata
below bed level including cost of conveyance , labour charges, ete complete | 840 | metre | 163.32 ₹1,37,188.8 | 164.07 ₹1,37,818.8 | 138.69 ₹1,16,499.6 Lowest |
| 1.01 | OD535485/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including
all hire charges and labour for fixing , staging platform and all other appliances necessary for
pile driving down after pointing the bottom end | 840 | metre | 280.56 ₹2,35,670.4 | 281.84 ₹2,36,745.6 | 238.26 ₹2,00,138.4 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹50,000
Closing Date
16 Jun 2026, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, LSGD SE - Kochi Corporation
Amruth2.0- Rejuvination of Chilavannoor bye thodu, Reconstruction of Retaining wall, Fencing, Reconstruction of Culvert at St Sebastian road, VV Michel road, Subhash Chandrabose road, Relaying tile by the side of Chilavannoor bye thodu in Div.5
2026_LSGD_855021_1
KRE3-128739
Open Tender
Civil Works - Others
Item Rate
Ernakulam
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,515
₹50,000
6 Aug 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ROAD ,CULVERT&IRON BRIDGE | |||||
| 1.001 | 2.3.B.2:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. B. Lead upto 1000 m (ii) Girth above 600 mm to 900 mm | - | each | - | - |
| 1.002 | 2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (D) Dry Rubble Masonry | - | cum | - | - |
| 1.003 | 2.9.B:Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth Level excluding Cutting of rivet as per Technical Specification Clause 202. <br>(B) Excluding dismembering | - | tonne | - | - |
| 1.004 | 2.5.1.A:Dismantling of Structures <br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. <br> (I) By Manual Means <br> (A) Lime Concrete | - | cum | - | - |
| 1.005 | 2.7.A:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br> (A) Rubble Stone Masonry in Lime Mortar | 1 | cum | - | - |
| 1.006 | 2.5.2.A:Dismantling of Structures<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.<br>(II) By Mechanical Means <br> (A) Cement Concrete | 1 | cum | - | - |
| 1.007 | OD313146/2025-2026:Pumping or Bailing out water and removing slush etc by using pump set including cost of
labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.008 | OD535463/2025-2026:Supply and stacking well matuerd straight coconut post for driving down through various strata
below bed level including cost of conveyance , labour charges, ete complete | - | metre | - | - |
| 1.009 | OD535485/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including
all hire charges and labour for fixing , staging platform and all other appliances necessary for
pile driving down after pointing the bottom end | - | metre | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1445020.xls
BOQ • 0.33 MB
viewsbd.pdf
Tender Documents • 2.01 MB
time.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .