| 1 | L1₹48.8 LAccepted-AOC NO 94 OLD NO 100 19TH MAIN ROAD 1ST N BLOCK RAJAJI NAGAR BANGALORE 560 010 | BANGALORE | BANGALORE | KARNATAKA | 560010 | L1 | Accepted-AOC being L1 | |
| 2 | L2₹49.4 L+₹54,175 (1.11%)Rejected-Finance | L2 | Rejected-Finance rejected being L2 | |
| 3 | L3₹49.5 L+₹61,050 (1.25%)Rejected-Finance | L3 | Rejected-Finance Rejected being L3 | |
| 4 | L4₹49.8 L+₹96,050 (1.97%)Rejected-Finance | L4 | Rejected-Finance Rejected being L4 | |
| 5 | L5₹50.3 L+₹1.5 L (2.98%)Rejected-Finance NO 23 SECOND MAIN ROAD RAJAMMAL NAGAR MADAMBAKKAM CHENNAI 600 126 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600126 | L5 | Rejected-Finance Rejected being L5 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
9 Jun 2020, 6:00 pmClosed
GE I R AND D East Bangalore
GE RD East Bangalore 93
COMPREHENSIVE MAINTENANCE OF LIFT IN RESIDENTIAL ACCN TYPE III C43 TO C49 TYPE E30 TO E53 INCLUDING CERTAIN OTHER LIFT AT RTC PHASE II ADE CABS GTRE DARE CEMILAC WITH MISC REPAIR TO LIFT AT PH II CV RAMAN NAGAR , BANGALORE
2020_MES_343919_1
8943
Open Tender
Electrical Maintenance Service
Item Rate
330 days
GE I R AND D East Bangalore
D c (ii) d (v)
9 documents required · 9 mandatory
₹500
Yes
GE I R AND D East Bangalore
₹90,000
Yes
27 Aug 2020
11 May 2020
13 Jun 2020
11 May 2020
9 Jun 2020
28 May 2020
12 May 2020 - 21 May 2020
Amount
Note :- 1. Maintenance and repair of all lifts and attending day to ay complaints round the clock in all days in three shifts in residential area at DRDO Phase-II all as directed /specified as under:- (a) Nature of duty :- (i) Attending of all day to day complaints of maintenance works (ii) Lift technician to be present in the area for attending emergency break down for Phase -II area. (iii) In case emergency arises, contractor has to be depute their technical person/Engineer to sites in odd hours to repair the defects and resolve the problem. (iv) Contractor should strictly adhere to the statutory regulation viz minimum wages act, PF act, ESI scheme and other regulation. (v) In case of delay in attending the compliants in time, department will be at liberty to get the work done through any other contractor and cost may be recovered from the tenderer. Operating staff to be employed as under :- (iii) Technician - 01 No in each shift for three shifts including Sunday & general holiday at DRDO Phase-II area. Shift Timing :- 0600 hours to 1400 hours 1400 hours to 2200 hours & 2200 hours to 0600 hours
All as per item No. 1 here in before but for OMEGA make lift for 8/13 passenger capacity lift at E-39 to E-45 (Total lift 07 Nos ) at Pase-II area
All as per item No. 1 here in before, but for OMEGA, UTI make lift for 544 Kg lift for 8/13 passenger capacity lift at E-46 to E- 53 (Total lift 08 Nos ) at Pase-II area
All as per item No. 1 here in before, but for OTIS make passenger lift building NO. 10 at GTRE lift A&B to serve groud floor and five upper floor all as specified and as directed. Total lift 02(Two) Nos
All as per item No. 1 here in before but for Johnson make 680Kg/ 10 passenger capacity lift at Assembly Hangar to serve for ground floor and four upper floor GTRE . Total lift 02 Nos
All as per item No. 1 here in before but for Schindler make 9 passenger capacity lift at RTC New Hostel to serve for ground floor and four upper floor at Phase-II area Total lift 01 No
All as per item No. 1 here in before but for OTIS make lift for 544Kg / 8 passenger capacity lift at CEMILAC to serve for ground floor and three upper floor Total lift 01 No
All as per item No. 1 here in before but for OTIS make lift for 13 passenger capacity lift at DARE to serve for ground floor and seven upper floor Total lift 02 Nos
All as per item No. 8 here in before but for OTIS make goods of capacity 1 Ton at DARE . Total lift 01 No
Comprehensive maintenance of consisting of fort-nightly examination as mentioned below as required and repairs/replace parts specified at the discretion of GE for smooth operation of KONE make 3 Ton capacity G+2 floor goods cum passenger lift at SIMEL building at ADE all as directed by Engineer-in-Charge. (a) Check that lift stops in download direction properly with 25% over load with operation of the emergency stop when lift is moving at full speed (b) Check that leveling is with in limit X=+75mm for single speed lifts. (c) Check and lubricate by grease cup or top up oil on sleeve type bearing on :- (i) Motor shaft (ii) Deflector sheave shaft (iii) Governor pulley (d) Check and lubricate sleeve bearing of governor tensioning pulley at the pit .
All as per item No. 10 here in before but for OMEGA make lift 2 Ton capacity goods lift G+2 floor at AVIONICS building at ADE
All as per item No. 10 here in before but for OMEGA make lift 1 Ton capacity goods lift G+2 floor at FTTT building at ADE
All as per item No. 10 here in before but for SUPRIYA make lift 14 passenger capacity lift G+3 floor at AEW&C Building at CABS
All as per item No. 10 here in before but for OMEGA make lift 13 passenger capacity goods lift G+4 floor at CABS
All as per item No. 10 here in before but for KONE make lift 8 passenger /544 Kg capacity lift G+2 floor at DEBEL Note : (a) The contractor shall got inspected all lifts by lift inspector nominate be Chief Electrical Inspectorate of Karnataka and obtain worthiness certificate once in the currency of the contract but not later than four months from the date of acceptance of tender.
Note for item No. 1 to 15 :- The contractor shall got inspected all lifts by lift inspector nominate by Chief Electrical Inspectorate of Karnataka and obtain worthiness certificate once in the currency of the contract but not later than four months from the date of acceptance of tender without any financial effect.
Material and labour in replacement for main gear box and pedestal, shifting to the facrtory, grid the worn out gear shaft, make a new pedestal bush bearing acording to the gear shaft size, press the bush bearing with hydraulic press ,shift the gear to the site from factory, fix and align the gear box , adjust the pedestal and gear shaft & replace the gear oil and run the lift complete all as specified and as directed
Dismantling and taking out 884 kg passenger lift 17/15KW motor with sheave and gear box assembly complete , transporting to factory/workshop . Taking out sheave from help of hyraulic machine. Turning polished and making key and key shaft and making bores as required size for fixing shieve (pully drive). Reassembling the same and testing for smooth functioning of lift all as specified and as directed
Material and labour for replacement of landing push button with call register button with stainless steel face plate, fixing connection and testing all as specified and as directed , and taking down the existing land push buttons.
Material and labour for replacement of car operating panel with G, 1, 2, 3, 4 (5th floor) DC stop, alarm light, fan switch, up and down arow, digital position indicator, fixing , testing and taking down the unserviceable all as specified and as directed
Material and labour for repalcement of flexible cable 16/32 copper wire wiring complete with connections and testing all as specified and as directed from control panel to half way junction boxes and control panel to landing push button box and landing gate to switches motor to controller and main switches with copper wire 7/20 gauge etc and taking down the unserviceable wires all as specified and as directed
Material and labour for painting landing doors and cabins and ceiling of lift by proportion of surface two coats of Duco paint over a coat of primer after removing old paint complete all as specified and as directed
Supply and fix maintenance free dry battery 17 Amp 12 Volts for ARD system complete all as specified and as directed
Supply and fix alarm bell with 6V battery and speaker complete all as specified and as directed
Supply and fix door lock set along with door ropes and door bush complete all as specified and as directed
RASI AND COMPANY
Radikan
Power and Telecom Systems
PREMIER ENGINEERING SYSTEMS
Sahara Engineers
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .