Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC 106 AGARWAL AND COMPANY PROFESSOR COLONY OPP OF WALL FORT CITY RING ROAD NO 01 RAIPUR CHHATTISGARH 492001 | RAIPUR | CHHATTISGARH | 492001 | L1 | Accepted-AOC BEING THE LOWEST BIDDER | |
| 2 | L2₹30.4 L+₹4.4 L (16.9%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 3 | L3₹31.6 L+₹5.6 L (21.4%)Rejected-Finance 74 AJANTA COMMERCIAL CENTRE ASHRAM ROAD AHMEDABAD 380014 | AHMEDABAD | AHMEDABAD | GUJARAT | 380014 | L3 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 4 | L4₹31.7 L+₹5.7 L (22.0%)Rejected-Finance 274 210 DAFNALA ROAD SHAHIBAUG AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | L4 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 5 | L5₹32.0 L+₹6.0 L (22.9%)Rejected-Finance 200 NAVAGAM NAVAGAM TA SAYLA SURENDRA NAGAR GUJARAT 363430 | SURENDRANAGAR | GUJARAT | 363430 | L5 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
Tender Value
Refer Docs
EMD Value
₹64,000
Closing Date
22 Jun 2020, 6:00 pmClosed
GE AF CHILODA
VAYU SHAKTI NAGAR CHILODA
COMPREHENSIVE REPAIR AND MAINTENANCE OF CENTRALISED AIR CONDITIONING PLANT OF 700 TR AND 150 TR FOR SWAC HQ BUILDING AT AF STN CHILODA
2020_MES_336497_2
8804/20-21/E8
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
VAYU SHAKTI NAGAR CHILODA
AS PER NOTICE OF TENDER
8 documents required · 8 mandatory
₹500
Yes
GE AF CHILODA
₹64,000
Yes
9 Jul 2020
3 Jun 2020
24 Jun 2020
3 Jun 2020
22 Jun 2020
10 Jun 2020
3 Jun 2020 - 10 Jun 2020
Amount
Comprehensive maintenance for chilling package of (350X2=700 TR) Screw type refrigeration Compressor with R134A refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintennace programm will proceed as and when required as per the inspection report provided by company reprenstative and servicing of complete power supply system of the AC Plant including sub panels complete all as specified and directed by the engineer in charge as detailed below :
Descaling of condenser and chiller tubes once if required to meet the designed specifications of flow of refrigerant in compressor and water in condenser and it will be the part of AMC
Checking leakage and shortage of refrigerant in the machines with soap solution and rectify the system defect causing leakage rectification including topping up of refrigerant. If leakage is not rectified by the soap solution then nitrogen pressure testing will be carrid out to identify the refrigerant leakage through the chiller machine and refilling/topping up of refrigerant will be the part of this item and no sepaerate payment will be made in this regards. Amount quoted by the contractor should be inclusive of cost of nitrogen pressure testing.
Carry the proper functioning of microprocessor panel and take the control test.
Check the electrical panels for tripping, overheating, chattering in electrical parts and terminals for proper tightness.
Check for proper working of all Ammeters, voltmeters, Hour mtrs, KWH Mtrs and overload relays etc and replacing the same if found unserviceable
Checking the operation of MCCB's, MCB, Isolators, etc and replacing the same if found unserviceable. Proper load balancing should be carreid out by the contractor of electric supply system to the chiller machines and necessary arrangements will be carried out for measurement of electric load in all phases by the contractor at no additional cost and the subject report of load in the electrical panel will be submitted at the time of inspection report of the chillers.
Clean electrical panels and chiller machine periodically.
Check functioning of water flow switch and interlock in the system.
Check all safety and operating controls for proper functioning and replace if the same is defective for proper sequence of operation of the machine
All the breakdowns including compressor failure will be attended and the visit shall not be counted in periodical inspection.
Check refrigerant filter and drier core, replace the same , if found necessary.
Check oil level and oil heater in the system and top-up the oil if found necessary.
Check chilled water flow by checking pressure drop across the chiller
Check evaporator and condenser approach and compare the chilled water temperature at full load with the chilled water temperature control
Seasonal adjustment of controls if required and software upgrade
Inspect entire system for any unusual condition such as noise, vibration etc
Supply of electrical parts except electrical spares for incoming panel. (Electrical Spares Like:- fuses, incoming electrical controls, cables etc)
Comprehensive maintenance for chilling package of (50X3=150 TR) Scroll type refrigeration Compressor with R407C refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintennace programm will proceed as and when required as per the inspection report provided by company reprenstative and servicing of complete power supply system of the AC Plant including sub panels complete all as specified and directed by the engineer in charge. as detailed below
Descaling of condenser and chiller tubes once if required to meet the designed specifications of flow of refrigerant in compressor and water in condenser and it will be the part of AMC
Checking leakage and shortage of refrigerant in the machines with soap solution and rectify the system defect causing leakage rectification including topping up of refrigerant. If leakage is not rectified by the soap solution then nitrogen pressure testing will be carrid out to identify the refrigerant leakage through the chiller machine and refilling/topping up of refrigerant will be the part of this item and no sepaerate payment will be made in this regards. Amount quoted by the contractor should be inclusive of cost of nitrogen pressure testing
Carry the proper functioning of microprocessor panel and take the control test
Check the electrical panels for tripping, overheating, chattering in electrical parts and terminals for proper tightness.
Check for proper working of all Ammeters, voltmeters, Hour mtrs, KWH Mtrs and overload relays etc and replacing the same if found unserviceable
Checking the operation of MCCB's, MCB, Isolators, etc and replacing the same if found unserviceable. Proper load balancing should be carreid out by the contractor of electric supply system to the chiller machines and necessary arrangements will be carried out for measurement of electric load in all phases by the contractor at no additional cost and the subject report of load in the electrical panel will be submitted at the time of inspection report of the chillers
Clean electrical panels and chiller machine periodically.
Check functioning of water flow switch and interlock in the system.
Check all safety and operating controls for proper functioning and replace if the same is defective for proper sequence of operation of the machine
All the breakdowns including compressor failure will be attended and the visit shall not be counted in periodical inspection.
Check refrigerant filter and drier core, replace the same , if found necessary.
Check oil level and oil heater in the system and top-up the oil if found necessary.
Check chilled water flow by checking pressure drop across the chiller.
Check evaporator and condenser approach and compare the chilled water temperature at full load with the chilled water temperature control.
Seasonal adjustment of controls if required and software upgrade.
Inspect entire system for any unusual condition such as noise, vibration etc.
Supply of electrical parts except electrical spares for incoming panel. (Electrical Spares Like:- fuses, incoming electrical controls, cables etc).
M&L for servicing of back pull out primary chilled water pump with induction motor of Cap- 20 HP operated on 240V, 50 Hz with replacing of box set-04 nos, mechanical seal -01 no, cut off switch 01 no, bearing 02 nos, Air filling in tank complete as per site requirement or as directed by Engr-in-charge.
M&L for servicing of back pull out Secondary chilled water pump with induction motor of Cap- 30 HP operated on 240V, 50 Hz with replacing of box set-04 nos, mechanical seal -01 no, cut off switch 01 no, bearing 02 nos, Air filling in tank complete as per site requirement or as directed by Engr-in-charge.
M&L for servicing of back pull out condensor water pump with induction motor of Cap- 30 HP operated on 240V, 50 Hz with replacing of box set-04 nos, mechanical seal -01 no, cut off switch 01 no, bearing 02 nos, Air filling in tank complete as per site requirement or as directed by Engr-in-charge.
M&L for servicing of back pull out chiller water pumps/condensor water pump with induction motor of Cap- 5 HP operated on 240V, 50 Hz with replacing of box set-04 nos, mechanical seal -01 no, cut off switch 01 no, bearing 02 nos, Air filling in tank complete as per site requirement or as directed by Engr-in-charge.
M&L for servicing of blowers for AHU's with induction motor of Cap- 10 HP operated on 240V, 50 Hz with replacing of box set-04 nos, mechanical seal -01 no, cut off switch 01 no, bearing 02 nos, Air filling in tank complete as per site requirement or as directed by Engr-in-charge.
Notes for item No.3.00 to 7.00 above:
(a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller.
(b) Lubricate bearings with grease guns.
(c) Replace gland thread if required.
(d) Check lubricant oil level and make up the oil if required.
(e) Check packing and mechanical seals for leakage.
(f) Half yearly inspection and service for pumps
(g) Inspect shaft sleeves,shaft, bearings , bearing housing and overhauling of all pumps.
(h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced .
(i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling etc. If found faulty to be replaced by the contractor with out any extra cost.
M&L for taking out & rewinding the existing unserviceable burnt motors of condensor/chiller water pumps (Pressure pumps) of Cap Upto 10 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.
M&L for taking out & rewinding the existing unserviceable burnt motors of condensor/chiller water pumps (Pressure pumps) of Cap from 20 HP Upto 40 HP,Three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & demoisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete.
M & L for Cleaning and spray Painting the surface of condenser pipes and chilled water pipes including all valves and fittings including pumps with two coats of synthetic enamel paint over a neat coat of red oxide primer over 10 cm width of girth and making good to the surfaces of all pipe and valves connections at certain places all as specified and directed
Supply and fix in repair of GI Sheet metal work all as detailed below
(a) GI Ducting as per IS : 655 for 24 Gauge
(b)Pot Strainer of Size 125 mm dia
(c ) Pressure Gauges
(d) Expansion Below of size 200 mm dia
(e) Thermometers
(f) Supply air diffuser with VCD of 225 X 225 MM
(g) Return air diffuser with VCD of 525 x 525 MM
(h) Supply air grill with VCD of 600 x 150 MM
(j) Return air grill with VCD of 900 x150 MM
Supply and fix in repair of insulation for chilled water piping and valves all as specified and diected by Eng-in-Charge
S&F in repair semi automatic star delta starters in sheet steel enclosure AC-3 duty, 415 V, 40 HP,with ralay range 20-33 A. Make:-L&T/ ENGLISH ELECTRIC/ STANDARD/ SIEMENS/ CROMPTON GREAVES
All as per Item no. 13.00 above, But relay range 20-32 and capacity of 30 HP starter complete.
All as per Item no. 13.00 above, But relay range 20-32 and capacity of 20 HP starter complete.
All as per Item no.13.00 above, But relay range 14-23 A and capacity of 10 HP starter complete.
S&F in repair sheet metal enclosure AC-3 duty,415 V Dol Starter of 10 HP capacity and relay range 14-23 A
S&F in repair sheet metal enclosure AC-3 duty,415 V Dol Starter of 5 HP capacity and relay range 7 -14 A
Supply & fix in repair Contactor type- MCX13 of AC3 80 Amp, 415V, 50 Hz .
S&F in repair single phasing preventor of Make-Ellico, Type-ESP-2 , 415 Volt, 50 Hz .
S&F in repair electronic timer of Make-Ellico, Type-S/D-C-100 , 230/415 Volt,
Reapiring / Servicing of complete all electric supply panels for AHU Rooms by cleaning all MCCB Connections and Bus bars with anti rust spray, replacing of nuts & bolts,washers, with suitable lugs of burnt/rust contacts & fitting of screws & rewiring with suitable guage copper conductor/flexible wires, all as required as per ground condition, with tightening of all loose connections, with testing complete on load all as directed by Engr-in-charge. .
M& L for painting of water supply panel with spray painting inside and outside the panel completely.
mahavir industries
Electricals India
ALBA AC AND REF SERVICES
ARTI CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .