Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
22 Oct 2026, 6:00 pm
ExecutiveEngineer,P.H.WorksDivision,Chhotaudepur,Dist:Chhotaudepur
Providing, supplying, lowering, laying and jointing PVC Pipe Line, Supply, Installation, Testing and Commissioning Work of Mono Set Pumping machinery with all Electro mechanical work, Electrification ROU & Crop Compensation Charges etc. Including O&M for 24 Months under Remaining Faliya Connecivity of HATHIPAGLA-UMARVA Water Supply scheme.
350796
07 of 2026-27
Open
Civil Works - Water Works
Works
Chhota Udaipur
2 documents required · 2 mandatory
₹3,600
Executive Engineer, P.H. Works Division, Chhotaudepur
₹2.0 L
1 Oct 2026
1 Oct 2026
1 Oct 2026
22 Oct 2026
1 Oct 2026
Estimated Cost : Rs.
Gujarat Water Supply & Sewerage Board
Zone –I , Vadodara
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
Bid documents for Design, Build and Operate for
Faliya connectivity Work of Hathipagla-Umarva Regional Water Supply Scheme
Taluka: Pavijetpur/Bodeli/Chhotaudepur Dist; Chhotaudepur
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
Name of Work:-Bid documents for Design, Build and Operate for
Remaining Faliya Connectivity Work of Hathipagla-Umarva Regional Water Supply Scheme
Taluka: Pavijetpur/Bodeli/Chhotaudepur Dist; Chhotaudepur
The rates and prices shall be submitted in the electronic formats given by n-procure which is called
Schedule-B. Rates and prices received in any other formats will be rejected and the Bids will be
(1) It will be entirely at the discretion of the Employer to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted
to withdraw his bid on this account.
supplied from the by client.
(3) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
and evaluation.
(6) Wherever for a particular item the quantities have been specified payment shall be on
unit rate basis and unit variation in quantity will be paid with pro rata basis.
(7) Each item is to be individually priced online and the amounts shall be added up to
be left blank except where the item description requires the item to be priced on "as
applicable” basis. The item shall not be priced if it is “not applicable” to the bidder’s
design, in which case the bidder shall add the words “NOT APPLICABLE”. The wording
in the item description is for subject matter guidance only; clause references are
indicative only and all other relevant clauses shall also be referred to. The prices shall
allow for all the works covered under the bid and all liabilities and contractual
obligations whether separately specified or not. Items against which no prices are
quoted shall not be separately paid for and the bidder shall be deemed to have covered
the cost of execution of such items (according to the requirements of the bid
document) in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid for
by the Employer when executed and shall be deemed to be already covered by other
items and rates listed in the price sheets No extra payment shall be given for any item
which is required to complete and perform the project.
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor. The
will be considered for financial evaluation of the bid.
(10) Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to
be taken as mutually explanatory of one another.
(12) The bidder shall interpret the data furnished and carry out any additional survey work,
or investigation work required at his own cost.
(13) The prices quoted shall also include the cost of materials utilized for testing.
(14) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at his
own cost. These accesses will be used by the other contractors working for GWSSB.
prices shall include all the equipments / materials / accessories and services required
(16) 1% of the value of work will be deducted from the Running bill against labour cess
which is non refundable.
(17) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(18) Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(19) The Rates quoted shall be exclusive of GST, But inclusive of all other taxes, duties
which shall be not paid extra. while GST will be paid for admissible part of actual work
done at the approved tender rates and tender conditions of price variations. GST shall
be paid as per prevailing rates at the time of payment. The TDS shall be deducted at
source as per provision of IT rules and GWSSB policy.
(20) The rates should be quoted exclusive of GST But inclusive of all other taxes as per
Volume-I (B), General Conditions of Contract, Clause No.
(21) The rates quoted shall be inclusive of all taxes, duties and GST, which shall not be paid
extra. The TDS shall be deducted at source as per provision of IT rules and GWSSB
(22) The Bidders shall have to quote the rates in this tender keeping in view of the GST. The
Complete responsibility of taxes, duties, levies rests with the Contractor/Agency only.
(23) The process requires that the bidder shall quote his price for the work components
fix during the entire period of performance of the contract except price variation
allowed for supply of MS/DI/PVC/GI pipe as per Volume-IBClause No. 59, General
Conditions of Contract.
(24) Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada Water
Resources, Water Supply &Kalpsar Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell ( K-
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be recovered from the
running bills of the work from time to time and remaining amount if any shall be
recovered from the final bill before releasing the security deposit of the work.The
contractor shall furnish the statement showing the quantity of quarried materials /
minerals from whom purchased ( with full address of the seller) and copies of the bills
for purchase to the Executive Engineer of the in charge of the work. The contractor
shall also furnish such additional information as regards royalty payment to the
competent authority.
(25) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non compliance entire responsibility shall be rest
with the agency and required amount shall be recovered from any due amount of the
(26) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
(27) The contractor shall apply fair means of stock maintenance and shall adopt accounting
standard as may be prescribed under GST Act as applicable in the state of Gujarat. For
arriving at the difference in procurement prices due to introduction of GST it will be
open for the Board to ask for original invoices, lorry receipt, weigh bridge slips,
payment details and such other documents as may be required for the purpose.
(28) The claim of contractor regarding GST shall have to be backed by documentary
evidence substantiating the actual payment of tax duly certified by the competent tax
authority. The final decision regarding the quantum of claim amount to be recovered or
reimbursed shall be of the competent authority of the GWSSB and shall be binding on
the contractor.
Signature of contractor Executive Engineer
P.H.Work Division
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVSION
SUB: Bid documents for Remaining Work of Providing, supplying, lowering, laying and jointing PVC Pipe Line,
Supply, Installation, Testing and Commissioning Work of Mono Set Pumping machinery with all Electro
mechanical work, Electrification ROU & Crop Compensation Charges etc. Including O&M for 24 Months under
Remaining Faliya Connecivity of HATHIPAGLA-UMARVA Water Supply scheme.
Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
Addenda/Amendments to the above, for the execution of the above Contract, we the
undersigned offer to design, Engineer, procure, construct, complete, commission, operate and
maintain the whole of the said works for 2 years from the date of commissioning including
defects liability period as given in Conditions of Contract and in conformity with the drawings,
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed price of
Construction includingfree trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
1. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the inspectionand
testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to
theconditions/stipulations of the Contract, the Engineer will be at liberty to take any action
including termination of Contract and impose at his absolute discretion any penalties, and/or
reject the work.
2. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract within _________ months, inclusive of monsoons, from the date or receipt of
Letter of Acceptance issued to us by you.
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
3. We agree to abide by this Bid for a period of 180 days from the Last date of submission of the
bill and it shall remain binding upon us and may be accepted at any time before the expiry of
4. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract there to annex but until such agreement is
prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
5. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of value
specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
6. We have independently considered the amounts of liquidated damages shown in Appendix to
Bid and agree that they represent a fair estimate of the damages likely to be suffered by you in
the event of the work not being completed by us in time.
7. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
NAME OF SCHEME –Bid documents for Design, Build and Operate for
Remaining Work For Faliya Connectivity of Hathipagla-Umarva Regional Water Supply Scheme
Taluka: Pavijetpur/Bodeli/Chhotaudepur Dist; Chhotaudepur
Schedule showing the approximately the materials to be supplied to the contractor from
Government stores for the work to be executed and the rate at which they are to be charged ::
Rate at which the Place
materials bill be of
Sr. No. Particulars. Qty. charged to the charge
contractor. deliver
1.The person or the firm submitting the tender should see that the rates of above schedule are filled up by the
executive Engineer or in charge of the work before issuing the tender.
2.The contractor should have to make his own arrangement for loading, unloading & carting of material issued
from department from store to site of work.
3.Material other than that as shown in schedule A, required for work will be procured by contractor at his own cost,
it will be issued to the contractor if it is available with department subject to approval from competent authority and
rate will be charged at issue rate or market rate whichever is higher. Contractor has to deposit full amount for
materials to be issued other than as shown in Schedule "A".
4.Recovery will be made at the double rate of Purchase rate in case of use of material by contractor other then the
5.As per availability of material & as per instructions from competent authority contractor should have to make his
own arrangement for loading, unloading & carting the materials other than as above.
6.Work should not be sub. let to other contractor if it will come to notice of department, contract will be terminated.
7.If any material stolen or misplaced the same will purchase by contractor and same shall be fixed by contractor at
his own cost and recovery for reissued material will be made from the bill of contractor at Board R.C. / S.O.R. rate
whichever is higher. Contractor has to do the police procedure for stolen material at his own cost.
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
(A) old materials required after repairing or replacement shell be return to the department by to agency
8.Contractor has to use the material of standard quality after approval from in-charge officer
9.All material including tools & plants & man power required for work shall be procured by contractor at his own
10.All illegal connection should be removed by the Contractor at own cost.
11.The materials issued free of cost as above shall be utilized in work as per requirement. Balance materials on
completion of work shall have to be returned in safe and sound condition at the departmental store specified in the
12.In case of any shortage or damaged to the material issued to the contractor the cost of the same shall have to be
recovered from contractor two times the issue rate. Issue rate will be calculated at mentioned above in Schedule -
13.Materials not included in Schedule-"A", but required in the work shall be provided by the bidder and cost of
such materials shall not be paid extra.
14.The amount recoverable from the contractor by the GWSSB on any account shall be liable to be recovered from
the amount payable to the bidders under this clause.
15.The required MS/DI Specials such of tee, Saddle, Bend, Reducer pipeline shall be brought by the contractor for
which no extra payment will be made.
16.The Materials to be brought/ purchase by the contractor shall be got approved from the EIC before using in the
Dated Signature Engineer
of contractor Works Division
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
Name of Work: Remaining Faliya Connectivity of Hathipagla-Umarva RWSS
Taluka: Pavijetpur/Bodeli/Chhotaudepur Dis: Chhotaudepur
SUMMARY OF SCHEDULE-B
Name of Work:- Remaining Work of Providing, supplying, lowering, laying and jointing PVC Pipe Line,
Supply, Installation, Testing and Commissioning Work of Mono Set Pumping machinery with all Electro
mechanical work, Electrification ROU & Crop Compensation Charges etc. Including O&M for 24 Months under
Remaining Faliya Connecivity of HATHIPAGLA-UMARVA Water Supply scheme.
Sr No. Name of Work Amount Rs.
Rising Main(28.978 km) and Gravity Main(26.033
SCHEDULE B-2 Pumping Machinery
SCHEDULE C O&M Civil+Mechanical (24 Months)
I / We am / are willing to carry out the work at_________ % above / Below percent (should be written in figure and
words) of the estimated rates mentioned above amount of my / our tender works out as under.
Estimated amount Put to tender: Estimated amount Put to tender:
Deduct ______ % above Rs. ____________ Add ______ % above Rs.
In words Rupees __________________________ In words Rupees __________________________
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
Name Of Scheme: Remaining Faliya Connectivity of HATHIPAGLA-UMARVA RWSS
ABSTRACT SHEET-Schedule-B1 Rising Main and Gravity Main Pipeline
Quantity Unit Rate Amount
1 Providing and supplying in standard length ISI
mark rigid unplasticised PVC pipes suitable for
potable water with ring fit joint including cost of
rings, as per IS specification no. 4985/1988
including all local and central taxes,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to the
departmental stores and including cost of
jointing meterial etc. complete.
1)one coupler/Ring shall be provided with each
full length pipe cost of which is included in rates
2)3% (Three)Discounted rate to be consider for
Coupler jointed pipe
3)Rate For PVC Resin as Rs.91739/MT (Price
a 90 mm dia P.V.C Pipe-6 Kg/Sqcm 50705 Rmt. Rs. 139.00 Rs.
b 110 mm dia P.V.C Pipe-6 Kg/Sqcm 4306 Rmt. Rs. 199.00 Rs.
2 Providing and Supplying at site or store PVC
specials inclusive all taxes etc. Complete.
Socket & Spigot type
90 to 315 mm dia. (2% of PVC pipe cost)
as per resin rate
A PVC Coupler 6kg/m.cm (Fabricated)
A.a 90 mm dia PVC 170 No. Rs. 78.00 Rs.
A.b 110 mm dia P.V.C 70 No. Rs. 133.00 Rs.
B PVC T.P. with PVC Flange Heavy Duty(Moulded)
B.a 90 mm dia PVC 80 No. Rs. 236.00 Rs.
B.b 110 mm dia P.V.C 40 No. Rs. 320.00 Rs.
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
C Service Saddle 25 mm(Moulded)Heavy
C.a 90 mm dia PVC 140 No. Rs. 167.00 Rs.
C.b 110 mm dia P.V.C 45 No. Rs. 184.00 Rs.
D PV C Elbow(Moulded)
D.a 90 mm dia PVC 85 No. Rs. 216.00 Rs.
D.b 110 mm dia P.V.C 30 No. Rs. 358.00 Rs.
E PV C Bend 90 Degree Moulded (Heavy)
E.a 90 mm dia PVC 70 No. Rs. 318.00 Rs.
E.b 110 mm dia P.V.C 40 No. Rs. 519.00 Rs.
3 Providing , Supplying and Delivery of ISI mark CI
Double flanged Sluice Valve as per IS:14846 of
following class and diameter including all taxes,
insurance , transportation, freight charges,
octroi, inspection charges , loading , unloading,
conveyance to departmental stores, stacking etc.
(A&B) SLUICE VALVE AND SCOUR VALVE
(A) SLUICE VALVE PN 1.0 with Hand or wheel cap
operated as instructed by Engineer in Charge (PD
type Short Body)
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
4 Providing,Supplying, Delivery and fixing of C.I.
Double Acting Temper proof air Valve with
Isolating sluice valve of approved make & quality
of following class, diameter and constructing
R.C.C shaft on air valve as per type design
Mt. height following different diameter and
accordingly Suitable diameter of G.I pipe & RCC
M-15 with reinforcement work in RCC column of
4.20 mt. height as per technical specification
including all taxes, insurance, transportation,
freight charge, octroi, inspection charge, loading,
unloading, conveyance to department stores,
stacking etc. complete. Air riser job work is to be
executed as per approved drawing by the
Department (A) Temper proof Double acting air
valve with Isolating SL valve
(A) C.I Tamper Proof Air Valve(As per RA)
5 Excavation for pipe line trenches including all
safety provisions using site rails and stacking
excavated stuff up to a lead of 90 mtr.cleaning
the sites etc.complete.for lifts and strata as
(A) FROM DEPTH 0.00 TO 1.50 MTR.
a In all sorts of soil and soft murrum 13862.77 CMT Rs. 93.45 Rs.
b In hard murrum,boulders including macadam 13862.77 CMT Rs. 141.75 Rs.
c In soft rock and / or masonry in CM or L M or 6931.39 CMT Rs. 171.15 Rs.
6 Excavation in bituminous road as per required 116 CMT Rs. 263.55 Rs.
gradient and line including safety provisions
using site rails and stacking excavated stuff
including up to all required lead cleaning the site
etc. complete for all lifts as specified.
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
7 Road reinstatement of asphalt road pavement 116 CMT Rs. Rs.
including providing and supplying all materials,
labour including soling, metalling, grouting with
tack coat, carpet, seal coat etc.
complete.(Providing and casting in situ mass
cement concrete in grade M-10 (approx. corresp.
to prop. 1:3:6) using granite quartzite trap metal
of size 12 mm to 25 mm incl.
consolidation curing etc. complete.)(Without
8 Lowering laying and jointing PVC pipe and
specials of following class and diameter including
cost of conveyance form stores to sites of works,
including cost of labour, materials except cement
solvent giving satisfactory hydraulic testing as
a 90 mm dia P.V.C Pipe-6 Kg/Sqcm 50705.00 Rmt. Rs. 17.85 Rs.
b 110 mm dia P.V.C Pipe-6 Kg/Sqcm 4306.00 Rmt. Rs. 19.95 Rs.
9 Lowering, laying and jointing in position
following C. I. Double Flanged Reflux valves,
Butterfly valves, Sluice valves and Air valves
including cost of all labour, jointing material,
icluding nut bolts and giving satisfactory
hydraulic testing, etc. complete. A) SCOUR
VALVE/ SLUICE VALVE
(A) SCOUR VALVE /SLUICE VALVE/AIR VELOCITY
ii. 100 10 Nos. Rs. 460.95 Rs.
10 Providing C.C.M.:100 for encasing pipes using 194.41 CMT Rs. Rs.
trap metal size 12 mm to 50 mm incl. form work
curing consolidation etc. complete for various
location on pipe line as directed by EIC. Using
trap metal 20 mm nominal size
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
11 Construction of valves chambers in brick or bela
stone masonry, locally available in C. M. 1:6.
Foundation concrete 150 mm thick in C. C. 1:4:8
of trap metal size 25 mm to 40 mm thick, inside
cement plaster in C. M. 1:3 and cement pointing
outside in C. M. 1:3 and top cover of precast RCC
slab 100 mm thick (with key hole in two parts,
each with handles or MS Bar etc. complete as
given size) Upto 1 Mt. depth from G. L. to pipe
invert level incl. complete civil works but excl.
cost of excavation and refilling, with cast in situ
RCC slab in one single piece with fixing of CI-MH
Frame and cover (excl. cost of CI-MH Frame and
cover) with 23 mm thick brick masonry wall in
C.M.1:6. Chamber must be 1.0 Mt deep or
atleast 30 cm below invert level of pipe. Note:
No extra payment shall be paid for extra
excavation. With precast slab in two parts 15 cm.
With precast slab in two parts 15 cm.
For SLUICE VALVE & SCOUR VALVE 70 Rs. Rs.
For Extra Depth 17.50 mtr Rs. Rs.
12 Refilling the pipe line trenches including 34100 Cum Rs. 23.10 Rs.
ramming,……. of 3 kms.
13 To carry out survey work Co-Ordination liasation
for "Standing crop compensation"in land for
laying water supply pipeline along the alignment
of Hirola Regional Water Supply Scheme
including shifting of center line marking it on
village map and hissa to be taken for Standing
crop compensation and submission of drawing in
4 sets drawn in the scale of 1 cm=25 mt.along
with original tracing showing and marking their
own survey numbers with CD 4 nos. etc. and
defining Standing crop compensation strip of
15.00 m. along the cross country in width on the
map and showing revenue survey number wise
area and other details as per detailed
specifications. For Job work for legal formalities
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
including getting copy of 7/12, 6-A,form of
perticular land non judicial Stamp paper, & all
required activities with all documents.
For Job work for legal formalities including
getting 7/12, 6-A, non judicial Stamp paper, & all 551.00 Nos. Rs. 710.00 Rs.
required activities with all documents.
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
Gujarat Water Supply & Sewerage Board
NAME OF SCHEME:- REMAINING FALIYA CONNECTIVITY OF HATHIPAGLA-
REGIONAL WATER SUPPLY SCHEME
SCHEDULE B-2 Pumping Machinery
Sr. No. Item Qty Unit Rate AMOUNT (Rs.)
MECHANICAL WORKS
1 SITC Monoset sub. pump 3 phase 10 No
400/440 vott, 50 c/s. A.C. Supply &
2900 RPM , following IS 14220 MOC :
Casing: CI-FG260, Impeller : Bronze &
Discharge: 440 LPM, Head 52 Meter,
2 ..do.. Discharge: 700 LPM, Head 70 5 Each
3 SITC of DOL / Star Delta starter suitable 10 No
for local & remote pump control
application consisting of MPCB,
overload relay and contactors as per
Type II coordination including digital
voltmeter, analogue ammeter with
selector switch, run hour meter,
required protective relays & control
accessories. for sub.pump
SD from 11 to 15 HP
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
4 Auto transformer starter suitable for 5 No
local & remote pump control
application consisting of Auto
Transformer (vacuum impregnated, air
cooled having three (3) tappings at
50%, 65% and 80%), incomer MCCB /
MPCB, overload relay and contactors
as per Type II coordination including
digital MFM with RS
communication port, analogue type
ammeter with selector switch, run
hour meter, required protective relays
& control accessories
A. T. S. from 21 to 30 HP
5 PVC insulated round submersible cable 500 mtr
as per detailed technical specifications
of R/C of GWSSB conforming to IS 694,
TOTAL (MECHANICAL)
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
REMAINING WORK FOR FALIYA CONNECTIVITY OF HATHIPAGLA-UMARVA RWSS
TALUKA:- Pavijetpur/bodeli/chhotaudepur District:- Chhotaudepur
SCHEDULE C O&M Civil+Mechanical
Sr Item Qty. Unit Rate Amount
1 Item No.1 :: Distribution of water from village level sump to existing
storage/Mini pipe/Existing cistern - ESR/HGLR by operation and maintennce of
pumping machineries at sump including maintenance of all the components of the
project including existing pipeline & storage / Existing - ESR/GHLR, SITC of
pumping machinery and its manifold system as directed, rising main pipe line,
gravity pipeline of various sizes and class to feed water to included faliyas of
benefical villages and other population and mini water supply scheme of all
benefical village population of Faliya connectivity of Hathipagla-Umarva
Regional Water Supply Scheme, including O&M of Proposed and Existing work
for 24 Months Regional Water Supply Scheme including supply of skilled
manpower as operator cum lineman cum valve man at each of villages, materials,
tools & plants articles, vehicles etc. including O&M charges for all type of valves
with valve chamber. The job includes operation of pump and its repairing,
maintenance of pipeline with repairing of CID joint and other ancillary component
includes convey drinking water in such a way to supply net water at 100 LPCD for
all the faliyas of villages duly chlorinated with 0.20 PPM available residual 12 Month 60225.69
chlorine at tail end service point. It also includes chlorination of water if required
with material supply, cleaning of sump, existing storage/ESR, periodically etc. and
also maintaining all components in original position with rapairing to structure.
The scope also includes operation and maintenance of pumping machineries @
sump/HGLR without interruption of drinking water problems to people of
included faliyas of all benefical village population of Faliya connectivity of
hathipagla-Umarva Regional Water Supply Scheme. The scope also includes the
effective operation and maintenance by carrying out terms and conditions of
preventive measures indicated in respective volume of this tender. The scope of
work also include diamantling / reinstallation of all new mavhinery including all
kind of repairing and maintenance, all type of record keeping, water meter
insatallation / repairing, reading and data colection & also record keeping and any
instruction for O & M as directed by department.
for First Year (12 Month )
2 For Second Year
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-
LIST FOR EQUIPMENTS/ INSTRUMENTS REQUIRED FOR SITE OFFICE WORK.
Item Description
Agency has to procure and must supply at site free of cost and handover to Engineer in charge
Within one month from date of work order given as under.
No. Description Nos. of item
1 HP All in one PC, 27 inch screen, Intel core i5 13th generation
processor, 16 gb ram, 1 tb ssd hard disk, wireless keyboard- 2.0 Nos.( PC)
2.0 Nos.(Printer)
mouse, Windows 11 home edition and Duplex Laser Printer as
approved by Engineer in Charge
Note: - All above item must be provided by Agency at free of cost.
Signature of Executive Engineer
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-Umarva RWSS
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey
Contract on EPC basis, the provision of measurement will be applicable only for the assessment
of value of work done for inclusion in any interim certificate for part payment to the
2. The Schedule specifies the procedure for all such assessment of the items specified in Schedule
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each items specified in Schedule B, based
on the Employer's best appreciation of the value of the component as related to the total costs
of the concerned item as whole. A head titled (any other item(s)) is included in each
breakdown of schedule and the tenderer shall at the time of tendering indicate any additional
items which he considers necessary but cannot be covered by any of the heads indicated in the
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used for
assessment of percentage progress of the component at any stage. By measurement jointly
taken by the Employer's Representative and the Contractor, mutually agreed and entered in the
measurement books in the form and by the method approved by the Employer's Representative,
and signed jointly by both the parties.
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-Umarva RWSS
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to
a. On receipt of materials at project site 65 % of Quoted rate
b. On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c. On Hydraulic testing 5 % of Quoted rate
d. On refilling and disposal of surplus stuff 5 % of Quoted rate
e. After commissioning 5 % of Quoted rate
a. On receipt of materials on site 70 % of Quoted rate
b. On erection 20 % of Quoted rate
c. On Hydraulic testing 5 % of Quoted rate
d. After commissioning 5 % of Quoted rate
3 PUMP ROOM /Chlorination Room
a. On approval of Designs 2.0 % of Quoted rate
b. On completion of Excavation & base slab 18.0 % of Quoted rate
c. On completion of vertical wall up to plinth 20.0 % of Quoted rate
d. Full supporting structure incl. ring beam and top slab 15.0 % of Quoted rate
e. On completion of pump house incl. fixing doors 10.0 % of Quoted rate
f. Plastering inside & outside with epoxy paint etc 10.0 % of Quoted rate
(completed with all respects)
g. Painting of letters, MS ladder pipe, railing and all 15 % of Quoted rate
miscellaneous items such as snowcem paints in three
coats etc. (completed with all respects)
h. After Completion 10 % of Quoted rate
4 GROUND (UNDERGROUND) LEVEL SERVICE
RESERVOIRS/SUMPS
a. On approval of designs 2 % of Quoted rate
b. On completion of excavation and base slab 18 % of Quoted rate
c. On completion of vertical wall and braces 20 % of Quoted rate
d. Full supporting structure including column, ring beam 15 % of Quoted rate
and completion of top slab / dome
e. Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate
f. Procurement and fixing of inlet, outlet, washout, 15 % of Quoted rate
overflow pipes, valves, specials, chambers, lighting
arrester conductor and specials at site
g. Water level indictor, painting of letters, M.S ladder, 10 % of Quoted rate
pipes, railing and all miscellaneous items such as
exterior whether proof emulsion paint in three coats
etc (Completed with all respect) including water
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining For F. C. of Hathipagla-Umarva RWSS
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to
h. On hydraulic testing 10 % of Quoted rate
5 All Electro-mechanical works and Instrumentation
a. On supply of material at work site in good condition 65% of Quoted rate
b. On erection of Equipment 25% of Quoted rate
c. On completion of Testing & Commissioning of 5% of Quoted rate
d. Satisfactory running of system. 5% of Quoted rate
A On completion works as per approved drawings 95% of Quoted rate
B After commission of system 5% of Quoted rate
6 Elevated Storage Reservoir
a. On submission of Designs 2.5% of Quoted rate
b. On approval of Designs 2.5% of Quoted rate
c. On Completion of excavation 7.5% of Quoted rate
d. On completion of staging height up to reservoir 22.5% of Quoted rate
e. On Completion of Floor Reservoir 22.5% of Quoted rate
f. On Completion of walls of Reservoir 22.5% of Quoted rate
g. On Completion of Roof of reservoir with all related 20.0% of Quoted rate
piping and other works including Water level
indicator, painting of letters, M.S ladder, pipes,
railing and all miscellaneous items such as exterior
whether proof emulsion paint in three coats etc
(Completed with all respect) including water
7 Miscellaneous work
A All other items such as encasing, columns support for 80% of quoted rate on
culvert, pipe bridges for Canal /Drain/Khadi crossing, completion of works
internal roads, railway/highway crossing, , Cattle
Trough, Stand Post, Anchor/thrust blocks, steel
bridge for pipe crossing, etc
B On commissioning of the system 20% of quoted rate
8 Operation and Maintenance
a Every month in equal instalment based on quoted
prices of O & M will be paid considering minimum
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-Umarva RWSS
Note: Any Changes to be made in all above Payment Schedule can be decided by Chief
Engineer, Zone-1, Vadodara and it shall be binding to the contractor.
GWSSB, Chhotaudepur
Volume-III, PRICE BID Remaining Work For F. C. of Hathipagla-Umarva RWSS
GWSSB, Chhotaudepur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. DMO_2941_01-Apr-2026_744.pdf
2. Affidavit-GwSSB 300 stamp.pdf
3. G.S.T. all Circular.pdf
4. Insurance-GR.pdf
5. Labour cess GR.pdf
6. Time limit circular.pdf
7 .I.P Address GR.pdf
8. GWSSB Circular.pdf
10. Price Variation Paripatra 2023.pdf
11. 2024-10-03.pdf
12. Labour Rate 2026.pdf
1. VOL 1 A Technical Bid HU (2) (1).pdf
2. VOL 1 B GCC HU.pdf
3. VOL-2A-Extent-of-work HU.pdf
4. VOL 2B Tech Spec Civil HU.pdf
5. VOL 2C Tech Spec Ele. Mech HU Updated.pdf
6. VOL 2D Data sheet HU.pdf
7. VOL 3 Price Bid HU Update.pdf
8. O AND M Volume 1 DTP HU.pdf
9. Integrity Pact and Insurance.pdf
10. HU RWSS Estimate.pdf
Nit 7 2026-27 f.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .