| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | L1 | Accepted-AOC Being labour contract society preference given 10 percentage above the lowest tender | |
| 2 | Rejected-Technical N A | NA | NA | 121004 | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | Anoop D L1 | KAMALASANAN.P.K L3 | K Abdul Rehiman L4 | Pathanamthitta Engineering & Labour Contract Co-operative Society Ltd PT 316 L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 49.4 | cum | 286.7 ₹14,162.98 Lowest | 305.76 ₹15,104.54 | 300 ₹14,820 | 305 ₹15,067 |
| 1.00 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 24.7 | cum | 6,332.51 ₹1,56,413 Lowest | 6,742.95 ₹1,66,550.87 | 7,200 ₹1,77,840 | 6,742 ₹1,66,527.4 |
| 1.00 | 5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 17.2 | sqm | 307.77 ₹5,293.64 | 328.23 ₹5,645.56 | 280 ₹4,816 Lowest | 328 ₹5,641.6 |
| 1.00 | 5.22.1 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile
steel bars | 1,550 | Kg | 88.9 ₹1,37,795 Lowest | 94.81 ₹1,46,953.95 | 110 ₹1,70,500 | 94 ₹1,45,700 |
| 1.00 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.7 | cum | 8,359.49 ₹2,06,479.4 Lowest | 8,915.45 ₹2,20,211.62 | 8,600 ₹2,12,420 | 8,914 ₹2,20,175.8 |
| 2.00 | Road 4.1. B.1 Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired
density, complete as per clause 401. Grading-V - For sub-base cum drainage layer -
Mix in Place Method | 49.4 | cum | 2,864.99 ₹1,41,530.51 Lowest | 3,055.51 ₹1,50,942.19 | 3,300 ₹1,63,020 | 3,054 ₹1,50,867.6 |
Tender Value
₹8.3 L
EMD Value
₹20,800
Closing Date
8 Oct 2025, 5:00 pmClosed
DIVISIONAL FOREST OFFICER
DIVISIONAL FOREST OFFICER TIMBER SALES DIVISION PUNALUR
Formation of concrete road reach 1 at Govt timber depot Areekkakavu 25 26
2025_FD_802020_1
KFDDO/52444/25/DFOTSPNLR/P2
Open Tender
Civil Works - Roads
Item Wise
20 days
Areekkakavu
Refer tender notice
5 documents required · 5 mandatory
₹2,000
₹20,800
29 Nov 2025
27 Sept 2025
13 Oct 2025
27 Sept 2025
8 Oct 2025
27 Sept 2025
Amount
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.1 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and Medium Tensile steel bars
5.1.2 Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
Road 4.1. B.1 Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
Pathanamthitta Engineering & Labour Contract Co-operative Society Ltd PT 316 (BID ID -2378456)
KAMALASANAN.P.K (BID ID -2378813)
K Abdul Rehiman (BID ID -2378104)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1332380.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .