Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹43,891.27Admitted-Finance | -34.12% | ₹43,891.27 | L1 | Admitted-Finance |
| 2 | L2₹47,062.52+₹3,171.26 (7.23%)Admitted-Finance | -29.36% | ₹47,062.52+₹3,171.26 (7.23%) | L2 | Admitted-Finance |
| 3 | L3₹53,365.06+₹9,473.80 (21.6%)Admitted-Finance | -19.90% | ₹53,365.06+₹9,473.80 (21.6%) | L3 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
31 Jul 2026, 3:00 pmClosed
Office of the XEN CID Kishtwar
Office of the XEN CID Kishtwar
Maintenance Damaged works if any including petty works to be executed at site as per necessity demand emergent nature for upkeeping restoration protection of water conductor canal or any other important works of Bhaderwah HEP Stage Contract
2026_SPDC_314259_1
e-NIT 02 of 2026-27
Open Tender
Civil Works
Percentage
365 days
Bhaderwah
as per SBD
2 documents required · 2 mandatory
₹1,000
Yes
Chief Pay and Accounts Officer Kishtwar
₹20,000
Yes
Office of the XEN CID Kishtwar
18 Aug 2026
3 Jul 2026
1 Aug 2026
3 Jul 2026
31 Jul 2026
3 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil | 1 | cum | 91.75 | ₹91.75 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 1 | cum | 592.9 | ₹592.9 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.Ordinary Rock | 1 | cum | 940.3 | ₹940.3 |
| 4 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 1 | sqm | 24.12 | ₹24.12 |
| 5 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1 | sqm | 12.49 | ₹12.49 |
| 6 | Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1 | sqm | 6.35 | ₹6.35 |
| 7 | Demolishing of stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 m lead. | 1 | cum | 1,740.45 | ₹1,740.45 |
| 8 | Removing cement motor and cleaning of serviceable material for reuse | 1 | cum | 496.05 | ₹496.05 |
| 9 | Crushed Stone in foundation including supply. | 1 | cum | 903.35 | ₹903.35 |
| 10 | Dumping soling stone excluding cost of stones in Horizontal on level | 1 | cum | 237.9 | ₹237.9 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
SBD2.pdf
Tender Documents • 0.61 MB
BOQ_1017640.xls
BOQ • 0.39 MB
AMCBhaderwah.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .