Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.8 LAdmitted-Fee/PreQual/Technical/Finance | -21.13% | ₹15.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹19.7 L+₹3.9 L (24.9%)Admitted-Fee/PreQual/Technical/Finance | -1.50% | ₹19.7 L+₹3.9 L (24.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-GST 3-B uploaded for the month of June instead of July 2026. Accordingly the bid has been assessed as Non-Responsive. |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Same EMD uploaded for the NIT no. 56 S no. 01. Accordingly the bid has been assessed as Non-Responsive. |
Tender Value
₹20.0 L
EMD Value
₹39,980
Closing Date
7 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Tangmarg
Executive Engineer RnB Division Tangmarg
Up-gradation of road from Jamia Masjid Pandithpora Bala to Rambail via Shirpora.
2026_PWDJK_322611_5
NIT No. 65/RnB/Tangmarg of 2026-27
Open Tender
Civil Works
Percentage
50 days
Tangmarg
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
Executive Engineer RnB Division Tangmarg
₹39,980
8 Sept 2026
27 Aug 2026
8 Sept 2026
28 Aug 2026
7 Sept 2026
28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying nalla muck/GSB incl. watering, ramming and consolidation with 8 to 10 tone capacity road roller incl all carriages complete job. | 591.5 | Cum | 1,200 | ₹7,09,800 |
| 2 | P/L water bound macadam base course with quarry crushed stone aggregate 63-45mm size stone screening 13.20 mm size and binding material as per MORTH specificatioin including screening, sorting spreading to template and consolidation with PRR of 8 to 10 tonne capacity incld. Carriage of quarry crushed stone aggregate and stone screening, stone duist from approved source upto site of work complete (Finished work to be measured) 75mm compacted thickeness including all carriages involved. | 273.75 | Cum | 2,400 | ₹6,57,000 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 421.8 | Cum | 256.85 | ₹1,08,339.33 |
| 4 | Providing and laying of stone soling (hand packed) in foundation trenches and ramming, including all leads, lifts carriage complete. | 3.6 | Cum | 1,100 | ₹3,960 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including all carriages complete job etc. | 2.7 | Cum | 5,202.9 | ₹14,047.83 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 54 | Cum | 5,733.6 | ₹3,09,614.4 |
| 7 | Centering and shuttering including strutting, propping etc. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 144 | sqm | 628.95 | ₹90,568.8 |
| 8 | Providing and laying in position PVC Pipes 75 mm dia for weep Holes complete Job | 81 | RM | 150 | ₹12,150 |
| 9 | Supply and Filling of nallah muck / boulders behind R/wall incl. carriage of same upto site of work complete. | 31.73 | Cum | 1,100 | ₹34,903 |
| 10 | Providing and laying RCC spun pipes incl laying of proper cushion incl cost of Earth work ,jionting of pipes in proper position incl all carriages complete job. 12"dia | 2.98 | RM | 3,000 | ₹8,940 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1082562.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .