Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 LAccepted-AOC | 1 | Accepted-AOC L1 bIdder accepeted | |
| 2 | 2₹4.0 L+₹22,872 (6.00%)Rejected-AOC | 2 | Rejected-AOC L2 BIDDER rejected |
| Sl No | Description | Qty | Unit | NOUSHAD T S L1 | MARTIN P STEEPHAN L2 |
|---|---|---|---|---|---|
| 1.00Appendix | |||||
| 1.00 | 13.50.4:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat) | 27.68 | sqm | 37.3 ₹1,032.28 Lowest | 39.54 ₹1,094.27 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 27.68 | sqm | 164.86 ₹4,562.5 Lowest | 174.75 ₹4,836.21 |
| 1.00 | OD10940/2025-2026:structural steel work for maintaining existing damaged shutters of size 0.9*0.5 replacing damaged sheet of 16 gauge GI sheet Fixing in position, welding, grinding fixing in required box sections etc complete and applying a priming coat of approved steel primer etc complete. ( 0.9*0.5=0.45m2*12.648 kg/m2=5.6916 kg add 5% wastage =5.97618kg) | 3 | each | 3,530.1 ₹10,590.3 Lowest | 3,741.91 ₹11,225.73 |
| 1.00 | OD10941/2025-2026:Structural steel work for maintaining existing damaged shutters of size 1.75*0.5 replacing damaged sheet of 16 gauge GI sheet Fixing in position ,welding, grinding fixing in required box sections etc complete and applying a priming coat of approved steel primer etc complete.
( 1.75*0.5=.875m2*12.648 kg/m2=11.067kg add 5% wastage =11.62kg) | 11 | each | 4,736.49 ₹52,101.39 Lowest | 5,020.68 ₹55,227.48 |
| 1.00 | OD10939/2025-2026:Labor charges for handling and conveying steel frames and shutters to and from Chirayam bund site to Karumaloor No:1 pumping station and stacking the same conveniently as directed by the departmental officers at site. | 14 | each | 1,082.18 ₹15,150.52 Lowest | 1,147.11 ₹16,059.54 |
| 1.01 | OD10943/2025-2026: Labor charges for handling and fixing shutters frame, shutter after removing the soil from the bed and cleaning the groove and the bed of the sluice as directed by the departmental officers at site. | 15 | each | 1,082.18 ₹16,232.7 Lowest | 1,147.11 ₹17,206.65 |
| 1.01 | OD10942/2025-2026:Labor charges for taking out the shutters from the bund and cleaning the same as directed by the departmental officer at site. | 10 | each | 1,082.18 ₹10,821.8 Lowest | 1,147.11 ₹11,471.1 |
| 1.01 | OD10944/2025-2026: Labor charges towards watching and maintaining the bund during season including operating of the shutters of the sluice as directed by the departmental officers at site. | 180 | each | 1,082.18 ₹1,94,792.4 Lowest | 1,147.11 ₹2,06,479.8 |
| 1.01 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 136.64 | kilogram | 116.69 ₹15,944.99 Lowest | 123.69 ₹16,901.5 |
Tender Value
₹3.8 L
EMD Value
₹9,531
Closing Date
13 Oct 2025, 4:00 pmClosed
Assistant Executive Engineer
ASSISTANT EXECUTIVE ENGINEER MI SUBDIVISION ALUVA
ANNUAL MAINTENANCE4
2025_Irrig_805920_1
IRR/IA/TR/3726/2025_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
240 days
PARAVOOR
Please refer Tender documents.
10 documents required · 10 mandatory
₹845
Yes
₹9,531
Yes
5 Nov 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
13 Oct 2025
6 Oct 2025
6 Oct 2025 - 13 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1342095.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .