| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹5.2 L+₹5,694.71 (1.11%)Rejected-Finance | L2 | Rejected-Finance second lowest |
Tender Value
Refer Docs
EMD Value
₹14,725
Closing Date
2 Jan 2024, 6:00 pmClosed
Assistant Engineer
Office of the Assistant Executive Engineer, LIDEW Subdivision , Kondotty
Annual Plan-Kondotty Block -2023-2024 . Vellarathodu Naveekaranam in Pallikkal GP-P no.164
2023_LSGD_635924_8
05/2023/AE/LID EW/KTY
Open Tender
Civil Works - Others
Item Rate
180 days
kondotty block panchayath
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,300
₹14,725
3 Jul 2024
26 Dec 2023
4 Jan 2024
26 Dec 2023
2 Jan 2024
26 Dec 2023
26 Dec 2023 - 2 Jan 2024
Amount
Side Protection works
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD299223/2023-2024:Providing and fixing Granite of any colour and shade for Name board, of required size laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all, levels, including lettering & fixing
ABDUL NAZEER V.P.
Bidder Name
ABDUL NAZEER V.P.
MOHAMMED FAVAZ
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_966075.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .