Loading…
Loading…
| Sl No | Description | Qty | Unit | BIJU.V.S L2 | laldinga L1 |
|---|---|---|---|---|---|
| 1.00Construction of bus waiting shed | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 5.85 | cum | 367 ₹2,146.95 | 360 ₹2,106 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.15 | cum | 8,109 ₹25,559.57 | 7,946 ₹25,045.79 Lowest |
| 1.00 | OD310984/2025-2026:Providing and laying in position cement concrete 1:3:6 using graded metal 60% 40mm and 40% 20mm broken stone excluding the cost of centering and shuttering but including all charges for cost and conveyances, watering, curing etc.complete- All work up to plinth level. | 5.26 | cum | 8,634 ₹45,432.11 | 8,461 ₹44,521.78 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 11.14 | sqm | 394 ₹4,389.16 | 386 ₹4,300.04 Lowest |
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 461.31 | kg | 236 ₹1,08,868.92 | 231 ₹1,06,562.38 Lowest |
| 1.01 | OD312601/2025-2026:Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium
Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the
building , for all heights and all levels etc. including: a) Structural analysis & design and
preparation of shop drawings for pressure equalisation or rain screen principle as required,
proper drainage of water to make it watertight including checking of all the structural and
functional design. b) Providing, fabricating and supplying and fixing panels of aluminium
composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm
thick aluminium composite panel material consisting of 3mm thick FR grade mineral core
sandwiched between two Alumini um sheets (each0.5mm thick). The aluminium composite
panel cladding sheet shall be coil coated, with Kynar 500based PVDF / Lumiflon based
fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service)
coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather
silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5 / MS
with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load
movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon
separators to prevent bi-metallic contacts all complete required to perform as per specification
and drawing The item includes cost of all material & labour component, the cost of all mock
ups at site, cost of all samples of the individual components for testing in an approved
laboratory, field tests on the assembled working curtain wall with aluminium composite panel
cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding
till the handing over of the building for occupation. Base frame work for ACP cladding is
payable under the relevant aluminium item.s The Contractor shall provide curtain wall with
aluminium composite panel cladding, having all the performance characteristics all complete ,
as per the Architectural drawings, as per item description, as specified, as per the approved shop
drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment,
only the actual area on the external face of the curtain wall with Aluminum Composite Panel
Cladding (including width of groove) shall be measured in sqm. up to two decimal places. | 51.44 | sqm | 5,735 ₹2,95,019.87 | 5,620 ₹2,89,104.04 Lowest |
| 1.01 | 50.12.2.5:Providing & fixing Poly carbonate multi wall plain sheet 8 mm thick as approved by the Engineer in charge and should be supplied in a single length of 12 M or as decide by the Engineer in charge. The sheets shall be fixed using self drilling/ self tapping screw of size ( 5.5x55mm) with EPDM seal complete upto any pitch in horizontal /vertical / curved surface, but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. | 4.88 | sqm | 953 ₹4,650.64 | 933 ₹4,553.04 Lowest |
| 1.01 | 11.37:Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete | 24.44 | sqm | 1,199 ₹29,303.56 | 1,175 ₹28,717 Lowest |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 59.77 | sqm | 168 ₹10,041.19 | 164 ₹9,802.12 Lowest |
Tender Value
₹8.4 L
EMD Value
₹21,045
Closing Date
18 Feb 2026, 12:30 pmClosed
ASSISTANT EXECUTIVE ENGINEER
OFFICE OF ASSISTANT EXECUTIVE ENGINEER, VARKALA MUNICIPALITY
MLA-SDF-2025-2026 Sri Adv V JOY MLA Proposal of Construction of bus waiting station in front of Model HSS at varkala
2026_LSGD_835039_1
ET1/AEE/LIDEW/VKLA/25-26
Open Tender
Civil Works - Others
Item Rate
180 days
VARKALA
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,860
Yes
₹21,045
Yes
30 Jul 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of bus waiting shed | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | OD310984/2025-2026:Providing and laying in position cement concrete 1:3:6 using graded metal 60% 40mm and 40% 20mm broken stone excluding the cost of centering and shuttering but including all charges for cost and conveyances, watering, curing etc.complete- All work up to plinth level. | 1 | cum | - | - |
| 1.004 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.005 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.6 | kg | - | - |
| 1.006 | OD312601/2025-2026:Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium
Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the
building , for all heights and all levels etc. including: a) Structural analysis & design and
preparation of shop drawings for pressure equalisation or rain screen principle as required,
proper drainage of water to make it watertight including checking of all the structural and
functional design. b) Providing, fabricating and supplying and fixing panels of aluminium
composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm
thick aluminium composite panel material consisting of 3mm thick FR grade mineral core
sandwiched between two Alumini um sheets (each0.5mm thick). The aluminium composite
panel cladding sheet shall be coil coated, with Kynar 500based PVDF / Lumiflon based
fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service)
coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather
silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5 / MS
with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load
movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon
separators to prevent bi-metallic contacts all complete required to perform as per specification
and drawing The item includes cost of all material & labour component, the cost of all mock
ups at site, cost of all samples of the individual components for testing in an approved
laboratory, field tests on the assembled working curtain wall with aluminium composite panel
cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding
till the handing over of the building for occupation. Base frame work for ACP cladding is
payable under the relevant aluminium item.s The Contractor shall provide curtain wall with
aluminium composite panel cladding, having all the performance characteristics all complete ,
as per the Architectural drawings, as per item description, as specified, as per the approved shop
drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment,
only the actual area on the external face of the curtain wall with Aluminum Composite Panel
Cladding (including width of groove) shall be measured in sqm. up to two decimal places. | - | sqm | - | - |
| 1.007 | 50.12.2.5:Providing & fixing Poly carbonate multi wall plain sheet 8 mm thick as approved by the Engineer in charge and should be supplied in a single length of 12 M or as decide by the Engineer in charge. The sheets shall be fixed using self drilling/ self tapping screw of size ( 5.5x55mm) with EPDM seal complete upto any pitch in horizontal /vertical / curved surface, but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. | 1 | sqm | - | - |
| 1.008 | 11.37:Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete | - | sqm | - | - |
| 1.009 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 1 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.18 MB
Tendernotice_3.pdf
PDF • 0.23 MB
BOQ_1404847.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 0.95 MB
PRE.pdf
Tender Documents • 0.19 MB
FOT.pdf
Tender Documents • 0.19 MB
AFF.pdf
Tender Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .