Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.3 L+₹1.2 L (9.57%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R SURESHKUMAR L2 | SHIBU JOSE G L1 |
|---|---|---|---|---|---|
| 1.00Maintance | |||||
| 1.00 | OD192739/2025-2026:Supplying and providing MS dowel bars of size 16 mm dia of 1m long (0.50m in rock and 0.50m in concrete ) including drilling holes of 20mm dia to a depth of 0.50m in rock and filling the gap with cement grout (0.10kg/each) etc complete. | 21 | each | 326.19 ₹6,849.99 | 297.7 ₹6,251.7 Lowest |
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 4.2 | cum | 630.13 ₹2,646.55 | 575.1 ₹2,415.42 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.6 | sqm | 370.66 ₹2,075.7 | 338.29 ₹1,894.42 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.8 | cum | 10,067.83 ₹28,189.92 | 9,188.63 ₹25,728.16 Lowest |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 22.4 | sqm | 805.91 ₹18,052.38 | 735.53 ₹16,475.87 Lowest |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.36 | cum | 9,564.04 ₹32,135.17 | 8,728.84 ₹29,328.9 Lowest |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.5 | cum | 7,614.52 ₹34,265.34 | 6,949.57 ₹31,273.07 Lowest |
| 1.01 | 5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric | 487.2 | kilogram | 113.29 ₹55,194.89 | 103.4 ₹50,376.48 Lowest |
| 1.01 | 11.20.4:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Ordinary cement without any pigment | 37.95 | sqm | 1,117.64 ₹42,414.44 | 1,020.04 ₹38,710.52 Lowest |
Tender Value
₹15.2 L
EMD Value
₹38,112
Closing Date
12 Sept 2025, 5:00 pmClosed
Assistant Executive Engineer
Office of Assistant Executive Engineer Nemomzonal Thiruvananthapuram corporation
Pro No 644/26 Harbour ward construction of park completion balance work
2025_LSGD_793918_1
01/AEE5/LID AND EW TMC 2025-26(5)
Open Tender
Civil Works - Others
Item Rate
180 days
Nemom zonal
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹38,112
Yes
24 Oct 2025
3 Sept 2025
15 Sept 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1311517.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .