| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹1.6 Cr+₹4.9 L (3.16%)Rejected-AOC | ₹1.6 Cr+₹4.9 L (3.16%) | L2 | Rejected-AOC 2nd lowest |
| 3 | L3₹1.6 Cr+₹5.4 L (3.50%)Rejected-AOC | ₹1.6 Cr+₹5.4 L (3.50%) | L3 | Rejected-AOC 3rd lowest |
| 4 | L4₹1.6 Cr+₹9.8 L (6.40%)Rejected-AOC | ₹1.6 Cr+₹9.8 L (6.40%) | L4 | Rejected-AOC 4th lowest |
| 5 | L5₹1.7 Cr+₹14.3 L (9.34%)Rejected-AOC | ₹1.7 Cr+₹14.3 L (9.34%) | L5 | Rejected-AOC 5th lowest |
Tender Value
₹1.8 Cr
EMD Value
₹50,000
Closing Date
7 Oct 2021, 11:00 amClosed
Superintending Engineer, PWD Roads South Circle, T
Office of the Superintending Engineer Roads South Circle, TVPM
GENERAL Construction of bund road from Madhupalam to Punchakkari bridge with retaining wall in Nemom LAC Work General Civil work
2021_PWD_442494_1
TR/RD/2019/475/1
Open Tender
Civil Works - Roads
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
13 Dec 2021
30 Sept 2021
11 Oct 2021
30 Sept 2021
7 Oct 2021
30 Sept 2021
Amount
Overlay
55.1.a:Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. By Manual Means.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means
Side protection work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.8:Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce.Complete as per drawing and Technical Specifications
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Base and subbase
3.18:Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
4.2.A.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-IV - For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
Ashoka Kumar.T
J SHAJI
ARUNLAL S
ANISHZACHARIAH
Rajesh J
Shaji sivanandan
SANTHOSH SIVANANDAN
Bidder Name
Mon Joseph
Rajesh J
J SHAJI
Shaji sivanandan
Ashoka Kumar.T
SANTHOSH SIVANANDAN
ANISHZACHARIAH
ARUNLAL S
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .