30 Jul 2021, 6:00 pmClosed
Executive Engineer REW Division Rajouri
OFFICE OF THE EXECUTIVE ENGINEER REW DIVISION RAJOURI
Constt of Water Tank at Maqbool W.No 04 Pyt. Dabrote Block Manjakote Under B2V3
2021_RDPR_131177_2
e-NIT No. 31 REW RAJOURI OF 2021 Dated 19-07-2021
Open Tender
Civil Works
Item Rate
30 days
Manjakote
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
CD Account No 0020010200000890
Exempted
18 Aug 2021
19 Jul 2021
31 Jul 2021
19 Jul 2021
30 Jul 2021
19 Jul 2021
Amount
Earth work in excavation by manual meansin trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in AKS
Providing and laying of Cement Concrete IN (1:5:10 mix) using 40 mm agg.
Providing and laying in position cement conc. Of specified grade excluding the cost of centering and shuttering all work up to plinth level (1:3:6) (1: cement:3 coarse sand:6 graded stone agg. 20 mm nominal size) Including all lead lift and carriages including loading, unloading stacking at site complete Job.
Supply and pacing of stones in Plumb Conc.
Brickwork with bricks of class designation 75 above plinth level up to floor level in cement mortar (1:6)mix.Including all lead lift and carriages including loading, unloading stacking at site complete Job.
Reinforcement for RCC works including cutting, bending, binding and placing etc all complete.
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15', landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curring but excluding the cost of centring, shuttring, finishing and reinforcement with 1:11/2:3 (1 cement:11/2coarse sand:3 graded stone aggregate 20mm nominl size) Including all lead lift and carriages including loading, unloading stacking at site complete Job.
Centering and Shuttering of Ordinary Timber
Mohd Iqbal
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .