Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC KUMARAKOM VAIKOM | L1 | Accepted-AOC L1 Accepted |
| Sl No | Description | Qty | Unit | VISHNU L1 |
|---|---|---|---|---|
| 1.00Appendix-A-Construction of Three Walled Culvert | ||||
| 1.00 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 37 | cum | 54.5 ₹2,016.5 Lowest |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 7.5 | cum | 9,001.3 ₹67,509.75 Lowest |
| 1.00 | 11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203V. R.C.C. grade M 25 | 47 | cum | 10,367.1 ₹4,87,253.7 Lowest |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 4.44 | tonne | 1,00,437.12 ₹4,45,539.06 Lowest |
| 2.00Appendix B-DR masonry and Coconut Piling | ||||
| 2.00 | OD5123/2024-2025:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down through various strata bellow bed level including cost conveyance labour charges etc. complete.(Based on 60.64.1) | 360 | metre | 143.13 ₹51,526.8 Lowest |
| 2.00 | OD5122/2024-2025:Coconut Pile - Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long numbers per day 6x15=90m. (Approved od for the work "NABARD- RIDF -XXVI-Expansion and refurbishment of Neendakara Fishing Harbour-Construction of Generator room , Shell and condensor room and panel room at Sakthikulangara side") | 360 | metre | 245.65 ₹88,434 Lowest |
| 2.00 | OD5121/2024-2025:Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m(Based on 60.64.6) | 120 | each | 228 ₹27,360 Lowest |
| 2.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 22 | cum | 2,967 ₹65,274 Lowest |
Tender Value
₹12.6 L
EMD Value
₹31,601
Closing Date
8 Sept 2025, 6:00 pmClosed
Assistant Executive Engineer
O/o Office of the Assistant Executive Engineer,NEENDAKARA
LAC-ADS-Upgradation of Coastal Road- Upgradation of Telephone Exchange Coastal Road in Alappadu Panchayathu Ward no. 5 in karunagappally municipality in Karunagappally LAC-Balance Works-General Civil Work
2025_HED_791156_1
HED/CEHED/TR/890/2024_5_1_1/3
Open Tender
Civil Works - Roads
Item Rate
90 days
Alappadu Panchayathu Ward no. 5
Please Refer Tender Documents
8 documents required · 8 mandatory
₹2,760
₹31,601
Yes
7 Nov 2025
26 Aug 2025
10 Sept 2025
26 Aug 2025
8 Sept 2025
26 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1304333.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .