Loading…
Loading…
Tender Value
₹8.4 L
EMD Value
₹16,710
Closing Date
6 Oct 2026, 11:00 am6d left
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Jablyana 1st 2nd 3rd phase Tehsil Ghumarwin District Bilaspur (SH Operation of pumping machinery and distribution system of water supply for main storage tank to different habitation for one year).
2026_HPIPH_144377_4
BLP-BLP-0736-NIT No. 10884-11883 Dated 25/09/2026
Open Tender
Civil Works
Item Rate
365 days
Sub Division Kandrour Section Harlog
Please refer Tender documents.
4 documents required · 4 mandatory
₹350
₹16,710
28 Sept 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Jablyana 1st, 2nd, 3rd phase whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 108 | ₹108 |
| 2Description of main components of the scheme is as under:- | |||||
| 2.01 | Civil works: 4 Nos pump house,
Rising main: Booster stage 1st phase 80mm dia =220 Rmt, 1st phase 100mmdia 1110 Rmt, 2nd phase 40mm dia 890Rmt, Booster stage 80mm dia =25 Rmt,1srt stage 80mm dia 1785 Rmt, 3rd phase Booster stage 80mm dia=90Rmt, 1st stage 80mm dia =1530Rmt.
Pumping machinery:Booster stage 1st phase submerisbhle pump 2x7.50=15 HP, 1st phase 2x30=60 HP, 2nd phase submersible pump 2x3=6 HP, 2nd phase 2x30=60 HP, Booster stage 3rd phase submersible pump 2x5=10 HP, 3rd phase 2x50=100 HP.
Distribution system: 285 Km
No of storage tanks: 4 Nos main storage tank & 10 Nos sub storage tank, Total working hours: 30 through , 5 Nos perons. (pump operator=2Nos, Beldar/ Hepler=3Nos)
Indicators to be mentioned:Average per day 9 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No.
Quantity of water lifted per day: (180000 Litr).
Pumping hours per day (12) and energy consumptoin per day 830 Unit. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
PWD8.pdf
Tender Documents • 1.31 MB
TC.pdf
Tender Documents • 0.18 MB
BOQ_214702.xls
BOQ • 0.23 MB
PWD6.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .