Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.9 L
EMD Value
₹13,877
Closing Date
27 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE OFFICER JAGATSINGHPUR MUNICIPALITY
Office of the Jagatsinghpur Municipality
Construction of CRC near AWC and Construction of Community Centre near Sahadassundari at Mukundapur In Ward No 19
2026_ORULB_142591_26
EO/ JSPURM/ W_04/ 2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Construction of CRC near AWC and Construction of C
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹13,877
Yes
12 Oct 2026
12 Oct 2026
29 Oct 2026
12 Oct 2026
27 Oct 2026
12 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling and removing RCC slabincluding stacking the useful materials for reuse and removing the debries within 50m lead as per direction of E.I.C. | 4.67 | cum | 1,731.8 | ₹8,087.51 |
| 2 | Dismantling & removing Stone/brick masonary including stacking the useful materials for reuse and removing the debries within 50m lead etc complete. | 14.7 | cum | 1,646.62 | ₹24,205.31 |
| 3 | Earth work in excavation of foundation in all kinds of soil within initial lead and lift including rough dressing braking clods and levelling the bed including lifting the earth by mechanical means etc. Complete as per the direction of EIC. | 18.68 | cum | 306.01 | ₹5,716.27 |
| 4 | Sand Filling in Foundation &Plinth inclouding cost conveyanceroyalty & taxes and all labour T & P etc. complete., | 27.64 | cum | 568.2 | ₹15,705.05 |
| 5 | C.C.( 1:4:8) using 4Cm size H.G. Crusher metal including cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 4.87 | cum | 6,468.98 | ₹31,503.93 |
| 6 | R.C.C.M 20 using 12 mm size H.G. chips including centering,shuttering, cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 18.53 | cum | 6,961.85 | ₹1,29,003.08 |
| 7 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete.Column foundation & Plinth- | 50.03 | sqm | 249.73 | ₹12,493.99 |
| 8 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete.Column & Beam- | 51.43 | sqm | 1,219.7 | ₹62,729.17 |
| 9 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. -Lintel- | 7.83 | sqm | 577.75 | ₹4,523.78 |
| 10 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. --Roof slab- | 59 | sqm | 769.2 | ₹45,382.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
BOQ_613207.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .