Executive Engineer RandB Division Bandipora
Office of the Xen RandB Division Bandipora
Completion of Partially constructed Office at Workshop/Store at Ajar
2026_PWDJK_313727_1
e NIT No 32 of 2026-27 Dated 25-06-2026
Open Tender
Civil Works
90 days
Bandipora
As per NIT
2 documents required · 2 mandatory
₹800
Executive Engineer RandB Division Bandipora
₹35,840
Bandipora near DC Office
25 Jun 2026
25 Jun 2026
10 Jul 2026
26 Jun 2026
9 Jul 2026
26 Jun 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 139.4 | Sqm | 12.49 | ₹1,741.11 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1 Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) incld. carriage of material from source to site of work complete | 3.01 | Cum | 5,742.4 | ₹17,284.62 |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incld. carriage of material from source to site of work complete | 13.32 | Cum | 10,337.2 | ₹1,37,691.5 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roofs, landings, balconies and access platforms. incld. carriage of material from source to site of work complete | 48.47 | Sqm | 718.2 | ₹34,811.15 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams,plinth beams, girders, bressumers and cantilevers incld. carriage of material from source to site of work complete | 4.75 | Sqm | 577.55 | ₹2,743.36 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls incld. carriage of material from source to site of work complete | 37.3 | Rm | 262.2 | ₹9,780.06 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete at all levels, Thermo-Mechanically Treated bars of grade Fe-500D or more, incld. carriage of material from source to site of work complete | 1,199.35 | Kg | 123.2 | ₹1,47,759.92 |
| 8 | Supplying and filling in plinth with Boulder/GSB/ Sand under floors including, watering, ramming, consolidating and dressing complete, incld. carriage of material from source to site of work complete | 35.55 | Cum | 1,000 | ₹35,550 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in superstructure above plinth level upto floor five level including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand )incld. carriage of material from source to site of work complete | 24.04 | Cum | 10,306.25 | ₹2,47,762.25 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level in 1:3:6 (1 cement : 3 coarse sand : 6 stone aggregate 40mm nominal size) including curing completeincld. carriage of material from source to site of work complete | 4.1 | Cum | 6,212.9 | ₹25,472.89 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_1015504.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid