Loading…
Loading…
Tender Value
₹8.4 L
EMD Value
₹8,350.26
Closing Date
5 Sept 2026, 6:00 pmClosed
Executive Engineer, R&B Panchayat Division, Nadiad
Construction of Room in Shamshan Gruh at Village Talpoda, Ta:Kapadvanj, Dist:Kheda
339610
09/2026-27
Open
Civil Works - Buildings
Works
Nadiad
6 documents required · 6 mandatory
₹900
Executive Engineer, Panchayat (R and B) Division, NADIAD
₹8,350.26
27 Aug 2026
27 Aug 2026
27 Aug 2026
5 Sept 2026
27 Aug 2026
Name of Work :- Construction of Room in Shamshan Grah at Village Talpoda, Ta:Kapadvanj, Dist:Kheda
BILL OF QUANTITIES
Item Description Quantities Unit Amount
No. In Figure In Words
Excavation for foundation upto 1.5 m depth including sorting out and stacking of Rupees One
useful materials and disposing off the excavated stuff as directed upto 50 Meter Hundred Seventeen
lead (A) Loose or soft soil and Paise Seven
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out Rupees One
and stacking of useful materials and disposing off the excavated stuff upto 50 Hundred Sixty Two
Meter lead.(B) Dense or Hard soil and Paise Thirty
Providing and laying cement concrete 1:3:6 (1‐ Cement : 3‐ coarse sand : 6‐ Rupees Three
Machine Crushed stone aggregates 40 mm nominal size) and curing complete Thousand Five and
excluding cost of formwork in (A) Foundation and Plinth. For PCC Paise Seventy Six
Brick work using common burnt clay building bricks having crushing strength Rupees Four
not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1‐ Thousand Twenty
Cement : 6 ‐fine sand)(B) Conventional One and Paise Two
Filling available excavated earth (excluding rock) in trenches. plinth, sides of Rupees One
foundations etc. in layers not exceeding 20 cm. in depth consolidating each Hundred Thirty and
disposited layer by ramming and watering. Paise Thirty Nine
Filling in foundation and plinth with murrum or selected soil in layers of 20cm.
thickness including watering, ramming and consolidating etc. complete.
6 16.60 Cum 282.02 Hundred Eighty Two
and Paise Two Only
Providing and laying ordinary cement concrete M200 and curing complete
including the cost of formwork but excluding the cost of reinforcement for RCC
7 work. (a) Foundation, Footing base of column mass concrete. For Footing 10.60 Cum 7376.04
Hundred Seventy Six
and Paise Four Only
Providing and laying ordinary cement concrete 1:1.5:3 (1 cement : 1.5 coarse Rupees Seven
sand : 3 graded stone aggregates 20 m.m. nominal size) and finishing smooth Thousand Two
8 with curing etc. complete including the cost of form work but excluding the 5.10 Cum 7211.94 Hundred Eleven and
cost of reinforcement for R.C.C. work in :Plinth Beam(i) Having cross sectional Paise Ninety Four
area .08 to 0.12 sqm. Only
Brick work using common burnt clay building bricks having crushing strength Rupees Four
not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1‐ Thousand Two
9 Cement : 6 ‐fine sand)(B) Conventional For GF 2.90 Cum 4289.21 Hundred Eighty
Twenty One Only
Providing and laying ordinary cement concrete M200 and curing etc. complete Rupees Eight
including the cost of form work but excluding the cost of reinforcement for RCC Thousand Five
10 work (C) Column For GF 6.90 Cum 8548.97 Hundred Forty Eight
and Paise Ninety
Providing and laying ordinary cement concrete M200 and curing etc. complete Rupees Six
including the cost of form work but excluding the cost of reinforcement for RCC Thousand Eight
11 work (B) Beam For GF 5.90 Cum 6801.76 Hundred One and
Paise Seventy Six
Providing & laying ordinary C.C. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded Rupees Six
stone aggregate of 20 mm nominal size) and finishing smoothe with curing Thousand Seven
12 etc. Complete including cost of form work but excluding cost of 6.90 Cum 6740.58 Hundred Forty and
reinforcement. for R.C.C. work in (A) SLAB having C.S. than 10 cm and upto 13 Paise Fifty Eight
cm thcikness. For GF Only
Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, Rupees Seventy Six
13 binding and placing in position complete upto floor two level 4492.00 Kg 76.21 and Paise Twenty
Providing 20mm thick sand faced cement plaster on walls upto height 10 metres Rupees Three
above ground level consisting of 12mm thick backing coat of C.M. 1:3 (1‐cement : Hundred Thirty Five
3‐sand) and 8mm thick finishing coat of C.M. 1:1 (1‐cement : 1‐sand) including and Paise Sixty Five
scaffolding curing etc. complete. Only
Name of Work :- Construction of Room in Shamshan Grah at Village Talpoda, Ta:Kapadvanj, Dist:Kheda
BILL OF QUANTITIES
Item Description Quantities Unit Amount
No. In Figure In Words
Providing 20 mm thick double coat smooth cement plaster on interior Brick
Work / concrete work for plastering comprising of base coat of 12 mm thick Rupees Two
cement plaster in cement mortar (1 Cement : 4 coarse sand) in rough finishing Hundred Seventy
and 8 mm thick top coat of cement mortar 1:2 (1 Cement : 2 Coarse sand) and Paise Forty Two
finished with trovel including scaffolding curing etc. complete. Only
Finishing wall with weather proof exterior emulsion paint on wall surface (two
coats) to give an required shape even shade after thoroughly brushing the
16 89.60 Sqm 155.05 Hundred Fifty Five
surface to remove all dirt, and remains of loose powdered materials.etc
and Paise Five Only
Applying two coats of acrylic laphy (putty) & two coats of primer of approved
brand and manufacture on new wall surface to give an even shade including
Rupees Forty and
17 thoroughly brushing the surface free from mortar dropping and other foreign 41.10 Sqm 40.59
Paise Fifty Nine Only
matter and sand papered smooth as per instruction of Engineer in charge &
Wall painting (two coats) with plastic emulsion paint of approved brand and
manufacture on undecorated wall surface to give an even shade including
Hundred Nineteen
18 throughly brushing the surface free from mortar droppings and other foreign 41.10 Sqm 119.42
and Paise Forty Two
matter and sand papered smooth.smooth.
Providing, laying and jointing in true line and level 110 diametre U.P.V.C (Type
B) conforming to IS 13592‐1992 with one end plain and other end socketed with
rubber ring, & fittings conforming to ISI 14735‐ 1999 of approved make for
drainage systempipe line, pipe shall be jointed with each other with rubber Rupees Eight
lubricant, pipe shall be fixed on wall using of PVC clamp of thesize 110 mm Hundred Thirty Five
diametre x 149 mm length x145 mm heigh at every 2000 mm center tocenter or and Paise Fourteen
shall be concealed in walls asdirected including necessary fittings such as bends, Only
shoes etc. including testing of pipesand joints and jointed with adhesive solvent
cement including cost of all materials.
Providing and fixing Cast Iron Cremation Pyre of required pattern to wooden
frames of windows etc. with M.S. flats at required spacings and frame alround, Rupees One
square or round bars with round headed bolts and nuts or by screws. Hundred One Only
Rupees Eight Lakhs Thirty Five Thousand Twenty Five and Paise Seventy Two Only
I/We am/are willing to carry out the work at…..% above/below percent(Should be written in figures and words) of the estimated rate mentioned
above. Amount of my /our tender works out as under.
(A) Estimated amount put to tender Estimated amount put to tender
(B) Deduct………% below Add………% below
(Rs. in Words __________________Only). (Rs. in Words __________________Only).
(* Please strike out whichever is not applicable).
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer‐In‐Charge for which no extra
payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC‐10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Dated Signature of Deputy Executive Engineer Executive Engineer
the Contractor. Panchayat (R&B) Sub Division Panchayat (R&B) Division
Kapadvanj Kheda
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
05 BUILDING SPECIFICATION BOOKLET.pdf
All GR.pdf
BOQ.pdf
Civil Specification.pdf
SBD.pdf
Specification Index.pdf
Test Schedule.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .