Tender Value
₹12.5 L
EMD Value
₹31,263
Closing Date
14 Jun 2023, 1:30 pmClosed
Chief Executive Officer
SMART CITY THIRUVANANTHAPURAM LIMITED 4th Floor Felicity Square Opp AGs Office MG Road Near Statue Thiruvananthapuram 695001
Selection of Contractor for Development of Smart Roads for Road works and Water supply lines in ABD area Under Smart City Mission Corporation Roads in Thiruvananthapuram Deekshitar Street Road ID 56
2023_SCTLT_577183_2
SCTL/PRJ/210/2019/M(PMM)/RFP- 015
Open Tender
Civil Works - Roads
Item Rate
180 days
Thiruvananthapuram
Please refer tender Document
2 documents required · 2 mandatory
₹3,252
₹31,263
16 Sept 2023
7 Jun 2023
15 Jun 2023
7 Jun 2023
14 Jun 2023
7 Jun 2023
Amount
STORM WATER DRAIN (MORTH)
Drain cleaning using scavengers for existing drain including removal of all deposited silt and conveying the removed earth to dumping site.(In CuM)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
STORM WATER DRAIN (DSR)
Taking out of existing drain slab and stacking within 1000m lead including all labour charges and miscellaneous expenses etc complete
Providing and fixing PVC pipes includes jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 25 mm dia 10KGF/cm2
ROAD & JUNCTION IMPROVEMENT (DSR)
Dismantling of exisitng interlocking tiles including stacking of materials within 50 metres
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub base cum drainage layer - Mix in Place Method
Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge.
Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.)
Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately.
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer. 10.26.3 G.I. pipes
Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
Operation and Maintenance Cost
Maintenance charges of road work and other components except landscaping per month for fourth year
Maintenance charges of road work and other components except landscaping per month for fifth year
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .