Loading…
Loading…
Tender Value
₹18.4 L
EMD Value
₹36,841
Closing Date
14 Jul 2026, 3:00 pm6d left
Executive Engineer, Agartala Division No.I
Executive Engineer, Agartala Division No.I
Renovation of different rooms of TPSC, Agartala during the year 2026-27
2026_CEPWD_74506_1
13/EE-I/2026-27
Open Tender
Civil Works - Building
120 days
AGARTALA
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
₹36,841
7 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or pointing, raking out joints, cleaning and preparing the surface for replastering or re-pointing including disposal of rubbish to the dumping ground with all leads and lifts etc.complete as per direction of the Engineer- incharge. | 60 | Sqm | 30.1 | ₹1,806 |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
i) For thickness of tiles 10 mm to 25 mm | - | sqm | 41.5 | - |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | Cum | 1,177.3 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
i) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size) | - | Cum | 9,295.7 | - |
| 5 | Centering shuttering including struttings, propping etc. and removal of form work for:
i) ii) Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 2.25 | Sqm | 391 | ₹879.75 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-
i) RCC work in beams, lintels, bands, plain window sills, staircases and spiral staircases excluding precast spiral staircase.
a) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | Cum | 12,591.1 | - |
| 7 | Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete above plinth level.
i) Thermo-Mechanically Treated bars of grade Fe-500D or
more | 28.12 | Kg | 103.9 | ₹2,921.67 |
| 8 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | Cum | 11,410.19 | - |
| 9 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-
i)In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 45 | Sqm | 1,533.5 | ₹69,007.5 |
| 10 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge.
i) 50mm average thickness | 20 | sqm | 184.4 | ₹3,688 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
SBD_EE_13.pdf
Tender Documents • 3.27 MB
BOQ_75837.xls
BOQ • 2.41 MB
Download all tender documents and submit your bid