Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 CrAdmitted-Finance | ₹12.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹12.8 CrAdmitted-Finance | ₹12.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹14 CrAdmitted-Finance LANE NO 3 UMERABAD NEAR CITY HOSPITAL BATHINDI JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | ₹14 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified, Not meeting similar work criteria. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified, Not meeting similar work criteria. |
| Sl No | Description | Qty | Unit | SGF INFRA PVT LTD L1 | ASHOK KUMAR L2 | M/S MAHIR CONSTRUCTION COMPANY L3 |
|---|---|---|---|---|---|---|
| 1.01 | Design And Construction Including Proof Checking From IIT/NIT For 80 Mtr Single Span Pmt Steel Girder Bridge (Through Type) Gulabgarh Bridge With Rcc Decking On Foundation At Km 32.70 On Road Galhar Sansari Under 118 RCC/35 BRTF/Project Sampark In J&K (UT)” with span arrangement as per NIT drawing using open foundation, special condition, particular specifications of the tender documents including load testing of super structure as specified, all preparatory works, dirt wall, return walls, wing walls, including placing of POT & POT cum PTFE bearings, design, launching/erection of staging works as required, Decking, Wearing coat having nonskid surface, strip seal expansion joints, hand railings, kerbs, RCC crash barrier Guard posts, footpath, approach slab, drainage spouts, drainage, arrangement over carriage way and footpath , service arrangement for utilities , painting with non-corrosive paint to all exposed steel works, kerbs, protective works , temporary river training works , diversions and all other items of works required and necessary for complete construction of bridge including curing and proof checking of design and drawings from IIT as directed by the Deptt. | 80 | Mtr | 14,95,000 ₹12.0 Cr | 16,00,000 ₹12.8 Cr | 17,50,000 ₹14 Cr |
Tender Value
₹8.8 Cr
EMD Value
₹7.6 L
Closing Date
6 Nov 2025, 6:00 pmClosed
Chief Engineer Project Sampark
HQ CE Project Sampark Kunjwani Chowk Jammu 180010
DESIGN AND CONSTRUCTION INCLUDING PROOF CHECKING FROM IIT NIT FOR 80 MTR SINGLE SPAN PMT STEEL GIRDER BRIDGE THROUGH TYPE GULABGARH BRIDGE WITH RCC DECKING ON FOUNDATION AT KM 32.70 ON ROAD GALHAR SANSARI UNDER 118 RCC 35 BRTF PROJECT SAMPARK IN JK
2025_BRO_733664_1
CE (P) SPK/16/2025-26
Open Tender
Civil Works
730 days
AT KM 32.70 ON ROAD GALHAR SANSARI
As per Tender Documents
9 documents required · 9 mandatory
₹0
₹7.6 L
Yes
HQ CE Project Sampark Jammu
17 Feb 2026
3 Oct 2025
8 Nov 2025
3 Oct 2025
6 Nov 2025
16 Oct 2025
4 Oct 2025 - 14 Oct 2025
15 Oct 2025
stage.html
html • 0.04 MB
technical_821470.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
TenderGulabgarh.pdf
Tender Documents • 1.85 MB
BOQ_821470.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid