Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹2.3 L+₹1,862 (0.80%)Rejected-Finance HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | L2 | Rejected-Finance L2 |
Tender Value
₹2.3 L
EMD Value
₹4,700
Closing Date
2 Mar 2026, 6:00 pmClosed
Executive Engineer
HP PWD Division
Construction of R Wall in wire crate
2026_PWD_129426_1
16991-93
Open Tender
Civil Works - Roads
Percentage
60 days
Sarkaghat
Please refer Tender documents.
10 documents required · 10 mandatory
₹350
₹4,700
5 Oct 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in all kinds classification of soil in foundation of structures upto all depth/ height as per drawing and technical specification Clause 305.1 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead and lifts dressing of sides and bottom and back filling with approved material and disposal of all surplus excavated earth in specified site and as per direction of Engineer-in-charge complete. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 17.16 | Per cubic metre | 200 | ₹3,432 |
| 2 | Providing and laying of boulder apron laid in wire crates made with 4 mm(four millimetre ) dia GI wire conforming to IS:280 ( IS : Two hundrad eighty )and IS : 4826 ( IS : four thousand eight hundrad twenty six ) in 100mm x100mm (one hundrad millimetre into one hundrad millimetre ) mesh (weaved diagonally ) including 10% ( ten per cent ) extra for laps and joints laid with stone boulders weighting not less then 25 kg (Twenty five kilogramme ) including carriage of materials with in all leads and lifts complete in all respects as per the direction Engineer -in- charge. | 65.52 | Per cubic metre | 3,500 | ₹2,29,320 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
SBD.pdf
Tender Documents • 9.25 MB
BOQ_191368.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .