| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.7 LAccepted-AOC | ₹42.7 L | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹44.4 L+₹1.7 L (4.06%)Rejected-AOC | ₹44.4 L+₹1.7 L (4.06%) | L2 | Rejected-AOC 2nd lowest |
| 3 | L3₹45.7 L+₹3.0 L (7.11%)Rejected-AOC | ₹45.7 L+₹3.0 L (7.11%) | L3 | Rejected-AOC 3rd lowest |
| 4 | L4₹49.3 L+₹6.6 L (15.5%)Rejected-AOC | ₹49.3 L+₹6.6 L (15.5%) | L4 | Rejected-AOC 4th lowest |
| 5 | L5₹49.8 L+₹7.1 L (16.7%)Rejected-AOC | ₹49.8 L+₹7.1 L (16.7%) | L5 | Rejected-AOC 5th lowest |
| Sl No | Description | Qty | Unit | RAJAN VARGHESE L7 | V GOPI L6 | ABDUL NASAR. M L4 | KUNJAR CONSTRUCTIONS PRIVATE LIMITED L3 | np constructions L5 | T.T.MATHEW L2 | NAUFAL C.A L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Drainage | ||||||||||
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 260 | cum | 300 ₹78,000 | 245.42 ₹63,809.2 | 60 ₹15,600 Lowest | 76.92 ₹19,999.2 | 71.04 ₹18,470.4 | 62.76 ₹16,317.6 | 60.31 ₹15,680.6 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 62 | cum | 7,330 ₹4,54,460 | 6,144.27 ₹3,80,944.74 | 6,325 ₹3,92,150 | 6,108.61 ₹3,78,733.82 | 6,595.25 ₹4,08,905.5 | 5,825.81 ₹3,61,200.22 | 5,598.64 ₹3,47,115.68 Lowest |
| 1.00 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 26 | cum | 7,650 ₹1,98,900 | 8,151.45 ₹2,11,937.7 | 7,200 ₹1,87,200 | 7,041.47 ₹1,83,078.22 | 7,563.27 ₹1,96,645.02 | 6,748.69 ₹1,75,465.94 | 6,485.53 ₹1,68,623.78 Lowest |
| 1.00 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 132.88 | cum | 9,950 ₹13,22,156 | 8,239.1 ₹10,94,811.61 | 7,800 ₹10,36,464 | 7,626.56 ₹10,13,417.29 | 8,216.79 ₹10,91,847.06 | 7,331.48 ₹9,74,207.06 | 7,045.6 ₹9,36,219.33 Lowest |
| 1.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 8.01 | MT | 85,000 ₹6,80,680 | 90,279.5 ₹7,22,958.24 | 85,000 ₹6,80,680 | 79,375.1 ₹6,35,635.8 | 89,707.67 ₹7,18,379.02 | 80,042.2 ₹6,40,977.94 | 76,921.06 ₹6,15,983.85 Lowest |
| 2.00Road | ||||||||||
| 2.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 90 | cum | 345 ₹31,050 | 241.04 ₹21,693.6 | 60 ₹5,400 Lowest | 76.92 ₹6,922.8 | 71.04 ₹6,393.6 | 62.76 ₹5,648.4 | 60.31 ₹5,427.9 |
| 2.00 | 4.3.A:Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 3 percent slaked lime having minimum content of 70 percent of CaO, grading with a motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved subgrade Lime Stabilisation for Improving Sub-grade - By Mechanical Means | 123.75 | cum | 205 ₹25,368.75 Lowest | 364.5 ₹45,106.88 | 3,000 ₹3,71,250 | 373.14 ₹46,176.08 | 386 ₹47,767.5 | 344.42 ₹42,621.98 | 330.99 ₹40,960.01 |
| 2.00 | 4.1.A.3:Granular Sub-Base with Close Graded Material (Table:- 400-1) :- Plant Mix Method - Grading - III Material<br> Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 95 | cum | 2,250 ₹2,13,750 Lowest | 3,050 ₹2,89,750 | 3,000 ₹2,85,000 | 3,211.83 ₹3,05,123.85 | 3,455.42 ₹3,28,264.9 | 3,083.12 ₹2,92,896.4 | 2,962.9 ₹2,81,475.5 |
Tender Value
₹55.8 L
EMD Value
₹50,000
Closing Date
25 Sept 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer
GENERALConstruction of concrete road and drainage near KIIFB block at Govt Victoria college Palakkad
2025_PWD_798412_1
PWD/BLDG/TR/9445/2025
Open Tender
Civil Works - Buildings
Item Rate
270 days
Palakkad
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
25 Oct 2025
17 Sept 2025
29 Sept 2025
17 Sept 2025
25 Sept 2025
17 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1323176.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .