Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
10 Aug 2026, 9:30 pm
Hutti Gold Mines Company Limited
MANJUNATH KADLER
08537276339
Supply of two full sets of Sag Mill Discharge End Pulp lifters
HGML/2025-26/IND0438/CALL-3
HGML/2025-26/IND0438/CALL-3
Open
Two Tender Document System(Two Cover)
HGML Sr Manager Met Section Hutti
13 documents required · 11 mandatory · 2 optional
The bidder should have experience in supplying of Sag mill discharge end pulp lifters. Relevant documents to be enclosed. Purchase order copy of supply of Sag Mill Discharge End Pulp Lifters to be enclosed.
The manufacturers or authorized dealers/distributors are eligible. a. In case of Manufacturers they should submit their valid Manufacturing License. b. In case of authorized dealers/ distributors, they shall submit the Manufacturers Manufacturing License. Along with that, they should also furnish authorization letter from the manufacturer in the letterhead as per prescribed format mentioned in Annexure-II.
Past Performance Criteria: If the bidder is a manufacturer, they should have supplied Sag mill discharge end pulp lifters to the extent of at least 80% of one full set of SAG mill discharge end pulp lifters (60 Nos.), i.e., 48 Nos., during any one of the past three financial years (2022-23, 2023-24, or 2024-25). Note: For Micro and Small Enterprises (MSEs), the minimum supply requirement shall be 40% of one full set of SAG mill discharge end pulp lifters (60 Nos.), i.e., 24 Nos. b) Tenders submitted by authorized representatives/agents of eligible manufacturers may also be considered, provided the following conditions are met: The manufacturer must meet the eligibility criteria mentioned above in full and must furnish an authorization letter assuring full guarantee and warranty obligations for the goods supplied. c) The authorized representative/agent must have independently supplied at least 30% of one full set of SAG mill discharge end pulp lifters (60 Nos.), i.e., 18 Nos during any one of the past three financial years (2022-23, 2023-24, or 2024-25). Note: All tenderers must enclose relevant supporting documents, such as Purchase Order copies, as proof of compliance with the above criteria. Purchase order copies to be enclosed, as per the % mentioned in point a,b&c. HGML at its discretion may verify the veracity of the Purchase order enclosed along with the bid while taking decision.
Financial capability: 1) The average annual financial turnover of the tenderer should be not less than Rs.83 lakhs, during the last three proceeding financial years, namely : FY 2022-23 FY 2023-24 FY 2024-25. 2) In case of micro and small enterprises (MSEs), the required average annual financial turnover shall be 50% of Rs.83 lakhs, i.e Rs.41.5lakhs, during the last two proceeding financial years : FY 2023-24 FY 2024-25. The tenderer shall furnish the following as documentary proof for the financial capability criteria. 1. Annual Turnover Certificate for the relevant financial years, duly certified by a Chartered Accountant, OR 2. Audited Balance Sheet and Profit & loss statement for the relevant financial years, duly certified by a chartered accountant.
₹500
₹1.5 L
24 Jul 2026
24 Jul 2026
12 Aug 2026
31 Jul 2026
SAG MILL DISCHARGE END PULP LIFTERS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
technical bid - b.pdf
Technical Information / Worksheet • 0.34 MB
Item Description.docx
Others - Specification • 0.01 MB
Technical bid-A.pdf
Technical Information / Worksheet • 0.43 MB
Pulp Lifter drawing.pdf
Others - Drawings • 1.31 MB
NIT _Sag Mill pulp Lifters.pdf
Tender Document • 5.37 MB
technical bid d.pdf
Technical Information / Worksheet • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].