Loading…
Loading…
Tender Value
₹33.6 L
EMD Value
₹2.1 L
Closing Date
9 Apr 2026, 6:00 pmClosed
Executive Engineer Public Health Works Division GWSSB Lunawada
Producing potable water as desirable standards from Malekpur Main head works of Hindoliya Regional Water Supply Scheme by proper operation and maintenance of conventional water treatment plant at Malekpur MHW including all civil works, pipe system channels, all consumable, incl. Proper chlorination, skilled and unskilled manpower, material, T & P articles, vehicles, all type of valve chamber, and water meter for continuous running of filter plants round the clock, with uninterrupted pumping of treated water from Malekpur Main Head works to various Sub Headworks. Proper operation and maintenance of different class, type and diameter pipes, pump houses, Sumps, RCC ESR/Stand pipes, Sluice valves, Non return valve. At all these head works. Replacement spares all equipments and maintenance of civil structures etc. Including supply sufficient potable water to villages included in the scheme with residual chlorine of required PPM at bulk supply point including all type of brake down works for civil works. Providing sufficient No. of Supervision skilled and unskilled labours and providing security for all head works sites, pipeline etc for overall management of O&M work of whole scheme based on Mahi River for 70 villages and their habitation for 24 hours for 5 months periods. (Without Pumping Machinery)
291526
06 of year-2025-26 -IInd Attempt
Open
Civil Works - Water Works
Works
Mahisagar
3 documents required · 3 mandatory
₹6,000
Executive Enginer, Public Health Works Division, GWSSB, Lunawada, Mahisagar
₹2.1 L
1 Apr 2026
1 Apr 2026
1 Apr 2026
9 Apr 2026
1 Apr 2026
Name Of Work : Producing potable water as desirable standards from Malekpur Main head works of Hindoliya Regional Water Supply
Scheme by proper operation and maintenance of conventional water treatment plant at Malekpur MHW including all civil works, pipe
system channels, all consumable, incl. Proper chlorination, skilled and unskilled manpower, material, T & P articles, vehicles, all type of
valve chamber, and water meter for continuous running of filter plants round the clock, with uninterrupted pumping of treated water from
Malekpur Main Head works to various Sub Headworks. Proper operation and maintenance of different class, type and diameter pipes,
pump houses, Sumps, RCC ESR/Stand pipes, Sluice valves, Non return valve. At all these head works. Replacement spares all
equipments and maintenance of civil structures etc. Including supply sufficient potable water to villages included in the scheme with
residual chlorine of required PPM at bulk supply point including all type of brake down works for civil works. Providing sufficient No. of
Supervision skilled and unskilled labours and providing security for all head works sites, pipeline etc for overall management of O&M
work of whole scheme based on Mahi River for 70 villages and their habitation for 24 hours for 5 months periods. (Without Pumping
Qty Unit Item Rate Per Amount
Supplying of Site Engineer ,Chemist, Data Entrery operator for
computer, Skilled/Semi Skilled/Unskilled labour for operation and
maintationance of gravity main and distribution lines in Reg.
Scheme incl.as per site condition and as per instruction of E.I.C.
incl.water supply at various villages Level in including Regional
W.S.S. (As Per Attach Statement) (as Per Gujarat Minimum
Wages Rate Attached Statement )
153.00 Day Computer Data Entry Operater 635.98 Day
3519.00 Day Lineman cum Valve man/Operator 623.52 Day
1224.00 Day Helper 609.82 Day
Maintanance and Repair Cost inclusive all Materail,Machinery &
5.00 Months Manpower required as per site condition 61711.66 Months
As per approved M&R Estimate 2024-25
Transportation charges of chlroine cylinder inlcuding all types of
labour, charges, loading from HW to unloading at GACL, After
5.00 Nos. refilling Loading and unloading back to HW Site and SHW site (at 2901.00 Nos.
Malekpur HW , Dalji na chakaliya SHW and Ranpur Boosting
I / We, am / are willing of carry out the work .......................... % above / below% .............. age (Percentage should be writing in
figure and word below above at the tender rate mentioned above amount my / our tender workas under
1. Estimated cost put to tender 1. Estimated cost put to tender
2.Tender cost :- 33,60,954.78/- 2. Tender cost :- 33,60,954.78/-
3. Deduct????% below 3 . Add?????. % above
5 In word Rs??????????. 5. In word Rs??????????.
Signature of Deputy Ex. Engineer, Eecutive Engineer
The P.H.Sub Division P.H. Work Division
Contractor. Lunawada Lunawada
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Volume.pdf
Schedule-B.pdf
Hindoliya Pipeline Details 2025-26.pdf
Hindoliya EXT Map-Model.pdf
GR-Labour.pdf
1203_3_GR_15022024.pdf
10-10-2025 - Paripatra ACL Godhra Mini Wage.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .