Loading…
Loading…
Tender ID
Tender Value
₹44.7 L
EMD Value
₹52,700
Closing Date
16 Apr 2026, 6:10 pmClosed
Executive Engineer (Mech.),Gandhinagar
Construction of administrative office building at port Okha Part-3 Electrification (2nd attempt)
292638
01 of 2026-27
Open
Electrical
Works
Gandhinagar
13 documents required · 12 mandatory · 1 optional
₹1,770
Gujarat Maritime Board NON PLD, Gandhinagar.
₹52,700
1 Apr 2026
1 Apr 2026
1 Apr 2026
16 Apr 2026
1 Apr 2026
Name of work: Construction of administrative office building at port Okha Part-3
Electrification (second attempt)
Amount put to Tender: - Rs.
The Executive Engineer (M)
Gujarat Maritime Board
Sector – 10 A, Opp. Air Force Station
Gandhinagar - 382
Email: [email protected]
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Name of work: Construction of administrative office building at port Okha
Part-3 Electrification(second attempt)
Chapter Name Page No.
- Title Page 01 to
01 Notice Inviting Tender 03 to
02 General Information 06 to
03 Instruction to bidder 09 to
04 PQ FORM LIST- I TO VI 18 to
05 Tender Form for Electrical Work 25 to
06 Scope of work 95 to
07 Item specification 96 to
08 Insurance 107 to
09 Third Party Inspection condition 108 to
10 Commrcial condition 109 to
11 General Conditions 110 to
12 Work Conditions 112 to
13 Drawings 114 to
13 Price bid 116 to
Please read as:-
(1) GUJARAT MARITIME BOARD instead of GUJARAT STATE.
(2) Vice Chairman and Chief Executive Officer, GMB instead of Governorof
(3) EXECUTIVE ENGINEER (MECH.) instead of EXECUTIVE ENGINEER.
(4) Executive Engineer (Mech.), Gujarat Maritime Board, Gandhinagar
instead of Executive Engineer (Mech.), Gujarat Maritime Board, PIU
Signature of Contractor Executive Engineer (M),
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
NOTICE INVITING TENDER (NIT)
On behalf of the Chairman-Gujarat Maritime Board, the Executive Engineer (Mech.), Gujarat
Maritime Board, Gandhinagar having office at GMB Office Complex, Opposite Air force
station, chh road, Gandhinagar-382010 (Gujarat) reputed agencies having sound background
and experience in such type of similar work.
Department Name : Gujarat Maritime Board
Superintending Engineer (Mech.),
Circle : 5th Floor, Sagar Bhavan, Sector 10A, CHH Road
Gandhinagar -382010.
Division (For Inviting Tander Executive Engineer (Mech.),
only) Gujarat Maritime Board, Gandhinagar.
Division (For issue of A.L. & Executive Engineer (Mech.),
W.O. and work execution) Gujarat Maritime Board, PIU-Porbandar
IFB No. : Tender Notice No.01 of 2026-27
Construction of administrative office building at port
Name of Project :
Okha Part-3 Electrification
Location : At Okha Port. (Gujarat)
Construction of administrative office building at port
Okha Part-3 Electrification (second attempt)
Estimated Contract Value : Rs.
Period of Completion : 24 ( twenty Four) Month
Bidding Type : Open
Bid Call (Nos.) : 01 (One)
Tender Currency Type : Single
Tender Currency Settings : Indian Rupee (INR)
Joint Venture : Not Applicable
Bid Document Fee : Rs. 1,770.00 In form of D.D. (Non-refundable)
Bid Document Fee Payable To : Gujarat Maritime Board NON PLD, Gandhinagar.
Minimum of Rs. 52700.00 in form of FDR of any
Bid Security / EMD (INR) : scheduled/ nationalized bank With minimum 06 (Six)
months validity.
The Executive Engineer (Mech.), Gujarat Maritime
Bid Security / EMD in favour of :
Board, Gandhinagar Payable at Gandhinagar
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Bid Document Downloading
Bid Document Downloading End
Last Date & Time for Submission
Bid Validity Period : 120 days after opening of price bid
Bidder has to submit all the necessary documents
through Online in electronic format through online
scanning and data entry in required Annexures.
Also, all required documents along with Letter of
Application has to be submit in physical form in a
sealed envelope through RPAD/Speed Post only,
from date 17/04/2026 to 24/04/2026 up to office
hrs. At the office of the Executive Engineer (M),
SAGAR BHAVAN, Gujarat Maritime Board, Opp: Air
Force Station, Sector 10A, Gandhinagar-382010,
mentioning the “Name of work on the sealed
1) Tender fee of Rs. 1,770.00(Non-refundable).
Submission of Documents etc. : 2) Earnest Money Deposit of Rs.52,700.00in form
3) Photocopy of PAN Card.
4) GST Registration Certificate.
5) Valid Electrical Contractor License.
6) Valid Certificate of Registration as approved
contractor in E-1 Category or above issued by
R&B department, Gujarat.
7) Bank Solvency of Rs.8.94 Lakh or above from any
Nationalized/Schedule bank for tendering
purpose, issued on or after 1st January
8) PQForms – I to VI.
Note: - No condition will be acceptable in letter of
Bidders shall submit their bid/offer in electronic
format on website, after digitally signing the same.
Bid offer, which are not digitally signed will not be
Remarks : accepted.
No price-bid offer in physical form will be accepted
and any such offer, if received by GMB will be
outright rejected.
Contact Information : Phone. + 91 079 23246551 / 23238346/7/8
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Email: [email protected]
Dt: 27/04/2026 from 12.00 Hrs. Onwards…
Onlinebid Opening Date :
The Executive Engineer (Mech.),
Officer Inviting Bids :
Gujarat Maritime Board, Gandhinagar.
Officer as E.I.C. at site after issue of The Executive Engineer (Mech.),
A.L. and W.O. Gujarat Maritime Board, PIU-Porbandar.
The Superintending Engineer (Mech.)
Bid Opening Authority :
Gujarat Maritime Board, Gandhinagar.
The Superintending Engineer (Mech.),
Address : 5th Floor, Sagar Bhavan, Sector 10A, CHH Road
Gandhinagar -382010.
General Terms and Conditions:-
(1) Bidders can download the tender document free of cost from the website.
(2) Bidders have to submit Price bid in Electronic form only on n-procure website till the Last
Date & time for submission.
(3) Offers in physical form will not be accepted in any case.
(4) Free vendor training camp will be organized every Saturday between 4.00 to 5.00 P.M. at
(n) code solutions-A Division of GNFC Ltd. Bidders are requisite take benefit of the same.
(5) Government of Gujarat & Governor Shall be Read as GUJARAT MARITIME BOARD &Vice
Chairman and Chief Executive Officer-GMB, respectively.
Bidders who wish to participate in online tenders will have to procure / should have legally
valid Digital Certificate as per Information Technology Act-2000 using it they can sign their
electronic bids. Bidders can procure the same from any of license certifying Authority of India
or can contract (n) code solutions- A division GNFC Ltd, who are licensed Certifying Authority
by Govt. of India.
All bids should be digitally signed, for details regarding digital signature certificate related
training involved the below mentioned address should be contacted:
(n) Code Solutions
A division of GNFC
301, GNFC Info tower, Bodakdev,
Ahmedabad – 380 054 (India)
E-mail: [email protected], Web-site: www.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
Other Terms & Conditions as per detailed tender documents.
Signature of Contractor Executive Engineer (M),
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
GENERAL INFORMATION
The Gujarat Maritime Board (GMB) was set up on 5thApril 1982 under Gujarat Maritime
Board Act, 1981 (Gujarat Act No. 30) in order to develop, administer, operate and
regulate the state’s port sector. In 1998/99 GMB constructed the building of its Head
Office as a cornerstone for controlling and coordinating various port activities.
On behalf of the Gujarat Maritime Board, the Executive Engineer (Mech.), GMB,
Gandhinagar invites tenders from reputed agencies having sound background and
experience in Electrical work for “Construction of administrative office building at port
Okha Part-3 Electrification”.
2.2 Site Information
The contractor has to carry out the said work at Okha. Contractor is strongly advised to
visit the site and acquainted himself with the site condition its surrounding etc. in view
of performing the scope of tender.
Okha port is connected to the rest of India by broad gauge railway system. It is connected
by road to by National Highway. Nearest Domestic airport is Jamnagar, which is 170 km
The Okha Port is approximately 01 kms away from Okha, connected through Road, where
the various types of cargo are being handled Operations take place throughout the year
at anchorage and jetty. GMB is in a plan to Construction of administrative office building
at port Okha Part-3 Electrification.
Latitude : 22.47270 N
Longitude : 69.08100 E
The port is well connected with the State Highway and broad gauge railway line. Nearest
international airport is Ahmedabad.
Contractor is advised to visit the site and acquainted himself with the site condition its
surrounding etc in view of performing the scope of tender.
2.3 Definitions:
In the contract as hereinafter defined, the following words and expressions shall have the
meaning hereby assigned to them except where the context otherwise requires.
The Expression “Board” means Gujarat Maritime Board constituted under the
Gujarat Maritime Board Act
The expression “Work” where used in this document shall, unless there be
something in the subject or contest repugnant to such construction, be constructed
to mean the work or the work contracted and to be executed under or in virtue of
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
the contract, whether temporary or permanent and whether originally or altered,
substituted or additional. It shall include all extra or excess works and variations and
be subject to all commissions ordered in accordance with these conditions.
“Site” means the land, jetty, dry-dock and/or other places on, stacking area, under,
in or through which works are to be executed or carried out and services to be
rendered any other lands or places provided by Gujarat Maritime Board for the
purpose of the contract together with such other places that may be specifically
designated in the contract as forming part of the site.
“Contract”means the notice inviting tenders, general conditions of contract, terms
and conditions of contract, specifications, price bid, tender and contract agreement
made at the time of awarding the work and also the mutual agreement made jointly
during contract period.
"Contract Price" means the sum named in the tender subject to such additions
thereto or deductions there from during negotiation as may be under the provisions
hereinafter contained.
“Contract Period” means total time limit allowed for this work from the date of issue
of work order by the Executive Engineer (Mech.), GMB, PIU Porbandar for this
“Bidder”/” Contractor”/”Agency” shall mean the person or persons, firm, company
or corporation who’s tender has been accepted by the GMB and includes Bidder’s/
Contractor’s personal representative, successors and permitted assignees or joint
Bidders who shall be deemed to be bound jointly and separately.
“Requirement” means total quantity or numbers of system required as per tender
requirement and accordingly order has placed by the Executive Engineer (Mech.),
GMB, PIU-Porbandar or his authorized representative. The requirement may be
increased or decreased as mentioned in the tender document which approved by
the Competent authority.
“Engineer-in-charge” (EIC) shall mean The Executive Engineer (Mech.), GMB, PIU-
Porbandar for his authorized representative who shall exercise only such authority
on behalf of the Executive Engineer as may have been delegated to him from time to
time by the Executive Engineer and powers delegated to him by the
Government/GMB Rules.
“Approved” means approval given in writing including verbal approval for which
subsequent written confirmation is given and “approval” means approval in writing
including as aforesaid.
“Competent authority” Officer or officers of the Gujarat Maritime Board competent
to exercise the powers conferred upon him/them by the GMB/Government.
“Drawings” means the drawings referred to in the specifications and attached with
the agreement and any modifications of such drawings approved in writing by the
classification society / EIC or such other drawings as may, from time to time be
furnished or approved in writing by the EIC.
2.4 Abbreviations:
GMB / Board - Gujarat Maritime Board.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
EIC - Engineer-In-Charge.
BOQ - Bill of Quantities.
BIS - Bureau of Indian Standard.
SE (Mech) - Superintending Engineer (Mechanical)
XEN - Executive Engineer (Mech.),
DEE (Mech) - Deputy Executive Engineer (Mechanical)
GoI - Government of India
GoG - Government of Gujarat
IRS - Indian Register of Shipping
NIT - Notice Inviting Tender
Signature of Contractor Executive Engineer (Mech.),
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
INSTRUCTION TO BIDDER
On behalf of the Gujarat Maritime Board, the Executive Engineer (Mech.), GMB, Gandhinagar
invites tenders fromreputed agencies having sound background and experience in any
Electrical work for “Construction of administrative office building at port Okha Part-3
Electrification”
3.1 BID SUBMISSION :
a) The bid should be uploaded (submitted) through the official web site
www.nprocure.com “As per NIT”.
b) The physical documents shall be submitted through RPAD/Speed Post only“As per
NIT”. Beyond the last date physical submission will not be accepted/ considered in
any case and it will be returned back to the bidder. The envelope must be super-
scribed with name of work. GMB is not responsible for the tender process, if on the
cover name of tender work is not mentioned.
c) The Board does not assume any responsibility for the supporting tender documents
being torn/ damaged during the postal transit. It is the responsibility of the Bidder
to see that the supporting tender documents reach this office before due date as
fixed and notified in the tender notice for the purpose of receipt of the tender.
3.2 TENDER FEE (NON-REFUNDABLE):
Tender Document can be download from GMB website www.nprocure.com and the
tenderer have to pay tender fee in form of Demand Draft (DD) “As per NIT". Scanned copy
of the same must be uploaded online as well as physical submission as per NIT.
Tender without Tender fees, will be rejected outright.
3.3 EARNEST MONEY DEPOSIT (EMD) :
a) The Bidder shall submit Earnest Money “As per NIT” in form of Fixed Deposit Receipt
(FDR) with the tender, failing which the tender will not be considered.
b) The Earnest Money shall be submitted in the form of FDR of any scheduled/
nationalized bank as “Mentioned in NIT”. Cheque/D.D. will not be accepted towards
the Earnest Money Deposit.
c) The Earnest Money deposited by the unsuccessful Bidders will be refunded after the
finalization of tender. E.M.D. shall not bear any interest.
d) The Earnest Money deposited by the successful Bidder will be refunded on receipt of
Security Deposit and Performance Security.
e) If any party backs out after GMB has accepted his bid, it will be considered default
and in such case, necessary action against bidder will be taken by GMB such as
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
i. Forfeiting of EMD
ii. Black listing the agency for three years, etc.
3.4 SECURITY DEPOSIT (SD) :
The successful Bidder has to furnish a Security Deposit (SD) by FDR with the Gujarat
Maritime Board.
a) The successful Bidder will be required to furnish a Security Deposit (SD) of sum of “10
% of the Contract value + Applicable GST”, in the form of Fixed Deposit Receipt (FDR)
with the Gujarat Maritime Board of Nationalized/ scheduled Bank.
b) If the security deposit is not furnished within 15 days on issuing acceptance letter or
such extended period as may be permitted by the Executive Engineer (Mech.),
Gandhinagar in writing, the Earnest Money deposit is liable to be forfeited and the
tender will be considered as cancelled. The board shall take penal action up to black
listing the agency for period of 03 years.
c) In the event of the Bidder, after the issue of the Acceptance Letter (AL) by the GMB,
fails/refuse to execute the agreement as hereinafter provided, the Bidder shall be
deemed to have abandoned the contract and such an act shall amount to be
construed as wilful breach of contract. In such case the Board shall have full right to
claim damages incurred in addition to the forfeiture of earnest money deposit.
d) The GMB may at their option forfeit the Security deposit, if the TPI fails to affect
perform the services or observe the conditions of contract. The Board will also be at
liberty to deduct any sum that may be due to the GMB from the Security Deposit or
from any sums of money due or that may become due under any other contract from
the bidder.This is without prejudice to the rights of the Board under the terms of the
e) The said Security deposit shall not in any way be construed as a limitation of the
Contractor’s responsibility or liability pertaining to his obligations and/or guarantees
under the contract and shall be without prejudice and in addition to any other
remedies available to the Board in terms of the contract and/or the laws of the land.
f) The Security Deposit of 10% shall be released only after completion of satisfactory
Performance Maintenance Guarantee /warranty period of 1(one) years after
completion of the work.
3.5 TIME SCHEDULE:
The time allowed for the Completion of the work “Construction of administrative office
building at port Okha Part-3 Electrification” is considered as 24 (twenty four) Month from
the date of start/commencement.
3.6 RIGHT OF THE BOARD TO ACCEPT OR REJECT THE TENDER:
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
a) The Board does not bind itself to accept the lowest tender and reserves the right to
reject any or all tenders received without assigning any reason, whatsoever.
b) Tenders in which any of the particulars and prescribed information is inadequate or
incomplete in any respect and/or the prescribed conditions are not fulfilled are liable
to be rejected.
c) The Gujarat Maritime Board reserves the right to drop the entire tendering process
without assigning any reasons thereof.
d) The Gujarat Maritime Board reserves the right to reject any bidder on the basis of
past experience OR previous history of bidder under any contract of GMB.
3.7 PRE CUM TECHNICAL QUALIFICATION:
The bidder’s qualification shall be decided on the basis of information submitted in the
prescribed Annexures & qualification criteria mentioned in this tender document i.e.
experience, financial position, etc. as well as other documents mentioned in NIT and
hence all bidders are requested to fill the information strictly correct in prescribed
Performa only with full knowledge and supporting documents otherwise they will be
disqualified for the work.
The information for financial data and project costs by the bidder should be submitted in
Indian Rupees only.
The competent authority of the Gujarat Maritime Board shall evaluate the pre-
qualification documents.
3.8 MINIMUM QUALIFICATION CRITERIA AND EVALUATION PROCEDURE :
1. PQ cum technical bid will be evaluated on the basis of documents submitted as per
NIT and following main criteria as per details provided by the bidders in requisite
Performa i.e. Annexures, along with prescribed application form given in this bid,
without which tender/application will not be considered for evaluation and opening
of price bid. Bidders who fulfil the minimum criteria will be qualified for opening of
Main criteria of evaluation are as following:
Main criteria of evaluation:
A. General Criteria. (Required Documents as per NIT)
B. Financial Criteria.
C. Experience Criteria
B. Financial Criteria :
Annual Turnover of last 05 financial years i.e. from 2020-21 to 2024-25 of bidder will
be considered for evaluation. It should be more than Rs. 45 Lacs in any one of the
Solvency Certificate: Bank Solvency of Rs. 8.94 Lakh or above from any
Nationalized/Schedule bank issued on or after 1st January
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
C. Experience Criteria:
Work Completion certificate for similar work, which shall be completed during the
last 05 financial years i.e. from 01-04-2020 to last date of online submission of bid,
whose costing/value/amount should not less than Rs. 17.87 lakh
*Similar work means: Experience of successfully completion of any electrical works.
Details of submission of required document are as per mentioned in PQ from- V
3.9 BID OPENING :
a) The On-line tender for Pre-Qualification cum Technical bid shall be opened “As per
b) The Technical bid shall be opened online of those Bidders who are pre-qualified. The
date and time of opening of the Technical Bid will be notified to the qualified Bidders
in advance of opening.
c) During the process of Bid evaluation GMB may call the bidders for discussion
/clarification and also can ask for requisite support documents.
d) The Price bid shall be opened online for those Bidders who are pre-qualified and
technically qualified.
e) Tenders submitted by Bidders shall remain valid for acceptance for a period of
days from the date of opening of the price bid. The Bidder will not be allowed during
the declared period of validity to revoke or cancel his tender or to vary any term
f) If any Bidder withdraws his tender before the date of validity as declared, the earnest
money deposited by the Bidder, shall be outright forfeited. There shall be considered
as breach of contract and action against bidder shall be taken according to norms.
g) The work will be awarded to the lowest techno-commercial offer after approval
obtained from the competent authority.
h) Only the authorized representatives of the bidders will be allowed to be present
during bid openings.
3.10 COLLECTION OF DATA - BIDDER'S RESPONSIBILITY:
The Bidder shall visit the site and acquaint himself fully with the site and local conditions
and no claims whatsoever will be entertained on the plea of ignorance of difficulties for
execution of the work.
Before submitting the tender, the Bidder shall be deemed to have clearly understood and
satisfied himself regarding the work and services, all conditions liable to be encountered
during the execution thereof and that prices, rates and/or compensation quoted in the
offer are adequate and all-inclusive with respect to all factors, circumstances and
conditions likely to be incidental, both direct and indirect, to the work and services
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Contractor is strongly advised to visit the site and acquainted himself with the site
condition its surrounding etc. in view of performing the “Scope of Work”.
In general, Collection of DATA is Bidders responsibility.
3.11 ADDENDA / CORRIGENDA:
The Executive Engineer (Mech.), GMB, Gandhinagar shall have the right to revise or to
amend the contract documents prior to the date of receipt and opening of the tender
aforesaid such revision or amendments or extensions, if any, shall be communicated to
all concerned in the form of a letter or by notice in the press, as may be considered
Addenda/Corrigenda to the tender documents may be published by the Executive
Engineer (Mech.), GMB, PIU-Porbandar prior to the date of opening of the tenders, to
clarify or reflect modifications in the contract terms and conditions. Any
Addendum/Corrigendum will become part of Tender document.
3.12 AMBIGUITY:
In case of there be any ambiguity or doubt as to the meaning of any of the tender
clauses/conditions or, if any further information is required, the matter should
immediately be referred to The Executive Engineer (Mech.), Gujarat Maritime Board, PIU-
Porbandar in writing, whose interpretation shall be final and binding to the contractor.
3.13 TERMINATION
Gujarat Maritime Board shall be entitled to terminate this contract at no cost due to:
a) In the event bidder is adjudicated or found bankrupt of insolvent or any order is made
or resolution passed for the winding up, liquidation of dissolution of bidder firm.
b) This CONTRACT shall be deemed to have been automatically terminated on the
completion of guarantee/defect liability period.
c) If, GMB considers that the performance of the contractor is unsatisfactory or, not up
to the expected standard, the GMB shall notify the contractor in writing and specify
in detail the cause of such dissatisfaction. The GMB shall have right to terminate this
CONTRACT by giving 30 days’ notice in writing to the contractor, if, contractor fails to
comply with the requisitions contained in the said written notice issued by the GMB.
d) If, contractor abandons this Contract or if he fails to perform or observe any of the
obligations OR its part to be performed and observed hereunder and refuses to take
steps to remedy the same within 7 (seven) days of written notice from GMB Or for
any other reason by giving 10 days written notice, stating the reasons for termination.
e) Termination of this Contract shall be without prejudice to any rights or remedies
accrued to either Party prior to such termination.
f) No further payment shall become due to the contractor in respect of any period after
termination of this Contract with the exception only on any payment previously
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
accrued and due for payment to contactor for satisfactory service under the terms of
3.14 PERMITS, LAWS AND REGULATIONS
The Contractor shall carry out the work bound by all applicable laws of Indian Electricity
Act & Gujarat Maritime Board (GMB) and hereby undertakes to comply and to ensure
compliance with all laws, ordinances, rules, regulations, bye-laws, decrees and orders
whether of GMB/GOG/GOI or other authority for Obtaining Permits etc.
Contractor shall be responsible for obtaining and maintaining all licenses, permits,
clearances, certifications and authorizations necessary for the performance of his
obligation under this Contract at his own cost.
3.15 SAFETY & INSURANCE
The Contractor shall at his own expense arrange for all the safety provisions normally
called for by the nature of on-shore electrical asset repairing work and as ordered by the
competent Authority/EIC OR his authorized Representative in respect of all personnel
directly or indirectly employed for this contract.
The contractor shall be responsible to arrange insurance of all labourers, skilled and
unskilled, workers, supervisors, etc. employed by him for this work, as per labour
regulation of the State at his own cost & there will be no liability comes on GMB in case
of any accident/loss of life or goods during this entire contract.
The Contractor shall be responsible for the safety of their Labours, Supervisor, own
equipment/material during this Contract. The Contractor shall also take such additional
precautions as may be indicated from time to time by the EIC or his authorized
Representative with a view to prevent any losses like theft, fire hazards, act of god, etc.
Without limiting his obligation and responsibilities under various clauses & conditions in
this contract, the contractor must insure “Workman Compensation Policy with Medical
Extension” for all labourers, skilled and unskilled, workers, supervisors, etc. deployed for
said work. The cost of tender includes all medical compensation that is to be extended to
the workers employed by the contractor in case of any sort of medical requirement that
may arise to the workers and GMB would not be liable for the same.
Any accident/death of person/theft occurs during execution of this work, the GMB has
no liability for the same. It will be solely contractor’s responsibility.
3.16 LAWS GOVERNING THE CONTRACT
This Contract shall be subjected to the laws and regulation governed by the GMB &
Government of Gujarat that may be in force during the Contractual period.
3.17 JURISDICTION:
The award of contract is subject to the Okha Port (Gujarat State) jurisdiction.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
3.18 SIGNING THE CONTRACT:
The successful Bidder shall be required to execute an Agreement on stamp paper of the
required value within 15 days from the date of issue of the notice of Letter of Intent with
submission of Security Deposit as per above stated clause. In the event of failure on the
part of the successful Bidder to execute the agreement within the above stipulated
period, or the period agreed by the GMB, the Earnest Money deposited by him will be
forfeited and apart from that the GMB being in such circumstances entitled to treat the
successful Bidder as in breach of contract and proceed accordingly.
3.19 INSTRUCTIONS TO BIDDERS TO FORM PART OF THE AGREEMENT :
All these instructions, conditions, special conditions, if any, Technical specifications
contained in the tender document and any correspondence related to this Contract shall
form part of the agreement.
1) Letter of Application shall be submitted in proper format. Incomplete offers shall be
2) The bidder shall satisfy himself with regard to the nature of work to be carried out, its
scope, the conditions of the contract, etc. included in the bid document.
3) The cost associated with the preparation and submission of bid shall be borne by the
bidder and GMB shall in no case be responsible or liable for such costs.
4) The language for submission of bid should be in English.
5) The enclosed schedules should be filled in completely and all questions should be
answered. If any particular query is not relevant, it should be stated as "NOT
6) Financial Data, Projects Costs, value of work etc. should be given in Indian rupees only.
7) For any clarification, for site visit and information regarding relevant data will be
available at office of Executive Engineer (Mech.), PIU Porbandar, GMB Office Complex,
Nr.S.T.Bus Station, Chowpati Road, Porbandar – 360575 (Gujarat).
8) If a proprietary firm makes the application, it shall be signed by the proprietor above
his full name and the full name of his firm with its current address.
9) If the application is made by a firm in partnership, it shall be signed by all the partners
of the firm, above their full names and current addresses or by a partner holding the
power of attorney of the firm by signing of the application in which case a certified
copy of the power of attorney shall accompany the application A certified copy of the
partnership dead, current address of the firm and the full names, and current of all
the partners of the firm shall also accompany the application.
10) If limited company or a limited corporation makes the application, a duly authorized
person holding the power of attorney for signing the application in which case a
certified copy of the power of attorney shall accompany the application shall sign it.
Such limited company or Corporation will be required to furnish satisfactory evidence
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
of its existence before the contract is awarded.
11) Information furnished must be sufficient to show that the applicant is a capable in all
respects to successfully complete the envisaged contract works strictly on the basis of
the applicant, having already carried out satisfactorily works of similar size, nature and
12) While submitting the schedules, duly filled in, the applicant shall enclose the latest
copies of brochures and technical documentation giving more information about the
firm and all the members.
13) The Gujarat Maritime Board reserves the right to reject any or all bids without
assigning any reasons and the Gujarat Maritime Board decision shall be final and
14) No costs incurred by bidder in making this offer like providing clarification or attending
discussions, conferences or site visits will be reimbursed by the Gujarat Maritime
15) Bidder shall enclose list of similar nature of jobs under taken during last five years.
Copies of certificates/documents in support shall be attached.
16) Details of the litigation, if any, during last three years shall be furnished.
17) During the tenure of profession, details of awards, if any and such additional
information shall be furnished.
18) The PQ cum Technical Bid should contain all other documents except the price bid,
like specifications, general conditions, etc. and Bidder’s letter regarding deviations to
the general terms & conditions, if any. It should be very clearly understood that the
PQ & Technical Bid should be restricted to only "Technical Matters” and the tender
quoted price must not be discussed in the PQ cum Technical Bid. Conditions in "PQ
cum Technical Bid" should be specific so as to evaluate them correctly and to arrive at
the correct financial effect.
19) The bidders will understand clearly that the rates quoted are for complete works and
include all costs due to POL, labor, plants & equipment’s, transportation, supervision
of GMB officials including lodging & boarding, various other services like water, power,
materials and all matters and things necessary for satisfactory completion of the work
and no claim for additional payment beyond the offered/accepted rates will be
entertained and the bidder will not be entitle subsequently to make any claim on the
ground of misrepresentations or on the ground that he was supplied with wrong
information given by any person (whether the person is the employee of GMB or not).
Any failure on the part of Bidder to obtain all necessary and correct information for
the purposes of filling his Bid and prices / rates therein shall not relieve him from any
risks or liabilities arising out of consequence upon the submission of the Bid.
20) The price bid should contain only rate and amount of the work. Any condition in the
price bid shall be liable for rejection of offer of that bidder.
21) No contract will be awarded except to the qualified and responsible bidders capable
of performing the classes of work contemplate.
22) No Bid shall be deemed fit for consideration unless, it is completed in all respect.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
23) No conditional tender will be accepted.
24) No change or supplementary information (unless & until asked by GMB) in respect of
the offer shall be accepted after its submission. The bidder shall not make any
alteration in the bid documents.
25) The successful bidder shall have to enter in to an agreement with the Gujarat Maritime
Board in the prescribed format. The cost of stamp papers etc. for the agreement shall
be borne by the bidder.
26) All document submitted will be the property of GMB and GMB reserves the
right to use these documents without any prejudice.
Signature of Contractor Executive Engineer (Mech.),
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
P.Q. Forms List
QUALIFICATION DATA SHEET TO BE FILLED UP BY THE BIDDER.
The qualification questionnaire contains the following forms:
P.Q. FORM-I : Letter of Application
P.Q. FORM -II : Document Fees & EMD Details
P.Q. FORM III : General Details
P.Q. FORM IV : Turn Over
P.Q. FORM–V : Details of experience- A
P.Q. FORM -VI : History of Litigation
Executive Engineer (Mech.),
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
LETTER OF APPLICATION
The Executive Engineer (Mech.)
Gujarat Maritime Board
Having examined the Bid documents including scope of works and time frame of the aforesaid
work, I/we hereby submit all necessary information and relevant documents as desired.
The application is made by us on behalf of M/s. (Bidder) duly authorized to submit the offer.
The necessary evidence admissible in law in respects of authority assigned to us on behalf of
the firms for applying and for completion of the contract document is attached herewith.
It is certified that the information furnished in this document is correct & authentic.
I/We confirm that we have not been barred & blacklisted by any Government organization
OR Major Port Trust OR Minor Port Board in India for any such works in last Three Years.
I/We shall make available to the GMB any additional information it may find necessary or
require for this tender purpose.
I/We promise that we will abide by all rules & regulation as laid down by G.M.B. time to time
for execution of any contract as may arise during this contract period
I/We have examined and have no reservation to these tender documents with any addendum
I/We undersigned accept that GMB reserves the rights to reject any or all tender for this work
without assigning any reason.
Signature of the applicant
(Name in bracket)
Encl: As per NIT
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Document Fees & EMD Details
Document Fees Detail
D.D./Banker’s cheque No.& date
Bank Name & Address
Bank Name & Address
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
GENERAL INFORMATION
All individual firms applying for pre-qualification must complete the information in these
1. Name of firm:
2. Head office address:
3. Local office address (if any):
4. Telephone: Contact:
5. Facsimile: E-Mail & Website:
6. Place of incorporation / registration: Year of incorporation / registration:
9. Main lines of business:
10. Details of office set up with Key staff
name, designation, & other detail
11. Other information ( if any)
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
All individual firms applying for pre-qualification must complete the information in these
Particular Year Value
Turnover 2020-21
Turnover 2021-22
Turnover 2022-23
Turnover 2023-24
Turnover 2024-25
Note: Copy of Chartered Accountant certificate shall be attached online with the Tender.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Bidders should provide information showing their experience for similar works as mentioned
in the table below.
Experience of successfully completed works during last 05 financial years i.e. from 01-04-2020
to last date of online submission of bid for the proposed work as per relevant clause of PQ bid
shall be taken in to consideration.
A. Experience in Contracts of works completed:
Sr. Name Owner/ Address Contact person Value of Detail Order Successfully
No of Client with phone name & Mobile contract (copy Attached) Completion
work / Fax No. no. Certificate of
Client (Attached/
1. The above information should be filled in the table and supporting documents
in soft copies should be submitted inclusive of work order and Completion
certificate etc. in e-tender.
2. If Bidder will submit Government experience work then they should submit
Form-3A for that particular work duly signed by the authority for that.
3. If bidder will submit Non-Government work experience cert OR Subletting
work experience cert then they have to furnish following certificates.
- Self-attested copy of Work order, completion certificate.
- Self-attested copy of letter of permission/approval given by the employer
for subletting the work.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
History of Black Listing and Barring / Litigation
Non judicial Stamp paper of Rs.300/- or Above
We here by undertakes and confirms that our agency
M/s.__________________(Bidder)________________ have been neither black listed nor
banned for tender participation or execution of the works by any Govt./PSU Authority in last
03 (three) year.
Yours faithfully,
(Name of Authorized signatory)
(The stamp paper submitted shall be purchased on a date subsequent to the date of
publication of the tender advertisement.)
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Roads & Building Department
Government of Gujarat
Division:_ “Mechnical Division - Gandhinagar___
ELECTRICAL WORK
Construction of administrative office building at port Okha Part-3
Name of work :- Electrification
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Name of Work: Construction of administrative office building at port Okha Part-3
Electrification
Tender Booklet contains 55 Pages
C Instructions to tenderers
Form of tender for electrical work (induplicate) with schedule of time
E General Conditions
F Data Sheet for E-tendering
G General Condition of contract for electrical works
J Specification for electric works
K List of approved Electrical Products
(i) Amount put to tender Rs.
(ii) Tender fee Rs. As per NIT & Tender
(iii) Earnest Money Rs……………………….. Documents
(iv) Security Deposit Rs…………………… Performance Bond Rs….………....
Last Date of Receipt of Tenders by R.P.A.D. Dt. ____/____/_________
Downloading of tender documents
Divisional Account/D.A.O.
Executive Engineer (Mech.)
(Only in case of Tender above Ten lakhs)
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
2. Estimated Cost … Rs. ………………………………………….………
3. Earnest Money 1% Rs. …………………………………………………
4. Validity period of tender offered …
(90/120*) days from the stipulated date of
receiving tender ifTender
tenders are invited off line
and no modification shall be allowed after
handing over the to postal authorities. In case
of on line tenders, the validity period shall be
counted from the date of opening on line
tenders, in case of single cover system tenders
and from the date of opening technical bid in
case of two cover system tenders
5. Security Deposit -
(i) In the form of small
Savings or Narmada Bonds or FDR of schedule
(of minimum one year time limit) 2.5% Rs. ……………………………………………….
(ii) To be deducted from bills (Security Deposit) 2.5% Rs. ……………………………………………….
(Deduction at rate of 5% from each Running Bill
As per NIT &Tender Documents
shall be made till stipulated maximum amount is
(iii) Performance bond of schedule Bank 5% Rs. ……………………………………………….
(In case of tender estimating Rs. 30 lacs or more)
6. Time limit … As per NIT & Tender Documents
* Strike out whichever is not applicable
* Vide R & GD G. R. No. TNC – 1088 – 1B/1 (13) / C dated 4-5-1993 & revised vide G.R. No. TNC-1088/IB/18(13)-
C, dated 31-8-94. & TNC-10-2013-3-(Part-1)-C, dated 19/11/2013& TNC -10-2013-3 (Part 2)-C dated 20-11-13
Deposit furnished in the form of interest bearing document as per Item .4 (i) can further be extended
for renewal if so desired and communicated by the Contractor in writing before one month from the date expiry
date. Similarly Security Deposit deducted as the Item No.4 (ii) can also be converted into interest bearing fixed
term securities of schedule and Nationalised Bank. If so desired and communicated by the contractor in writing.
The security Deposit will be released against Bank Guarantee as provided in Clause 3.8 of General Condition of
Should this tender be accepted, I/We hereby agree to abide by and fulfil all the terms and Provisions of
the conditions of the contract annexed here to so far as applicable and in default thereof to forfeit and pay to
Government in office the sums of money mentioned in the said conditions.
(Receipt No. ___________ dated _______________ from the Government Treasury or Sub-Treasury at
_____________ in respect of sum Rs.* _________________________________ is forwarded herewith
representing the earnest money + (a) the full of value of which is to be absolutely forfeited to Government
should I/We not deposit the full amount of security deposit specified in the above memorandum in accordance
with Clause-I of the said conditions, otherwise the said sum of above Rs.
______________________________shall be refunded).
*Digital signature of contractor
**Signature of the contractor
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
(Witness)*** (At the time of execution of contract document)
*Digital signature of contractor before submission of tender.
**Signature of contractor at the time of execution of contract document.
***Signature of witness to Contractor’s signature at the time of execution of Contract document
The above tender is hereby accepted by me on behalf of the Government of Gujarat
Signature of the Executive Engineer (Mech.),
Note: The normal rate of Security Deposit is 5 percent for works upto Rs. 30 lacs and further 5 % as performance
bond for works above Rs. 30 lacs. Out of 5 % of Security Deposit 50 % is Payable at the time of acceptance of
tender and the balance by deduction from progress bills.
Instructions to Tenderers
1. Tenders, sealed and marked on the outside for
“Will be received by undersigned
Upto the day of
In the form of “Tender for Electrical Works” hereto annexed
2. The tendererd shall state precisely in his tender the type and description of the materials, plant
and stores he proposes to use for the work. If he proposes to use materials, plant or stores of other
than Indian manufacture he must clearly state this in his tender, together with the name,
manufacturer and of the country of origin of the same.
3. The office with whom cash deposits are to be made, or to whom securities are to be endorsed
accordance with clause 3 of General Condition of Contract for Electrical Works, is the Ex
4. The work must be carried out in accordance with the General Condition of Contract for Electrical
Works and the general specification for electrical works in Government building.
5. Plans may be seen, in the office of the Executive
6. The Governor of Gujarat does no undertake to accept the lowest or any tender.
Executive Engineer (Mech.).
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying tender
for the several sums, and in the case of measured works, at the several rates, set forth in the tender
hereto attached and signed by me/us and should this tender be accepted. I/We further undertake
to complete the work within the time stated below reckoned form the date of acceptance of
tender, namely.
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of contract
and the Special Conditions of Contract annexed to the Specification or in default thereof to pay to
the purchaser, as reasonable compensation for such breach of such conditions, the sums of money
mentioned in the said condition.
3. I/We further agree to make good at my/our own expense all defect in the installation which appear
within twelve months from the date bringing the installation into beneficial use when such defects
are due to defective workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-division
as an Executive Engineer (Mech.), Deputy Executive Engineer, Additional Assistant Engineer,
Overseer, Divisional Accountant, Store Keeper, Manager of Atithi/Vishram Gruha and in the circle
as a Superintending Engineer in additional for Panchayat Works not working nor having posting as
Chairman of P.W. Committee or as incumbent in Jilla Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer (Mech.),
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying tender
for the several sums, and in the case of measured works, at the several rates, set forth in the tender
hereto attached and signed by me/us and should this tender be accepted. I/We further undertake
to complete the work within the time stated below reckoned form the date of acceptance of
tender, namely.
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of contract
and the Special Conditions of Contract annexed to the Specification or in default thereof to pay to
the purchaser, as reasonable compensation for such breach of such conditions, the sums of money
mentioned in the said condition.
3. I/We further agree to make good at my/our own expense all defect in the installation which appear
within twelve months from the date bringing the installation into beneficial use when such defects
are due to defective workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-division
as an Executive Engineer (Mech.), Deputy Executive Engineer, Additional Assistant Engineer,
Overseer, Divisional Accountant, Store Keeper, Manager of Atithi/Vishram Gruha and in the circle
as a Superintending Engineer in additional for Panchayat Works not working nor having posting as
Chairman of P.W. Committee or as incumbent in Jilla Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer (Mech.),
GENERAL CONDITIONS
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
1. The work of the Electrical Installation shall be carried out as per I.S Specifications I.S. 732-Code Part I, II &
III - 1982-82 of practice of Electrical wiring and fitting in building.
For Hospitals I.S. 7732 of
For Educational Installation I.S. 108941-1984
For Aluminium Conductor I.S. 398-1984 Part III
2. The fitting should be fixed with mild steed hooks to be supplied and erected and duly grouted in the cement
concrete by the contractor wherever possible the decision of the EIC in respect of the feasibility of providing
such hooks in the cement concrete, shall be final and binding on the contractors.
3. The work shall have to be completed within the prescribed time limit unless the extension in the time limit
at the instance and the request of the 'contractors is granted by the authorities in which case, the
application for the extension in time limit have to be made by the contractors by registered post before the
date of expire of the schedule time limit under the agreement.
4. The amount of Rs. 1-00 for each empty wooden box of ceiling fan and 0-50 paise for each empty wooden
box of Table fan issued to the contractors for* the work as per Schedule B of the work shall be recovered
from the Contractors.
5. Materials required for the work shall be supplied to the contractor as per rates mentioned in the Schedule
'A' attached herewith and the cost of materials will be recovered form their bills.
6. The tender documents required shall have to be filled in either in ink or by ball pen.
7. In addition to the above the tender will also be liable to be rejected outright if
(i) Any of the pages of the tender is/are removed or replaced.
(ii) In the case of "item rate" tender, the rates are not entered in ink, in figures and words and the total of
each item and grand total are not struck by the tender or in ink in the last column of schedule 'B' under
each item and grand total are not struck by the tender or in ink in the last column of schedule 'B' under
(iii) All corrections, additions or pasted slips are not initialled by the tenderer,
(iv) Any erasure is made by him in the tender AND
(v) The tenderer in the case of a firm, each partner or the person holding the power of attorney thereof
does not sign or the signature is/are not attested by witness on page 8 of the tender in the space
provided for purpose.
8. A certificate of registration as approved contractor should be attached with the tender.
9. In respect of tenders from the co-operative society a solvency certificate of an amount equal to 20% of the
amount of the work put to tender plus cost of work in hand will have to be produced along with the tender
or a certificate, regarding the borrowing capacity of the society issued by the legal Assistant, Directorate of
Cottage Industries will have to be produced along with the tender.
10. The several documents forming the contract are the essential parts of the contract and requirement
occurring in one is as binding as though occurring in all, they are intended to be mutually explanatory and
complementary and to describe and provide for a complete work.
11. In the event of any discrepancy the several documents forming the contract or in any one document the
following order of procedure should apply:
(a) Dimension and quantities:
(ii) Schedule 'B' of the tender form
(iii) Specification
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
On drawing figures, dimensions unless obvious in contract will be followed in preference to sealed
(b) Description:
(i) Schedule 'B' of the tender form
(iii) Specifications
In case of defective description or an ambiguity, the Executive Engineer (Mech.) in charge should issue
further instructions directing in what manner the work is to be carried out is being understood that the
last modern practice is to be followed. The contractor should forthwith comply with such instruction.
12. The contractor should take no advantage of any apparent error, omission in drawings or a specifications
and the Executive Engineer (Mech.) in charge should be permitted to make fulfil the intent of the plans and
specifications.
13. Controlled materials (Essentially certificate)
(i) As regards "Controlled materials, the R. & B. Dept. will help to arrange for the permits as far as possible
and hold the contractor in securing the same. All incidental charges in procuring these materials shall
be borne by the permit as far as possible by the contractor himself. Though the R. &, B. Dept. will help
to arrange for the permit as far as possible and help the contractor in obtaining the materials, it shall
not accept any responsibility for any delay or loss or account of delay caused to the contractor while
obtaining the same.
(ii) The contractor shall submit the monthly returns in the prescribed forms at to the receipts and actual
use of the controlled materials during the month to the EIC of every calendar month.
(iii) The contractor shall submit the Executive Engineer (Mech.) or his representatives to inspect the stock
of the controlled materials by him at any time whenever the Executive Engineer (Mech.) or his
representatives so desire.
14. The tender shall remain open for a period of 90/120* days. The validity period shall be counted from the
stipulated date of receiving tenders if tenders are invited off-line.
In case of online tenders the validity period shall be counted from the stipulated date of opening online
tenders in case of single cover system tenders and from date of opening technical bid in case of two cover
system tenders. (R & B.D. G.R. No. TNC-10-2013(2)-C dated 10-5-2013)
If any tenderer withdraws or makes any modifications or additions in the terms and conditions of this
tender not acceptable to the Government (Public Works Department) as above then the Government shall
without prejudice to any right remedy be at liberty to forfeit in full the said earnest money absolutely.
15. The contractor shall employ only such labourers who shall produce a valid certificate of having been
vaccinated against small pox within a period of last three years.
16. The contractor shall provide drinking water facilities to the workers, labourers to comply with the
provisions, the engineer in charge shall give notice facility to the workers, Labourers within a period of ten
days from the date of the notice in writing, the Engineer in charge shall there upon make the arrangement
for the drinking water at the cost of the contractor.
17. The contractor shall provide the amenity of shade and shelter to the workers, labourers and their children
on Govt. work as soon as the work starts" If the contractor fails to provide shade and shelter than the Govt.
Shall provide the same at the cost of the contractor.
(Govt. Resolution PWD No. TNC-2172 (i) 76-C Dt.4-7-1973)
18. Challan for earnest money @ 1% of the estimated cost must accompany the tender. Tenderer may pay
earnest money up to Rs. 50,000 in cash or on the form of Crossed demand Draft or in case of tenderer is
member of only IEEMA DEPOSIT AT CALL receipts of Nationalized of scheduled Bank drawn in favour if
Executive Engineer (Mech.), Divisional Officer concerned. However in respect of the works estimated to
cost above Rs. 50 lacs, the amount of earnest money in excess of Rs. 50,000 Can be offered by the
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
contractor, at his choice, in the form of Bank Guarantee of the Scheduled Bank only. The Bank Guarantee
in such cases will be furnished in the following form. In such cases also, the amount of first Rs. 50,000 will
paid in the form of cash or crossed demand drafts or fixed deposit receipts or deposit at call receipts worth
the validity period of not less than the 6 Months of the nationalized or Scheduled Banks.
The Contractors, who have secured exemption Certificate for payment of earnest money by depositing
Lump Sum earnest money Deposit need not pay earnest money, but produce the certified copy of the
exemption certificate along with the tender.
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the terms
and conditions of tender for the work of and where as We, Bank agree to give the
tenderer a guarantee for the Earnest Money.
1. Therefore, we hereby affirm Asthat
guarantors Documents
on behalf of the Tenderer up to total rupees
in words) Rs. (in figures)
and we undertake to pay to Executive Engineer (Mech.)s Division
Department of Government of Gujarat the (name of Govt.
previous notice of judicial or to be specified) up to his first written demand, without demur, without
delay and without the necessity of a previous notice of judicial or administrative procedures and without
the necessity to prove to the Bank the defects or shortcomings or debits of the contractor any sum within
the limit of Rs.
2. We further agree that the Guarantee herein contained, shall remain in full force and effects during the
period that would be taken for the acceptance of tender.
However, unless a demand of claim under this Guarantee is made on us in writing on or before the
(Date to be specified-will not be less than 180 days from the date of opening
the tender) we shall be discharged from all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during currency except with the previous consent of the
Executive Engineer (Mech.) Division in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitutions of the Tenderer or of
Date: Signature & Seal of Guarantor
* Strike out whichever is not applicable
19. Wires of I.S.I. mark will be allowed to be used on the work.
20. The rates should be written both in words and figures inclusive of all taxes and duties.
21. The percentage additions in total amount tendered of any items is not allowed however if overall reduction
21. The percentage additions in total amount tendered of any items is not allowed however if overall reduction
in percentage is offered the same should be stated in the prescribed clause added at the end of, schedule
‘B’ in words and figures. If no reduction is to be made the gap should be filled in by the word 'NIL'.
Note : As per Govt. Resol. No. CDN/1269/PAC/51-C.dt. 15/4/1978
22. Safeguards :
(a) That the percentages and the tender amount by each contractor shall actually be shown to the other
contractors who may be present at the time of opening the tenders.
(b) That a tender with any erasures and/or over writing in percentage (both in word and in figures) shall be
rejected outright.
(c) That insertions and or correction in the percentage quoted (both in words and in figures) resulting into
increase in the value of the work shall be liable to be rejected outright unless it is authenticated by the
officer opening the tender at the time of opening tender as well as the contractors they may be present
at the time of opening tender and.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
(d) That any other correction or insertions shall be authenticated by the officer opening the tender and the
intending bidders who may be present.
23. Any error in quantity or amount in Schedule 'B' showing items of works to be carried out shall be adjusted
in accordance with the following rules:
(a) In the event of a discrepancy between description in words and figures quoted by a tenderer in the
rates column, the description in words shall prevail.
(b) In the event of an error occurring in the amount column of the Schedule 'B' showing item of works, as
a result of wrong multiplication of the unit rate and quantity, the unit rate shall be regarded as firm and
multiplication shall be amended on the basis of the rate.
(c) All errors in totalling in the amount column, and in carrying forward totals shall be corrected.
(d) Any rounding off of amounts against items of in totals shall be ignored. The tendered sum so altered
shall for the purpose of tendered be substituted for the sum original tendered and considered for
24. Battens shall be teakwood for acceptable quality and shall be varnished before fixing in position.
25. Wooden-cup board should be polished on both the sides.
26. Whenever Government materials are issued, the contractor shall be responsible for the safe custody and
proper use of the materials.
27. Loose electric fitting connection should be done at the time of handing over possession of building to the
concerned civil or administrative department and accordingly after taking over possession of these
connection concerned Civil/Administrative department is responsible for fittings.
28. (i) Late tenders (i.e. tender received after the specified time of opening) Delayed tender (i.e. tenders
received before the time of opening but after the due date time or receipt of tenders)'and post tender
offers shall not be opened and considered at all.
29. (ii) The tenders received (by registered post after the time of date specified in the tender notice) shall not
be received by the concerned office from the postman, for which date and time may be recorded on the
cover of the tender as to when tender was refused by the Divisional Accountant or the Divisional Head or
any other person in charge.
30. GST where recoverable / payable shall be deducted from bills for payment according to rules Prevailing at
the time of payment.
Pages 7 & 8 are for E-tendering of Electrical Tender Form only
DATA SHEET FOR ElectricalE-TENDERING
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
(A) Details of Tender Item :
Tender EMD in Tender
Sr. Total Security Period of
Name of Work Value in (Rs. fee
No. of Work Completion
(Rs. _______) Deposit
1 ------ As per NIT & Tender Documents ------
(B) Eligibility : Registered in ________ Class or above / Pre-qualification.
(C) Schedule of E-Tendering is fixed as under:
(i) Site Visit (If any)
From Date : __/__/____
Downloading of tender documents
(ii) Upto Date : __/__/____ Till __:__ hrs.
Start & End Date
(iii) Online submission of bid Upto Date : __/__/____ Till __:__ hrs.
(iv) Submission of EMD & Tender fee SubmissionAsinper NIT &Tender
electronic Documents
format only through online by
and other documents scanning and then the same should be sent in original to
Superintending Engineer ___________________________
Cicle_____________________ at the time of Tender Opening
or sent the same through R.P.A.D. So as to reach Executive
Engineer (Mech.), ______________________ Division
__________________ within 7 days from last date of Opening.
(v) Online Opening of Bid
90/120 Days counted from the date of opening of online
(vi) Bid Validity period
Bidders can download the tender documents free of cost from the website. www.gmb.nprocure.com
Bidders have to submit bid in Electronic format only on above mentioned website till the Date & time
Offers in physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure/ should have legally valid Digital
Certificate (Class-III) as per Information Technology Act-2000 using which they can sign electronic bids. Bidders
can procure the same from any of the license certifying Authority of India or can contract (n) code solution - a
division of GNFC Ltd., who are licensed Certifying Authority by Govt. of India.
(D) (i) Bid Inviting Authority Executive Engineer (Mech.), GMB , Gandhinagar
(ii) Bid Opening Authority Superintending Engineer(M), GMB, Gandhinagar
Percentage premium or rebate in words and figures at the
(E) Mode of Quoting Rate
end of Schedule B
The list of certifying agencies are as mentioned under :
Sr. No. Name of Certifying Agency Website Address
1. (n) Code solution (G.N.F.C.) www.gnvfc.com.
2. Safecrypt www.safescrypt.com.
3 TCS www.tcs.-ca.tcs.co.in
4. MTNL www.mtnltrustline.com
As a result of E-tendering the information / Instructions on Pages 4 to 6 following may be read as modified
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
General Conditions from Page 4 to 6 are substituted for E-tendering as below :
7. In addition to the above the bid will liable to be rejected if :-
(i) The bidder proposes any alteration in the work specified or in the time allowed for carrying out the work
or any condition in the covering letter.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the bid offer.
8. A Certificate of registration as approved contractor should be incorporated in electronically transmitted bid.
14. The tender for the work shall remain open for a period of 90 /120 days counted from the last
date of online submission of bid.
20. The rates should be expressed both in words and figures inclusive of all taxes and duties.
21. The bid will also be liable.
(i) The bidder proposes any alteration the work specified or in the time allowed for carrying out the work or
any condition or correction made in any code or mode of Schedule-B or Specifications.
(ii) The bidder or the person authorized to sign on behalf of the bidder does not digitally sign the bid offer.
31. (i) The Bids shall be offered in Electronic format only on online website www.gmb.procure.com/
www.gmbports.in till the date and time shown on Page 2 supra.
31. (ii) Payment of Tender Fee and Earnest Money Deposit : "Demand Draft for E.M.D. & Tender fee shall be
submitted in electronic format only through online (by scanning) while uploading the bid. This
submission shall mean that E.M.D. & tender fee are received for purpose of opening the bid. Accordingly
offer of those shall be opened whose E.M.D. & tender Fee is received electronically. However for the
purpose of realization of D.D. bidder shall send the D.D. in original to Superintending Engineer
_____________________ Circle _______________________ at the time of tender opening or send the
As per NIT &Tender Documents
same through R.P.A.D. So as to reach Executive Engineer (Mech.) ______________________ Division
_____________________ within 7 days from the last date of opening. Penetrative action for not
submitting D.D. in original to E.E. by bidder shall be initiated. D.D. for Exemption Certificate is not
necessary. However Exemption Certificate shall have to be submitted electronically through online. If
the contractor does not remit the tender fee & the earnest money within the specified time his
registration will be held in abeyance for one year & his tendering code will be cancelled for one year.
Any documents in supporting of tender bid shall be submitted in electronic format only through online
(by scanning etc.) & hard copy will not be accepted separately." (R&B Circular No. પરચ-૧૦૨૦૦૮-પ-સ,
dated 18-1-2008 & R.&B.D.G.R. No. Parach-102008-5-C (Part file) dated 27-11-08)
GENERAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS IN THE BUILDING AND
COMMUNICATION DEPARTMENT
GENERAL CONDITIONS OF CONTRACT
1. Definitions of terms:
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
In construing the general conditions and the annexed specification the following words shall have the
meaning here assigned to them unless there is something in the his successors and assigns.
The "GOVERNOR OF GUJARAT" shall include his successors and assigns.
The "ENGINEER" shall mean the Executive Engineer (Mech.), , for the time being attached to the Public
works Department of the Gujarat State or such other officer as may be appointed by the Executive Engineer
(Mech.), to supervise the work on behalf of the Governor of Gujarat.
The "CONTRACTOR" shall mean the Tenderer whose tender, shall be accepted by the Governor of Gujarat
and shall include the tenderer's legal personal representatives of successors and assigns.
"PLANT" shall mean and include any machine any machine fixed of movable, use for the generation or
transmission of power of actuated by power.
"WORK" or "WORKS" shall mean the whole the plant and material to be provided and work to be done
executed of carried out by the contractor under the contract.
The "CONTRACT" shall mean all the documents by which the agreement by the contractor to be provided
to execute of carry out the plant work or works shall be constituted or in or by which the terms of such
agreement or any of them are contained or set forth specially as per these General conditions, any special
conditions attached to or issued with these conditions. The specification, the Drawing, the invitation for Tenders
(if any) of any other letter. notice or document upon or with reference to which the Tender is made and the
Schedule of prices (if any) furnished by the contractor with these his Tenders.
The "SPECIFICATION" shall mean the specification annexed to these General conditions and the Schedule
thereto (if any).
The "SITE" shall mean the whole of the premises, buildings and grounds in or upon which the Plant works
or works is or are to be provided, executed, erected, done or carried out.
The "DRAWINGS" shall mean the drawings issued with the specification which will ordinarily be identified
by being signed by the Engineer and any further drawings submitted by the contractor with his tender and duly
signed by him and accepted or approved by the Engineer and all other drawings supplied or furnished by the
contractor or by the Engineer in accordance with these General conditions.
The "SPECIAL CONDITIONS" shall mean the special conditions of contractor (if any) attached to general
The "SCHEDULE" shall mean the schedule or schedule attached to the specification.
2. Contractor to inform himself fully :
The contractor shall be deemed to have carefully examined the invitation for Tender (if any) the general
and any special conditions, the specification and Drawings and the Schedule of price(in any). In case off
discordance or want of agreement between or amongst the several things herein described as the grounds or
data of the contract then these conditions shall have precedence of and be held to be more correct and binding
and in like manner detailed drawings shall be held to be more correct. and binding then general drawings and
in like manner drawing made to a large scale, or for special instruction, shall be held to be ore correct and binding
than drawing made to a smaller scale, or for general instruction and figured dimensions shall be held to be more
correct than dimensions by scale but subject nevertheless in case of doubt or dispute as to any of the matters
aforesaid to the determination and decision of Engineer as hereafter is more particularly mentioned and
provided always that nothing herein contained shall limit the powers of the Engineer herein after mentioned.
3. Security Deposit:
3.1 Security Deposit is required to be furnished by the contractor as guarantee money for performance of the
contract and observance of Contract Conditions.
3.2 The person/ persons whose tender is accepted (hereinafter called the “Contractor” which expression shall,
unless excluded by, or repugnant to the context include his Legal heirs, executors, administrators and
assignees shall pay the total amount of Security Deposit:
assignees shall pay the total amount of Security Deposit:
(a) In respect of the tender up to Rs. Thirty lacs, equal to 5 (Five) percent of the estimated cost of the work
(b) In respect of the work above thirty lacs, equal to 10 (Ten) percent of the estimated cost of the work
3.3 In respect of the tenders up to Rs.30 lacs the contractor shall pay Five percent of Security deposit in two
parts as tender:
Part-I : 2.5 percent in the from of Narmada Bond of Sardar Sarovar Narmada Nigam Ltd. or in any form of
National Small saving (N.S.S.) Schemes or Tender Documents
F.D.R. of any Schedule Bank to be paid within 10 days from the
date of receipt of Acceptance letter of his offer.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Part-II : 2.5 percent in the form of cash/ Security Deposit to be deducted from Running Bills that become
payable to the contractor from time to time.
3.4 In respect of the tenders above Rs. Thirty lacs the contractor shall pay first five percent of Security deposit
as specified in part 3.3 above and for the remaining five percent, the contractor shall have to give
Performance Bond to be produced within 10 days from the date of receipt of acceptance letter of is offer.
3.5 The work-order to commence to work shall be issued only after the security deposit as per Para 3.3 and
is paid/ furnished by the tenderer. If the tenderer fail to produce the security deposit as above the earnest
money paid by him shall be forfeited and his registration shall be held in abeyance for three years from the
date of such default
3.6 All compensation, liquidated damages or other sums or money payable by the contractor to Government
under the terms of this contract shall be deducted from or recouped by the realization of a sufficient part
of his security deposit, or from the interest arising there from or performance bond or from any sums which
may due or may become due by Government to the Contractor on any account whatsoever and whether in
respect of this contract, any other contract, or otherwise. In the event of his security deposit being reduced
by reason of any such deduction or recoupment as aforesaid, the contractor shall within ten days thereafter,
make good in cash or in Government securities transferred as aforesaid any sum or sums required to make
good the shortfall in the amount of the security deposit.
3.7 The portion of security deposit deducted at 2.5 percent from running bills as security deposit can be
converted in to interest bearing securities or F.D.R. of Schedule Bank in the Name of Executive Engineer
(Mech.) provided that the recovery of full amount of 2.5% is made and that the contractor has expressly
desired this in writing.
3.8 The full amount of Security Deposit deducted in cash from running bills will be released proportionally as
indicated in table below on production of Bank Guarantee of schedule Bank provided the contractor
produces Bank Guarantee for the period of six months beyond the stipulated period of completion of work.
Further if the time limit of contract is extended the period of Bank Guarantee shall have to be extended for
six months beyond the proposed extension of time limit and the contractor shall have to furnish the
undertaking for this alongwith the application for extension in time limit.
Table of Proportionate release of Security Deposit:
As per Tender Documents Against production of
Sr. Monetary Progress Portion of Security Deposit to be released
Bank guarantee of
Equal to the amount retained from Running
Equal to the amount to
1. 25% of Tender cost Bills or 0.625% of the estimated cost of work,
whichever is less.
Equal to the amount retained from Running
Equal to the amount to
2. 50% of Tender cost Bills or 1. 25% of the estimated cost of work,
whichever is less.
Equal to the amount retained from Running
Equal to the amount to
3. 75% of Tender cost Bills or 1.88% of the estimated cost of work,
whichever is less.
3.9 It will have to be ensured that the ten percent amount of security deposit in any form as permissible above
is kept available with the employer till the actual date of completion of work.
3.10 Fifty percentage of the Security Deposit along with performance bond shall become refundable within
fifteen days after the final completion certificate issued a per Clause-25. All dues under this contract or
other contract. or otherwise, shall be recoverd from the aforesaid amount of fifty percentage of the said
security deposite and the balance shall be refunded within fifteen days after the final certificate is issued
as per clause-25. The remaining fifty percentage of the security deposit shall be refunded after expiry of the
Defect Liability period as per clause-33 after deducting there form the amount of expenses, is any
Government under this contract.(See Performance bond below) (Modified as per R & B Circular No. TNC-
10-2013-3-(Part 1)-C dated 19-11-2013 and GR. No. TNC-10-2013-3-(Part-2)-C dated 20-11-2013)
PERFORMANCE BOND
(The date of this bond must not be prior to the date of the instrument in connection with which it is given).
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Principal (Contractor)
Sum of bond (express in words and figures)
Contract No. and date of contract
KNOW ALL MEN BY THESE PRESENTS, THAT WE, THE PRINCIPALS AND SURETY above named are held and firmly
bound up to the______________________ hereinafter called the Employer in the amount stated for payment of
which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly
and severally, firmly by these presents subject to the provisions of which the aforesaid Contractor on demand and
without demand on a claim being made by the Employer.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the principals have entered in to a contract with the
Employer numbered and dates as shown above and hereto attached for the execution of work ______________
NOWTHEREFORE, if the Principal shall well and truly perform and fulfil all the undertakings, covenants, terms,
conditions and agreements of said contact during the original terms of the said Contract and any extensions thereof
that may be granted by the Employer with or without notice to the surety and during the life or any guarantee required
under the contract and shall also well and truly perform and fulfil all the Undertakings, covenants, terms, conditions
and agreements of any all duty and unduly authorized modifications of said Contract that may hereafter be made,
notice of which modifications to the surety being hereby waived or shall pay over, make good and reimburse to the
Employer all loss and damages which the employer may sustain by reason of failure or default on the part of said
Principal so to do.
We _____________________________________ further agree that the guarantee herein Contained shall remain in
full force and effect during the period that would be taken for the validity of the said Contract, and that it shall continue
to be enforceable till all the dues of the employer under or by virtue of the Contract have been fully paid and its claims
satisfied or discharged or till the Employer certifies that the terms and conditions of the Contract have been fully and
properly carried out by the said Contractor and accordingly discharges the guarantee. Unless a demand or claim under
this guarantee is made on us in writing on or before the ____________________ we shall be discharged from all
liability under this guarantee thereafter.
IN WITNESS WHERE OF, the above bounded parties have execute this instrument under their several seals on the date
indicated above the name and corporate seal of each corporate partly being hereto affixed and these presents duly
signed by its undersigned representatives, pursuant to authority of its governing body.
In the presence of witness individual
by ______________________________ affix Corporate Seal
Attested Corporate surety
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Business address
For and on behalf of the Employer
4. Mistake in contractor's Drawings
The Contractor shall submit such drawings as may be required and shall be responsible for any
discrepancies,errors omissions in any drawings other particulars supplied by him notwithstanding that such
drawings orparticulars may been approved by Engineer.
5. Patent Rights etc.
The contractor shall fully indemnify the Governor of Gujarat against all actions, suits claims demands, costs,
charges expenses arising from or incurred by reason of any infringement or alleged infringement, of any letters
patent, design, trademark or name copyright or other protected rights in respect of any machine, plant,work
materials thing or system or method of using fixing working or arrangement used or fixed or supplied by
contractor but this indemnity shall not extend or apply to any action suit claim, demand cost charges or expenses
arising from or incurred by reason of the use of the work or any part thereof otherwise then in the manner of
for a purpose contemplated by the contract all royalties and other similar payments which may have to paid for
the use of any machine, plants, work, material thing system or method as aforesaid (whether payable in one
sum or by installment or otherwise) shall be covered by the contract price and payable by the contractor.
In the event of any claim or demand being made or action or suit brought against the Governor of Gujarat
in respect of any such matter or matters as all negotiations for the settlement of such claim or demand and such
action aforesaid the contractor shall be duly notified, thereof, and he shall conduct or suit also be conducted by
him subject if and so far as Governor of Gujarat shall think proper under the Supervision & Control of Governor
of Gujarat through the officer duly authorized on his behalf.
6. Excess over Tender quantities, Extra items & Variations in Specifications, Drawings etc.
6.1 The Engineer-in-charge shall have power to make any late rations additions in or to the original
specifications drawings design instructions that may appear to him to be necessary of advisable during the
progress of the work and contractor shall be bound to carry out the work in accordance with any
instructions in this connection which may be given to him in writing signed by the Engineer-in-charge and
such alternation shall not invalidate the contract and additional work which the contractor may be directed
to do in the manner above specified as part of the work shall be carried out by the contractor on the manner
above specified as part of the work shall be carried out by the contractor in the same conditions in all
respect on which he agreed to do the work and at the same rate as are specified in tender for the main
6.2 Except that when the quantity of any item exceeds the quantity as in the tender by more than 10% the
contractor will be paid for the quantity in excess of 10% at the rate entered in the S.O.R. of the year during
which the excess in quantity is first executed or tender rate whichever is less.
6.3 If the additional or altered work includes any class of work for which no rate is specified in these contract,
then such class of work shall be carried out.
(i) At the rate derived from the item within the contractor which is comparable to the one involving
additionalaltered class of work where there are more than one comparable items, the item of the
(ii) act which in nearest in comparison with regard to class or classes of the work involved shall be
selected and the decision of the superintending Engineer as to the nearest comparable item shall be
final and binding on the contractor.
(iii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried out at
the rate angered in the Schedule of Rates of the Division for the year in which, the tender was
received, increased or decreased by the percentage by which the tender received increased or
decreased by the percentage by which the tender amount is more or less as compared or decreased
by the percentage by which the tender amount is more or less as compared to the amount arrived at
the rates in the "Schedule of Rates" Divisions in the year in which the tender was received. If the
Schedule of rates calculated considering such items which were included in the "Schedule of Rates of
the Division for the year and or materials consumed on such item the rate to be charged would be
the basic rate taken into account for fixing the rate in S.O.R. referred to above instead of the rate.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
(iv) If it is not possible to arrive at the rate form(i) and (ii) above, such class of work shall be carried out at
the rate decided by the competent authorities on the basis of detailed rate analysis after hearing the
contractor before as committee of two superintending Engineers stationed at the same place or the
6.4 If the additional or altered work, for which no rate is entered in the "Schedule or Rates" of the Division is
ordered to be carried out before the rate is agreed upon, then the contractor shall within seven days of the
date of receipt by him of the order to carry out the work, inform the Engineer-in-charge does not agree to
this rates, he shall by notice in writing be at liberty to cancel his order to carry out such class of work and
arrange to carry it out in such manner as he may consider fit advisable, provided always that if the
contractor shall commence work or incurred any expenditure in regard thereof before the rates shall have
been determined as lastly herein before mentioned, then in such cases he shall only be entitled to be paid
in respect of the work carried out or expenditure incurred by him prior to the date of the determination of
the rate as aforesaid according to such rate or rates as shall be fixed by the Engineer-in-charge. In the
event of the dispute the decision the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and specifications
recommended by the contractor and accepted by the competent authority, the alternation above referred
to shall be within the scope of such designs drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the increase in the
cost occasioned by alternations bears to the cost of the original contract work and the certificate of the
Engineer-in-charge as to such proportion shall final and conclusive.
7. Work man ship and materials :
The works shall be carried out in all respects with workmanship and materials of the best and most
substantial and approved qualities to the entire satisfaction of the Engineer who may reject any plant, apparatus
of material or workmen ship which slab in his opinion be of defective quality any such rejection to be final and
conclusive. The contractor shall at his own expenses provide all material labour, haulage, power, tools, tackles
and apparatus necessary to execute and complete the works and plant in the manner aforesaid.
8. Use of work pending completion :
The Governor of Gujarat shall be at liberty at any time to put into beneficial use the whole or any part of
the work he may desire to use pending the formal completion and taking over of the same.
9. Subletting of contract :
The contractor shall not without the consent in writing of the Governor of Gujarat under the hand of the
Engineer assign or sublet the contract nor make any sub contract with an person or persons for the execution
of any portions of the work other than for raw materials, or for any part of the work of which the manufacturers
are named on his contract.
10. Protection and liability for a accidents, Theft and Damage :
The contractor shall at all items until the commencement of the period maintenance as provided in clause
16 property and sufficiently cover up and protect all materials delivered on site from damage or injury by
exposure to the weather and shall take every proper precaution against accident, damage or injury on the same
from any cause. The contractor shall be and remain answerable and liable for all accident and damage thereto
which until the commencement of the period of maintenance as provided for under clause 16 may arise or be
occasioned by the acts or omissions of the contractor or his workmen, agents, servants or sub-contractors
and all loses and damages arising from such accidents damage or injuries and aforesaid shall be made good in
the most complete and substantial manner by and at sole cost of the contractor and to the satisfaction of the
Provided that should the Engineer certify, that the work has been completed but that owning to
circumstances over which the contractor has no control the work cannot be taken over the contractor shall not
be held liable for any loss of or damage to the work occasioned by such delay in taking over and occurring more
than one month after date of completion of the work as certified by the Engineer.
Until the work shall be or deemed to be taken over as hereafter provided the contractor shall also indemnify to
Governor of Gujarat from and against all claims and demands, suits proceedings, cost and expenses in respect
in respect of or in connection with any injury to person or damage to property by whomsoever sustained or by
defective design work for thefts of any property of the Governor of Gujarat or of other committed by any
employees of his own or his subcontractors and shall be liable for the costs of replacing any property stolen.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
11. Insurance :
Subject as hereinafter provided the contractor shall at his own expense insure and at all times prior to the
commencement of the period of maintenance keep insured against destruction or damage by fire or earthquake
storm and tempest such plant and materials ordered for the work as may for the time being be upon the site for
the full value of such plant and materials.
12. Materials brought on the site :
All materials tools and tackle brought to and delivered upon the site for the purpose of the work shall from
the time of their being so brought vest in and be the property of the Governor of Gujarat but may be used for
the purpose of the work but for that purpose only and not on any account be removed or taken away by the
contractor or any other person without the express permission in writing of the Engineer but the contractor shall
nevertheless (subject as hereinafter provided) be solely liable and responsible for any loss or destruction thereof
or damage unless resulting from causes beyond the contractor's control not being causes insurance against
destruction or damage from which is provided for in clause 11.. The Governor of Gujarat shall have a lien on
such materials, tools and tackle for any sum which may to any time prior to the completion of the works be due
or owing to him the contractor under in respect of or by reason of the contract and shall be at liberty to sell and
dispose of any of such materials, tools and tackle remaining after the completion of the works in such manner
as he shall think fit, and to apply the proceeds in or towards the satisfaction of such sum or sums so due or owing
as aforesaid but subject to such lien and power of sale and disposal such surplus materials, tools and tackle shall
being to the contractor and may be removed and disposed of by him as he shall think fit after the lien is
withdrawn by the Engineer-in-charge.
If the contractor shall at any time fail in the opinion of the Engineer to proceed with the work with due
diligence and expedition or shall refuse, neglect or omit to comply with any orders given to him in writing by the
Engineer- in-accordance with the provisions of the conditions or shall commit any other breach of the
provision of the contract, the Engineer shall be at liberty to give notice in writing to the contractor to make good
the failure neglect. omission or breach complained of and should be contractor shall fail to comply with any such
notice within such period as may be prescribed in such period as may be prescribed in such notice then and in
such case the Governor of Gujarat shall be at liberty to employ workmen other than those of the contractor to
perform and execute the work in respect of which the failure neglect or omission referred to in such notice shall
have been committed or occurred. If the Governor of Gujarat shall think fit, it shall be lawful for him to enter
into a new contract with any other persons, or person, for the execution of such part of the work as may not
have been executed and in that event the Governor of Gujarat shall without incurring any liability to the
contractor be entitled to use all or any of the materials, tools, tackle or there things which may then be on site
for the purpose of completing the work or any part thereof and to provide any additional materials, tools, or
tackle required for the purpose and the cost of executing any such work and providing any such materials shall
be paid by the contractor to the Governor of Gujarat on demand.
Subject to and after satisfaction of the lien of the Governor of Gujarat for any sum due to him by the
Contractor for any expenses cost or charges incurred in the completion of the work, all materials , tools, tackle
or other thing remaining on the site and unsold after such completion shall forthwith hereafter be removed by
the contractor.
14. Replacement of Defective work or material :
If during the progress of the work the Engineer shall notify in writing to the contractor that in his opinion
the Contactor has executed any unsound or imperfect work, or has supplied any materials inferior in quality to
those stipulated for by the contractor, the contractor shall at his own expense, within ten days of his receiving
the notice proceed with due expedition to remove or after and reconstruct or replace the work or as the case
may be supplied fresh materials up tothe standard of the specification. In place of the work or materials
complained of by the notice (as the case may be) and in case the contractor shall fail to do so the Governor of
Gujarat may after expiration of ten days from giving of such notice give a further notice in writing stating that
the Governor of Gujarat intention so to do forthwith at the cost of the contractor remove the work or materials
complained of and perform all such work or (as the case may be) supply all such materials in place of those
complained of as may be necessary or proper in order to comply with the contractor and the cost as certified by
the Engineer of any such removed and performance of work or supply of materials shall be paid by the contractor
to the Governor of Gujarat on demand provided always that nothing in this clause shall be deeded to derive the
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Government Gujarat or effect any other rights or remedies under the contract or otherwise which he may have
in respect of such defects of deficiencies. No payment which have been made on account of materials delivered
or work executed shall be looked on as acceptance of such or any work or materials.
15. Cutting away & making good :
The tender is include all necessary cutting and making good for the purpose of the contract of the wood
work, walk, floors etc. of the site. The contractor win be held responsible for and will have to make good at his
own expanse to the satisfaction of the Engineer, any damages to or disfigurement of the site which may have
been caused the acts or omissions of himself or his servants or agents in connection with the carrying out the
16. Maintenance :
The Contractor shall make good at his own expense all defects "due to faulty design material, or
workmanship on the part of the contractor which may during a period of 12 calendar months form the date of
which the work is certified by the Engineer to have been brought into beneficial use or if no such certificate is
given from the date of the final payment for the work under clause 20 (which period is hereinafter called the
"the period of maintenance") develop under proper use in the work or any part thereof by replacing plant
materials or work or otherwise as a may be necessary. Any such making good by the contractor shall in no case
relieve him from his liability to make good any further defect in these work made good of replace which made
develop during the reminder of such period of twelve months, if any such defects are clearly caused by the fault
of the contractor and are liable to recurrence the contractor shall make such alterations as are required to
prevent any recurrence of such defects. If any defects or alterations which contractor shall become liable make
good or make under this clause be not made good or made good or make the same (as the case may be) at the
risk and expense of the Contractor, but without prejudice to any other right or remedies which the Governor of
Gujarat may have against the Contractor in respect of his default in making good or making the same as
aforesaid/and the cost of any such making good or making shall be paid by the contractor to the Government of
Gujarat on demand.
17. Contractor's Representative & workmen :
The contractor shall employ at least one competent representative, whose name or names shall have
previously been communicated in writing to the Engineer by the contractor to superintend the carrying out the
works. The said representative of if more than one shall be employed then, one of such representative shall
always be present on the site during working hours and any written orders or instruction which the
Engineer or his duly authorized representative, whose name shall have been previously communicated in writing
to the contractor, may give to the said representative of contractor shall be deemed to have been given to the
The Engineer shall be at liberty to object to any representative or person employed by the Contractor in
execution of or otherwise about the work who in the Engineers opinion, shall misconduct himself or be
incompetent or negligent and the contractor shall remove every person so objected to forthwith upon receipt
from the Engineer of notice in writing requiring him to do so.
17.A Minimum age of persons employed and employment of donkeys or other animals :
(i) The contractor shall not employ any person who is under the age 15 years.
(ii) The contractor shall not employ donkeys or other animals with breaching of string or thin rope. The
breaching must be attest three inches side and should be tape (Nawar).
(iii) No animal suffering from sores, lameness or emaciation or which is immature shall be employed on the
(iv) If contractor does not accept the proceeding condition No. (i), (ii), & (iii) his tender shall not be accepted
and his name shall be removed from the list contractors.
(v) The Engineer shall remove form the work any person or animal found working which does not satisfy
these conditions and to responsibility shall be accepted by the Governor of Gujarat for any delay caused
in the completion of the work by such removal.
17.B One percent of work done and payable in bills be recovered as contribution towards building and other
construction workers welfare cess the certificate of deduction of welfare cess shall be issued to the contractor
18. Submission of Samples :
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
The contractor shall not without written sanction of the Engineer use for the execution of the work any
materials plant or stores of any type of description other than those specified in his tender. He shall if required
to do so or at his options, deposit samples, at the Office of the Engineer for approval and the Engineer shall
within 14 days or the receipt of the samples, express in writing contract to his approval or otherwise of the
samples deposited and all materials, plant and stores used in the execution of the work, must be in
every away equal to the deposited samples. All the deposited samples will be returned to the contractor within
one month of the work being taken over.
19. Deduction from contract Price :
The amount or all cost of work, expenses; or other sums which under the contract shall be payable by the
contractor to the Governor of Gujarat from any moneys due or becoming due by him to the contractor under
contract, without-prejudice to the Governor of Gujarat right to recover the same by the ordinary process of law.
20. Terms of Payments :
Subject to any deduction which the Governor of Gujarat may be authorized to make under the contract,
the contractor shall be entitled upon the certificate of the Engineer to the effect hereinafter stated payments
of R.A. Bills shall be made to contractor as per items, in measurable units executed according to the
specifications.
It at any time the contractor shall be prevented for any period of not less than 30 days from causes within the
control of the Governor of Gujarat either first, from delivering on the site any plant or materials ready in India
for delivery or secondly from proceeding with the erection at any plant or materials which he had already
delivered on the site, the Governor of Gujarat shall bear the cost of storage and protection, including insurance
in accordance the clause ii, of the plant and materials during such period in the first of such of contractor shall
be entitled to payment of 80% of the value certified as aforesaid of the plant or materials delivery of which shall
have been so prevented within one month from the date on which as certified by the Engineer such plant or
materials are so ready as aforesaid provided that all portions thereof have been suitably and sufficiently marked
as being property of the Governor of Gujarat and are delivered into the custody of some person approved by
the Engineer who has granted a receipt thereof.
Instalments shall be due and payable by the Governor of Gujarat within one month from the date of each
certificate of the Engineer.
21. Certificate of Engineer :
Every application to the Engineer for a certificate must be accompanied by a detailed claim in duplicate
setting forth (in the order of the Schedule of price if any) particulars of the Plant or materials delivered and work
executed to the date of the claim, and the certificate as to the plant and work mentioned in the claim as is in
the opinion the Engineer in accordance with the contract shall be issued within 14 days of the application. No
application for a certificate shall be made within 14 days previous applications.
22. Certificate not to affect rights of the Governor of Gujarat of contractor :
The Engineer may be any certificate make any correction or modification in any certificate previously issued
by him any payment shall be regulated and adjusted accordingly, No certificate of the Engineer shall nor shall
any payments on accounts by the Governor of Gujarat the Contractor, nor extension of time for the execution
of the work by contractor which may be granted by or behalf of the Governor of Gujarat affect or prejudice any
of the lights, of the Governor of Gujarat against the contractor under or relieve him any of his obligations for or
in respect of the due performance of the contract, or be interpreted as approval of work done or of materials
23. Suspension of work :
The Governor of Gujarat shall any to the contractor all proper expenses arising from suspensions of the
work by order in writing of the Engineer or any other officer on behalf of the Governor of Gujarat unless such
suspension is due of some default on the part of the contractor or any subcontractor under him.
24. Damages for delay in completion :
(i) If the Contractor fails to complete the work under contract by the stipulated date, he shall pay
liquidated damages of Rs.0.1 percentage of the contract value per day from the date of delaying
the said work up to the date of completion and banding over to the Government.
(ii) However also if the contractor fails to complete and part of the work Proportionate to by the time
in relation to the value of such part, he shall pay Liquidated damages per day from the date of
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
delaying the said part of the work up to the date of completion or the said designated part at the
rates shown in the said schedule of the contract value of such part for such failure till the said
designated part is completed.
(iii) The agree gate maximum of liquidated damages payable under this clause shall not exceed Rs.
percentage of contract value per day and shall be subject to the maximum amount of ten percent
of the estimated amount put to tender.
(iv) Delays requiring payment of ten percent liquidated damages of the amount put to tender for
performance shall be sufficient cause for termination of contract and for forfeiture of security
deposit. (including amount of performance bond in forfeiture of works estimated to cost more
than Rs. 15 lacs, for performance) and registration of the contractor shall also be kept in abeyance
of three years form the date as fixed in all such cases.
24.A If the contract shall desire an extension of the time for completion of work on the ground of his having
been unavoidably hindered in it execution or on any other ground he shall apply in writing to the EIC before the
expiration of the period stipulated in the tender or before expiration of 30 days from the date on which he was
hindered as aforesaid on with the cause for making for extension occurred whichever is earlier and the EIC may
if in his opinion. There are reasonable and bona fide grounds for granting. And extensiongrant such extensions
as the thinks necessary or proper. The decision of the EIC in his matter shall be final.
No applications for extension of time for completion of work shall be considered unless it is received by
registered post in the office of the Executive Engineer (Mech.) or left at his office and obtained receipt there of
duly signed by the Executive Engineer (Mech.) or his nominee authorized in this respect.
The date of receipt of application by the Executive Engineer (Mech.), shall be considered as the date of
application for the purpose of counting the period as mentioned above.
24.B "If the contractor or his workmen or servants shall break, deface injure or destroy and part of the
building or the work in question in/or which they may be working or any building road fence, enclosure or glass-
land or cultivated round contingence to the premises on which the work or any part there is being executed or
if any damage shall be done to the work from any cause whatever before completion of the work or before the
completion of the maintenance period whichever is later or any damages occurred caused due to normal flood
or rain or if any imperfection become apparent in it within three months from the grant of a certificate of
completion, final or otherwise by the Engineer-in-charge, the contractor shall make good the same at his own
expenses or in default, the Engineer-in-charge may cause the same to be good by other contractor and deduct
expenses (of which thecertificate of the Engineer-in-charge shall be final) from any sums that may then be due
or may thereafter become due to the contractor or from his security deposit or the proceeds of sale thereof a
sufficient portion thereof".
24.C Force Major Clause :
Neither party shall be liable to the other for any loss or damage occasioned by or arising out of acts of
God such as Unprecedented flood, Volcanic eruption, earthquake or other convulsion of nature and other acts
such as but not restricted to general strike invasion, the acts of foreign countries, hostilities, or war like
operations before or after declaration of war, rebellion military or usurped power which prevent performance
of the contract and which could not have been foreseen of avoided by a prudent person.
Note: Unprecedented flood means *here flood crossing the Hi Flood Level of the past-year (s) which is on the
available record. (Modified Vide R&BD.G.R. No. TNC-1096-IB-143-(16)-C dated 11-1-99)
25. Time of taking over :
The work shall for the purpose of all the provisions of these conditions be deemed to have been completed
and taken over by the Governor of Gujarat when the Engineer, shall have certified in writing that it has been
completed in accordance with the contract conditions and such certificate shall not be unreasonable withheld
nor shall the Engineer delay its issue on account of commissions of defects which in his opinion do not affect the
efficient use of work but such issue shall be without prejudice to the contractor's liability to make good any such
omission and defects with the greatest possible expedition.
26. Death or Bankruptcy :
The if the contractor shall die or become insolvent or bankrupt or have a receiving order made against him
or compound with or make on proposal carrying on his business under inspection or for the benefit of his
creditors or commit and act of insolvency or bankruptcy, or being a corporation bordered to be wound up or
have a received of its business appointed the Governor of Gujarat shall be entitled forthwith by notice in writing
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
to the contractor his legal representative to determine the contract and the Governor of Gujarat may in that
event complete the contract in such time and manner and by such person as he shall think fit.
27. Disputes to be referred to Gujarat Public Works Disputes Arbitration Tribunal :
The disputes relating to this contract in so far as they fall within the jurisdiction of Gujarat public works
Disputes arbitration tribunal shall be referred to the said tribunal of Gujarat State.
However the reference to Arbitration Tribunal under this clause will not stay fulfilment of obligations of
the contractor or rights of the Engineer-in-charge under this contracts, unless otherwise ordered to the contrary
by the said Tribunal as Interim Relief measure.
(The following clause is to deemed included in this conditions only when Plant or Machinery is included in the
28. Contract Drawings :
The contractor shall submit to the Engineer for his approval on or before the dates stipulated for the
purpose in the specification copies of all the drawings of the general arrangements of the plant as set out therein
and of such detail drawings as may be reasonably necessary.
Within Fourteen days from the receipt, by him of such copies the Engineer shall signify his approval or
otherwiseof the same and if he does not do so he shall be doomed to have approved thereof.Within Fourteen
days from the notification by the Engineer to the contractor of his approval such copies, or in the absence of
such notification within-thirty days from the receipt of such copies, the copies in ink on tracing cloth, or Ferro
Gallic prints mounted on cloth, of ail drawings as approved shall be supplied to the engineer by the contractor
respective and shall there upon the signed by the contractor and become there property of the Governor of
Such signed copies of the drawing shall not be departed from in any way whatsoever except with the
written permission of the Engineer, during the execution of the works of the signed copies shall be always kept
available for reference on the site.
In the event of the Contractor desiring to keep in his own possession a signed copy of the drawings as
approved he shall supply three copies instead of two and in this case the Engineer shall sign the third copy and
I return the same to the Contractor.
29. Manner of Execution, Quality of materials etc. :
The plant shall be manufacture, constructed, provided, put in position and maintain in-the best and most
substantial and workmen like manner and materials of the best and approved qualities having regard to the
respective uses.
30. Test on site :
In all cases where the special conditions are provided for tests on the site where there of plant materials
on workmanship the Governor of Gujarat except where otherwise specifically stipulated shall provide free of
charge such labour materials fuel stores, apparatus and instruments as may be requisitioned from time to time
efficiently to carry out such tests in accordance with the condition.
Where electrical energy is required for tests on site and supply is available on the site form an existing
installation such electrical energy shall be supplied to the contractor by the Govt. free of charge at the pressure
and frequency of the ordinary supply is available the electrical energy necessary for such tests shall be provided
by the contractor.
31. Delivery of plants & materials :
No. plant materials shall be tendered for delivery until and intimation is writing shall have been given to
the contractor by the Engineer that Governor of Gujarat is ready to take delivery.
32. Tests on completion :
On the completion of the works on the site is accordance with the contract the contractor shall give the
Engineer notice in writing of such completion. The Engineer shall after receipt of such notice by notice in writing
under his hand for date and an hour on that date for the making of the test on site if any such are provided for
The contractor shall carry out such tests upon the date and at the hour so fixed and if the Engineer or his
authorized representative shall attend on that date at that hours such test shall be carried out in the presence
the Engineer or such representative.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
If any portion of the plant fails under the tests to satisfy the contract conditions similar tests according to
the contract of the portion so failing shall if required by the Engineer or by the Contractor be repeated within a
time to be fixed by the Engineer and the provisions of this clause shall apply to such repeat 20 test as if they
were the original tests and the contractor shall pay to the Governor of Gujarat all reasonable expenses to which
he may be put by such test.
If the test or any repeated tests so required as aforesaid be not made by the contractor on the date fixed
as aforesaid or the same by the Engineer may proceed to make such test himself at the contractor's risk and
If in any test under this clause the plant tested shall fail to satisfy the contract conditions the Governor of
Gujarat shall as from the date stipulated by the contract for completion nevertheless have the right of using
such plant until the same shall satisfy such conditions and such Use shall be at the contractor's risk. In the event
of the question whether the works have been completed in accordance with the contract or any question
regarding such completion being submitted to Arbitration as any portion of the plant the Engineer may certify
to be capable of being use on condition of paying to the contractor a sum calculated (according the period of
the use) at therate of 5 percent per annum upon the amount withheld or deducted in respect of such plant.
33. Rejection of Defective Work :
If the works, or any portion thereof shall not the opinion of the Engineer on the stipulated tests (if any)
being made is accordance with the contract satisfy the contract conditions within three months after the date
of completion the engineer may give notice in writing to the contractor setting for the particular of the defects
of particulars in respect of which the works in his opinion fail to comply with the contract conditions and
requiring the contract to make good, after or replace the same within such time to be specified in the notice as
the engineer may consider reasonable and the contractor shall make good, after or replace the same as required
by such notice and such as to make it employ with the requirements of the contract condition within the time
so specified. Should be he fail to do so within that the Governor of Gujarat may make good after of replace the
same as so required any the cost of such making alteration good or replacement (less) in case of any replacement
any such, which would have become due to the contractor under the contract in respect of the works replaced
and which shall not have been paid to him shall be paid by the contractor to the Governor of Gujarat demand
or should the Governor of Gujarat not make good after of replace any defective works in respect of which notice
as aforesaid shall be given within six weeks from the date of the given of such notice the contractor shall repay
the Governor of Gujarat all sums (in any) paid by him to the contractor in respect of such works.Nothing
contained in this clause shall prejudice or affect the rights of the Governor of Gujarat under the contractor
whether in the way of enforcement of penalties of otherwise in respect of any delay in the completion of this
34. Use of plant of works pending making good :
If at expiration of the time specified for making good, altering or replacing the plant of works in any notice
given by the engineer to the contractor under the last proceeding clause the contractor shall not have duly made
good. altered or replaced the same in accordance with the contractor the Governor of Gujarat shall be at liberty
if he thinks fit to make use of the same for such time as shall be reasonably sufficient according to the
circumstances enable him, to make good after or replace the same (whichever he may see fit to do) provided
that in respect of the period of such user, the Govt. of Gujarat shall not be entitled to any damages under clause
24 of these conditions land in the case of complete replacement the contract shall be entitled to be paid
reasonable sum for same.
35. Workmen's compensation in case of injury :
The contractor shall be responsible for any compensation and shall pay to his workmen compensation
payable for injuries under the workmen's compensation Act 1923 (VIII of 1923) hereinafter called the said Act.
If such compensation is paid by Government as principal under sub-section. (1) of section 12 of the said Act, on
behalf of the contractor. It shall be recoverable by Government from the contractor under sub section (2) of the
said section such compensation shall be recovered in the manner laid down in clause 3 and 19 of the condition
36. The Apprentices :
The contractors shall afford or procure as the case may be every facility to Indian apprentices for practical
training in the factory.
Owned managed controlled or patronized by them so as to enable the Indian apprentices to acquire full
knowledge of the technique and work of their trade industry calling or profession.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
37. Set off Clause :
Any sums of money due to the contract (including the security deposit returnable to the contractor under
this contract shall be appropriated by the Government and shall be set off against any claim of the Government
for the payment of such of a money arising out of or under any other contract made by the contract with the
Government. When no such amount for purpose of the recovery form the contract against any claim of the
Government is available such a recovery shall be made from the contractor as arrears of land revenues.
38. Appointment of Local Labourers :
The contractor should as far as possible obtain the requirement of labourers skilled and unskilled from the
nearest employment exchanges so as to utilize the local employment potential. If there are no local employment
exchange or such exchanges are not able to provide the required labourers locally. Suitable local labours should
beutilized to the maximum extent possible.
39. Fair wages :
If a contractor fails to pay within 7 (seven) days to the labours(s) worker(s) the minimum wages prescribed
by the Government under the minimum wages Act.1949 as in force from time to time the Executive Engineer
(Mech.) or the officer of an equal rank shall be at liberty to deduct the amount payable to the labourer(s) workers
form his (contractor's) bill or deposit(s) payable by the contract after making due inquiries and shall not be
entitled to any payment or compensation on account of any loss that he (contractor) may have to incur of the
action as aforesaid. Before the action as aforesaid is enforced notice in writing to the contractor shall be
issued by the Executive Engineer (Mech.) or the officer of the equal rank to pay the wages as per minimum
wages Act enforce at the relevant time. If the contractor does not act as aforesaid within seven days then the
action contemplated as above shall be taken against him.
40. License for contract labour :
Before starting the work, the contractor will have to obtain the licence from the District Assistant Labour
Commissioner under the Contract Labour (Regulation and Abolition) Act, 1970 and contract Labour (Regulation
and Abolition) Gujarat Rules 1972 after paying necessary fees and deposit on the basis of the number of
labourers to be employed on the work and will have to supply two true copies of the said licence to the Deputy
Executive Engineer before the work is started.
41. Deduction of GST from bills:
The following tax deduction shall be made from each bill payable to the contractor (1) 1% of the value of
amount payable towards SGST. (2) 1% of the value of amount payable towards CGST. TDS certificate for taxes
deducted will be issued to the contractor (F.D.G.R. No GST/1017/1097/GST Cell dated 15-09-2018)
Executive Engineer (Mech.)
Signature of contractor/s
Schedule showing (approximately) the materials to be supplied from the Public works Store for work
Contracted to be executed and the rates at which they are to be charged for
Particulars Approximate Rate at which the materials will be Place of delivery
quantity charged to the contractor
unit Rate in Rupees.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Unit Rate in Rupees
This Clause has been Deleted
Note: 1. The person or firms submitting the tender should see that the rates in the above schedule are filled up
by the Engineer-in-charge before the issue of the form prior to the submission of the tender.
Note: 2. Store to be supplied to contractors for a work free of cost should be mentioned in Schedule 'A' in
addition to schedule 'B' and the specification attached to the contract agreement form.
Executive Engineer (Mech.)
Signature of contractor/s
Memorandum showing items of works to be carried out :
(For works Estimated below Rs. 5 lakhs)
Items Item of work Estimated Rates Unit
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
No. Quantities Total amount
No. Quantities Total amount
estimated but In figures according to
may be more or Rs. Ps. estimated
less quantities
-------- As per Separate Chapter of this Tender Document ---------
I/ We am/are willing to carry out the work at…………………………………% above/below
Percent (should be written in figure and words) of the estimated rates mentioned above. Amount of my/our
tender works out as under.
Estimated Amount put to tender: Rs. - Estimated Amount put to tender: Rs. -
Deduct : _________% below Rs. Add : _________% above Rs.
Net Rs. Total Rs.
In words In words
* (Please strike out whichever is not applicable).
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
Specifications of Division or as directed.
Note 2 - All the columns is Schedule should be filled in ink and the total of the entries in the last
Column should be struck be the contractor under his signature.
Note 3 -Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4 - To be continued on additional sheets, if found necessary.
Executive Engineer (Mech.)
Signature of contractor/s
Memorandum showing items of works to be carried out :
(For works Estimated above Rs. 5 lakhs)
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Quantities Tendered Rates Total amount
Quantities Tendered Rates Total amount
Items estimated but according to
Item of work Unit
No. may be more or In figures estimated
less Rs. Ps. quantities
-------- As per Separate Chapter of this Tender Document ---------
(A) Total Tendered amount Rs…………………………………
(B) Rebate on above tendered amount (if any)……% (in figure) Rs…..……………………………..
(C) Net tendered amount (A - B) Rs…………………………………..
Note 1 - All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as directed.
Note 2 - Rates quoted include clearance of site (prior commencement of work and at its close) in
all respects and hold good for work under all conditions, site, moisture, weather etc.
Executive Engineer (Mech.)
Signature of contractor/s
SPECIFICATIONS FOR ELECTRICAL WORKS IN GOVERNMENT BUILDINGSUBJECT TO THE
GENERAL CONDITION OF CONTRACT IN FORCE (1986)
1. Wirings Rule :
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
The installation generally shall be carried out in conformity with relevant Indian standard. Specification and
code of practices prevalent, Indian Electricity Rules, 1956 and Indian Electricity Act. 1910 as amended from
2. Definition :
The definition of terms shall be in accordance with Indian standard code of Practice for Electrical wiring
installation IS-732-1982 except for the definition of point in case of internal Electrical Installation. For
definition of point wiring and measurement of Electrical works IS-5908-1970 shall be referred to.
3. Voltage and Frequency of supply :
All current consuming devices shall be suitable for frequency of 50C/s and systems of voltage meant for
unless otherwise specified.
4. Layout of wiring and its description :
(i) The wiring shall be carried out as per schedule "Power" wiring must be in screwed conduit and shall be
kept separate and distinct from lighting wiring. All wiring must be done on the distribution system with
main and branch distribution boards at convenient centers and without isolated fuses. All conductors
shall be run as far as possible along the walls and ceiling as to be easily accessible and capable of being
thoroughly inspected. The balancing ofcircuits will be arranged beforehand by the Executive Engineer
(ii) Within one month of the taking over the installation, the contractor shall supply to the Executive
Engineer (Mech.), a complete set of wiring diagrams of the same on drawings to be supplied when
available by the Executive Engineer (Mech.) and to the satisfaction of the Executive Engineer (Mech.),
D’cell. Dept. and these wiring plans shall be "Drawings" within the meaning of the term as used in the
General conditions of contract.
5. Conductors :
All conductors unless otherwise specified shall not be less than 1.5 sq. mm. for point wiring and 2.5 sq. mm
for mains conductors for power and lighting circuits shall be of adequate size to carry the designed circuit
load without exceeding the permissible thermal limits for the installation, and such sizes will be stipulated
in specifications and or drawings.
6.1 All cables shall conform to relevant Indian Standards.
6.2 Conductors of all cables except the flexible cable shall be of aluminum. The smallest aluminum conductor
for the final circuit shall have nominal cross sectional area of not less than 1.5 sq. mm. The minimum size
of the aluminum conductors for power wiring shall be 4 sq. mm.
6.3.1 Conductors of flexible cables shall be of copper the minimum cross sectional area of such a cables shall
be 14.0193 mm. the Flexible cable shall have uniform and adequate insulation.
6.3.2 Unless the flexible cables and conductors are protected by armor or though rubber of PVC Sheath, theses
shallnot be used in workshops and other places where they are liable to mechanical damage.
6.3.3 Core flexible cables shall be used for connecting single phase Appliances for phase, natural & earth
7. Fall of Potential :
The Cross sectional area of all conductors inside buildings shall be so proportioned to their lengths that the
drop in voltage between main fuses and the farthest point or any lamp shall not exceed three percent of
the voltage of the consumer's with all the consuming devices in use.
7.1 If the Cable Size is increased to avoid the voltage drop in circuit current rating of the cable shall be more
than that for which circuit is designed. In each circuit or sub circuit or sub circuit every cable shall have
current rating not less than that of the fuse which protects the circuit or sub circuits respectively for current
higher than the full load current.
8. Ratings of lamps and fans socket outlets : Points and exhaust fans
8.1 Incandescent lamps installed in residential and non-residential buildings shall be rated at 60 watts &
watts respectively.
8.2 Table fans and ceiling fans shall be rated at 60 watts, exhaust fan shall be rated according to their capacity
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
8.3 5Amp. Socket outlet points and 15Amp. Socket outlet points shall be rated at 100watts and 1000 watts
respectively for the purpose of load assessment unless actual values of the load are, know or specified.
9.1 Before the installation is commissioned following tests shall be carried out.
(1) Insulation Resistance Test.
(2) Polarity Tests of Switches
(3) Earth continuity tests
(4) Earth electrodes Resistance test.
9.2.1.1 The insulation Resistance shall be measured between earth and the whole system of conductors or any
section thereof with all fuses in place and all switches closed, and except in earthed concentric wiring all
lamps in position or both poles of installation otherwise electrically connected together. A direct current
pressure of not less than twice the working pressure provided that it need not exceed. 500 volts for
medium voltage circuits where the supply is derived from three wire D.C or a ploy phase A.C. system, the
neutral pole of which is connected to earth either direct or through added resistance, the working
pressure shall be deemed to be that which is maintained between the phase conductor and the neutral.
9.2.1.2 The insulation resistance shall also be measured between all conductors to one pole or phase conductor
of the supply and all the conductors connected to the neutral or to the order pole or phase conductors
of the supply with all lamps in position and switches in "OFF" position and its value shall be not less than
in that specified in sub-clause 9.2.1.3.
9.2.1.3 The insulation resistance in Mega-ohms measured as above shall not be less than 50 mega ohms divided
by the number if outlet or when PVC insulated cables are used for wiring 12.5 mega ohms divided by
number of outlets.
9.2.1.4 Where a whole installation is being tested a lower value than that given by the formula subject to a
minimum of 1 mega ohm is acceptable.
9.2.1.5 A preliminary and similar test may be made before lamps, etc., are installed and in this event the
insulation resistance to earth should be not less than 100 mega ohms divided by the number of outlet or
when PVC insulated cables are used for wiring 25 mega ohms divided by number of outlets.
9.2.1.6 The term "Outlet" includes every switch except that a switch combined with a socket outlet appliance or
lighting, fitting is regarded as one outlet.
9.2.1.7 Control rheostat heating and power appliance and electric sign may, if required, be dis-connected from
the circuit during the test, but in that event the insulation resistance between the case or frame work,
and all live parts of each rheostat, appliance and sign, shall be not less than that specified in the relevant
Indian Standard Specification or where there is no such specification shall be not less than half a mega
9.2.2 Polarity Test :
9.2.2.1 In a two wire installation a test shall be made to verify that all switches in every circuits have been fitted
in the same conductor throughout & such conductor shall be labelled or marked for connection to the
phase conductor or to the non-earthed conductor of the supply.
9.2.2.2 In a three wire or a four wire installation a test shall be made to verify that every non-linked single pole
switch is fitted in a conductor which is labeled or marked for connection to one of the phase conductor
9.2.2.3 The installation shall be connected to the supply for testing. The terminate of all switches shall be tested
by a testlamp one lead of which is connected to the earth. Glowing of test lamp to its full brilliance when
the switch is in on position irrespective of appliance in position or not shall indicate that the switch is
connected to the right polarity.
9.2.3 Earth Continuity Test :
The earth continuity conductor including metal conduits and metallic envelops of cables in all cases shall
be tested for electric continuity and the electrical resistance of the same along with the earthing lead but
excluding any added resistance or earth leakage circuit breaker measured form the connection with the
earth electrode to any point in the earth continuity conductor in the completed installation shall not
exceed one ohm.
9.2.3.1 Earth Electrode Resistance Test :
Earth electrode Resistance test may be carried out by magger Earth Testers containing a direct reading
ohmmeter, a hand driven generator and auxiliary electrodes.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
9.3 On completion of an electric installation (addition and alteration) a certificate shall be furnished by the
contractor countersigned by the certified Supervisor under whose direction supervision the
installation was carried out. This certificate shall be in the prescribed form as given in Appendix-B in
addition to the test certificate required by Local Electrical Supply Authorities.
10. Joint and looping back :
Unless with the sanction of Executive Engineer (Mech.), s all joints in conductor shall be means of approved
mechanical connectors in suitable and approved junction boxes but looping back system shall be
preferable.in wiring unless otherwise specified phase and live conduct shall be looped at the switch box
where a neutral conductor can be looped from light, fan or socked in non-residential buildings neutral and
earth continuity wire shall be brought to each of 'the switch boards should be of adequate size to
accommodate at least one number of 5 Amps, socket outlet and control switch in future.
Main Switchgears, Switch Board and their location :
11.1 All main switches (other hart loss of iron clad pattern) carrying current of 10 Amp. and above shall be
twitted for back connections and shall be suitably protected.
11.2 AH switches and circuit breakers shall be constructed in accordance with the I.S. 4237-1967. General
requirement for switchgear and control gear for voltage not exceeding 1000 volts and other relevant I.S.
provided also that spring shall be either of phosphor bronze or if steel shall be copper or Nickel plated
and that handle shall the so fastened that they do not tend to unscrew or become boss.
11.3 All main switches shall be either of metal cad enclosed pattern of any insulated enclosed pattern which
shall be fixed at close proximity to the point of entry of supply.
11.4 Switch boards shall not be erected above gas, stoves, sinks or within 2.5 m of any washing unit in the
washing rooms of laundries or in the bath rooms, lavatories, toilets or kitchens.
11.5 Switch boards, if unavoidably fixed in places likely to be exposed to weather, to drip or to abnormal noise
temperature the outlet casing shall be weather proof and shall be provided with glands or bushing of
adopted to receive screwed" conduit according to the manner in which cables are run PVC and double
flanged bushes shall be fitted in the holes of the switches for entry and exit of wires.
11.6 A Switch board not be installed so that its bottom is within 1.25 m above the floor unless the front of the
switch board completely enclosed by a door or the switch board is located in a position to which only
authorized persons have access.
11.7 Switch boards shall be recessed in the wall if so specified in the schedule of work or in the special
specification. The front shall be fitted with hinged panel of other suitable material such as Bakelite in
wood frame with locking arrangement, the outer surface of door being flush with the walls. Ample room
shall be provided at the back for connections and at the front between the switchgear mountings and the
11.8 Equipment’s which are on the front of a switch board shall be so arranged that inadvertently personal
contact with live parts is unlikely during the manipulation of switchgears. changing of fuses or like
11.9 No holes other than the holes by means of which the panel is fixed shall be drilled closer than 1.3 cms
from any edge of the panel.
11.10 The various live parts, unless they are effectively screened by substantial barriers of non-hydroscopic,
inflammable insulating material, shall be so spaced that space shall not be maintained between such
parts and earth.
11.11 The arrangement of gear shall be such that they shall be readily accessible and their connections to all
instruments and apparatus shall also be traceable.
11.12 In every case in which switches and fuses are fitted on the same pole, these fuses shall be so arranged
that the fuses are not alive when their respective switches are in the off position.
11.13 No fuses other than fuses in instrument circuit shall be fixed on the back of or behind a switch board
panel of frame.
11.14 All the metal switchgears and switch boards shall be painted, prior to erection with one coat of antirust
primer, After erection they shall be painted with two coats of approved enamel or aluminum paint as
required on all sides wherever accessible.
11.15 All switch boards connected to medium voltage and above shall be provided with "Danger Notice Plate"
conforming to relevant Indian Standards.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
12. Control at Point of Commencement of Supply :
12.1 There shall be a linked man switchgear with fuse on each live conductor of the supply mains at the point
of entry. The wiring throughout the installation shall be such that there is no break in the natural wire
except in the form of the linked switchgear the neutral shall also be distinctly marked. In this connections
Rule 32(2) of the Indian Electricity Rules, 1966 (See Appendix-A_ shall also be referred.
12.2 The main switchgear shall be situated as near as practicable to be termination of services line and shall
be easily accessible without the use of any external aid.
12.3 On the main switchgear, where the conductor of a two wire system or an earthlyneutral conductor of a
multi wire system or a conductor which is to be connected thereto, an indication of a permanent nature
shall be provided to identify earthly neutral conductor. In this connection Rule 32(1) of Indian Electricity
Rules, 1956 (see appendix 'A') shall be referred.
13. Switch Board & Distribution Boards :
Metal clad switch gear shall preferably be mounted on any of the following types of Board.
13.1 Hinged type Metal Board :
There shall consist of a box made of sheet metal not less than 2 mm thick and shall be provided with a
hinged cover to enable the board to swing open for examination of the wiring at the back. The joints shall
be welded. A teak wood board, thoroughly protected both inside and outside with good insulating varnish
conforming to IS : 347-1952 specification for varnish shellac for General purpose and of not less than
mm thickness shall be provided at the back for attachment of incoming and outgoing cables. There shall
be a clear distance of not less than 2.9 cm between the teak wood board and the cover, the distance
being increased for larger boards in order that on closing of the cover, the insulation of the cables in not
subjected to damage and no shoat length of cables is subjected to excessive twisting or bending in any
The board shall be security fixed to the wall by means of rag bolts, plugs or wooden Gutties and shall be
provided with a locking arrangement and an earthing stud. All wires passing through the metal board
shall be bunched. Alternatively, hinged type metal boards shall be made of sheet covering mounted on
channel or angle iron frame.
Note : Such type of boards are particularly suitable for small switch-boards for mounting metal-clad switchgear
connected to supply at low voltages.
13.2 Fixed type Metal Boards :
These shall consist of an angle or Channel of iron frame fixed on the wall or on floor and supported on
the wall at the top if necessary. There shall be a clear distance of one meter in front of the switch board.
If there are attachments of base connections at the back of the switch board Rules 51(1)c) of Indian
Electricity Rules, 1956 shall apply
NOTE : Such type of boards are particularly suitable for large switchboard for mounting large
number of switchgears or higher capacity metal clad switchgears of both.
13.3 Teak wood Boards :
For small installation connected to a single phase 230 volts supply teak wood boards may be caused as
main boards or sub-boards. These shall be of seasoned teak or other durable wood with solid back
impregnated with varnish of approved quality with all joints dovetailed.
13.4 In large size medium voltage installations, before proceeding with the actual construction of the boards,
a proper drawing showing the detailed dimensions and design including the disposition of the mounting
a which shall be symmetrically and neatly arranged for arriving at the overran dimensions shall be prepare
and approved by the engineer-in-charge.
13.5 Recessing of Boards :
Where so specified the switch boards shall be recessed in the wall. The front shall be fitted with a hinged
panel of teak wood or other suitable materials, such as Bakelite, or with unbreakable glass doors in teak
wood frame with locking arrangement, the other surface off the doors being flush with the walls, ample
room shall be provided at the back for connection and at the front between the switchgear mountings.
13.6 Arrangement of Apparatus :
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
a) Equipment which is on the front of a switch board shall be so arranged that inadvertently personal
contact with live parts is unlikely during the manipulation of switches, changing of fuses or like operation.
b) No apparatus shall project beyond any edge of panel. No fuse body shall be mounted within 2.5 cm of
any edge of the panel and no hole other than holes by means of which the panel is fixed shall be drilled
closer than 1.3 cms from any edge of the panel.
c) The various live parts unless they are effectively screened by substantial barriers of non-hydroscopic,
non-inflammable insulating material, shall be so spaced that an are cannot maintain between such parts
d) The arrangement of the gear shall be such that they shall be readily accessible and their connection to all
instruments and apparatus shall also be easily traceable.
e) In every case in which switches and fuses are fitted on the same pole, these fuses shall be so arranged
that the fuses are not alive when their respective switches are in the 'OFF' position.
f) No fuses other than fuses instrument circuit shall be fixed on the back of or behind a switchboard panel
13.7 Marking of Apparatus :
a) Where a boards is connected to voltage higher than 250 volts, all the apparatus mounted on it shall be
marked in the following colours to which the apparatus or its different terminal may have been
Alternating Current Direct Current
Three-phase-red Three wire system-2 otherwise
Yellow & blue Positive red & negative blue
Natural-black Natural-black
Where fuse-wire three phase wiring is done, the neutral shall be in one colour and the other three wires
in another colour
b) Where a board has more than one switch shall be marked to indicate which section of the installation
c) All markings required under the rule shall be clear permanent.
13.8 Main & Branch Distribution Board :
13.8.1 Main and branch distribution boards shall be any type mentioned in 13.1, 13.8.1. Main and branch
distribution boards shall be of any type mentioned in
13.8.2 Main distribution boards shall be provided with a switch or air circuit breaker on each pole of each
circuit, a fuse on the phase or live conductor and a link on the neutral or earthed conductor of each
circuit. The switches shall always be linked.
13.8.3 Branch Distribution Board :
13.8.3.1 Branch distribution boards shall be provided with a fuse of a miniature circuit breaker of both the
(adequate rating-setting chosen on the live conductor of each circuit and the earthed neutral conductor
shall be connected to a common line and be capable of being disconnected individually for testing
purposes. At least one spare circuit of the same capacity shall be provided on each branch distribution
13.8.3.2 In residential installations, lights and fans may be wired on a common circuit such sub circuit shall not
have [more than total after points of lights, fans and socket outlets/The load of such circuits shall
be restricted to 800 watts. If a separate Fan circuit is provided the number of fans in the circuit shall
not exceed ten. power sub-circuits shall be designed according to the load but in no case shall there be
more than two outlets on each sub-circuits
13.8.3.3 In industrial another similar installations requiring the use of group control of switching operation,
circuits, for (socket outlets may be kept separate from fans and lights. Normally fans and lights may be
wired on a common circuit, however, if need is felt separate circuits may be provided for the two. The
road on any low voltage sub circuit shall not (exceed 3000 Watts.) In case of new installation, all
circuits and sub-circuits shall be designed by making provision of 20 (percent increase in load due to
any future modification. Power sub-circuits shall be designed according to the load but in no case shall
there be more than four outlets in each sub-circuits
13.9 Installation of Distribution Boards :
13.9.1 The distribution fuse-boards shall be located as near as possible to the centre of the load they are
intended to control.
13.9.2 These shall be fixed on suitable stanchion or wall and shall be accessible for replacement of fuses.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
13.9.3 These shall be of either metal-clad type, or all insulated type. But if exposed to weather or damp
situations, they shall be of the weather proof type and if installed where exposed to explosive dust,
vapour or gas, they shall be of flame proof type
13.9.4 Where two or more distribution fuse boards feed low voltage these distribution boards shall be
(1) Fixed not less than 2 m apart or
(2) Arranged so that it is not possible to open two at a time, namely they are interlocked and the
metal case is marked Danger 415 volts or
(3) installed in a room or enclosure accessible to only authorized person.
13.9.5 All distribution boards shall be marked lighting, power as the case may be and also marked with the
voltage and number of phases of the supply Each shall be provided with a circuits list giving details
of each circuit which it controls and the current rating of the circuit and size of fuse element.
13.9.6 Triple pole distribution boards shall not be generally used for final circuit distribution unless
specification approval of Engineer-in-charge is obtained in special cases where use of Triple pole
distribution boards are inevitable they shall be of H.R.C. fuse type only.
13.10 Wiring and Distribution Board :
13.10.1 In wiring a branch board, total load of the consuming devices shall be divided as far as possible, evenly
between the number of ways of the boards leaving the spare circuit for future extension.
13.10.2 All connections between pieces of apparatus or between apparatus and terminalson a board shall be
neatly arranged in a definite sequence following the arrangement of the apparatus mounted thereon,
avoiding unnecessary crossing.
13.10.3 Cables shall be connected to a terminal only by soldered or welded or crimped lugs using suitable
sleeve, lugs or ferrules unless the terminal is such a form that it is possible to securely clamp them
without the cutting away of cable strands.
13.10.4 All bare conductor shall be rigidly fixed in such a manner that a clearance of at least 2.5 cms. is
maintained between conductor of opposite polarity or phase and between the conductors any
material other than insulating material.
13.10.5 If required a pilot lamp shall be fixed and connected through on independent single-pole switch and
fuse to the bus-bars of the board.
13.10.6 In a hinged type board, the incoming and outgoing cables shall be fixed at one or more points according
to the number of cables on the back of the board leaving suitable space in between cables and shall
also, if possible be fixed at the corresponding points on the switch board panel. The cables between
these points shall be arranged to form a "U" or "S" shaped loop which shall be of such length as to allow
the switchboard panel to swing through an angle of not less than
14. Capacity of Circuits :
14.1 Lights and fans may be issued on a common circuits and such a circuit shall not have more than a total of
ten points of lights, fan and socket outlets or a load of 800 watts whichever is less. The power circuits shall
be designed with a maximum of two outlets per circuits generally when load is not known or specified. In
non-residential buildings at important District centers however one outlet per circuit may be preferred.
The circuit shall be designed based on the loading of the
Circuit where not specified the load shall be taken as 1 kw per outlet, where the load is more than 1 kw it
should be controlled by a isolator switch or miniature circuit breeder.
15. Passing Through walls and floors :
15.1 Where conductors pass through walls one of the following methods shall be employed. Care shall be taken
to see that wires pass very freely through protective pipe of box and that the wires pass through in a
straight line without any twist of cross in wires, on other ends of such holes.
(a) A teak wood box extending through the whole thickness of the wall shall be buried in the wall and
casings or conductors shall be carried so as to allow 1.3 cms air space on three sides, of the casing
(b) The conductor shall be caned either in a rigid steel conduit conforming to *IS : 1653-1964 specification
for Rigid Steel conduits of Electrical wiring (Revised) or a rigid non - metallic conduit conforming to *IS
: 2509-1963 specification of Rigid Non-Metallic conduits for Electrical Installations, or in a porcelain
tube of such size which permits easy drawing in. The end of conduit shall be neatly bushed with
porcelain, wood or other approved material.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
(c) Insulated conductors while passing through floors shall be protected from mechanical injury by means
of rigid steel conduit (see *IS 1653-1964) to a height not less than 1.5 m above the floors and flush with
the ceiling below. This steel conduit shall be earthed and securely bushed.
15.2 Where a wall tube passed outside a building so as to be exposed to weather the outer end shall be belt
mounted and turned downwards and properly bushed on the open end.
16. Fixing to Walls and Ceilings :
Plugs for ordinary walls or ceilings shall be of while seasoned teak or other approved hardwood not less
than 5 cm long 2.5 c.m. square on his inner end and 2 c.m. square on the outer end. They shall be cemented
into walls to within 7.5 mm of the surface, the remaining being finished according to the nature of the
surface with plaster of lime punning.
16.1 Where owing to irregular crossing or other reasons the plugging of the walls or ceiling with wood plugs
presents difficulties, the wood casing wood pattern, metal conduit or cleat (as the case may be) shall be
attached to the wall or ceiling in an approved manner in the case of new building wherever possible teak
wood plugs shall be fixed in the walls before they are plastered.
16.2 To achieve neatness, plugging of walls or ceiling may be done by an approved type of asbestos metallic or
a fiber fixing plug.
17. Branch Switches :
Where the supply is derived from a three-wire of four-wire source, and distribution is done on the two wire
system all branch switches shall be placed in the outer or live conductor of the circuit and no single-phase
switch or use shall be inserted in the middle wire, earth or earthed natural conductor of the circuit. Single
pole switches (Other than for multiple control) Carrying not more than 15 amperes any be of tumbler type
which shall be 'ON' when the handle known is down.
Where conductors are required to be threaded through tubes or channels formed in the metal work of
fittings this must be free form sharp angles or projecting edges and such size that will enable them to be
wired with the conductors used for the final sub-circuits without removing the boarding taping or outer
covering as far as possible all tubes and channels should be of sufficient size of permit 'Looping bank' of
wires cables and flexible cords other than those designed for high temperature shall not be used for wiring
fittings except for portable fit limits. All fittings must have not less than a half inch male nipple Fittings and
lamp holders for gas filled lamps shall be adequately ventilated.
18.1 Where light fitting is supported by one or more flexible cords the maximum weight to which the twin
flexible cords may be subjected shall be as follows.
Max. Permissibleweight
crosssectionalArea cord No. & Dia. inmm of wires
18.2 No inflammable shade shall form a part of light fitting unless such shade is well protected against all risks
or fire. Celluloid shade or light fitting shall not be used under any circumstances.
18.3 Fitting of wire :
The use of fitting wire shall be restricted to the internal wiring and the lighting fittings. Where fitting wire
is used for wiring, for the sub-circuit loads shall be terminated in a ceiling zone or connector from which
they shall be carried into the fittings.
19. Lamp Holders :
Lamp holders for use on brackets and the like shall be in accordance with *IS : 1258-1967 specification for
Bayonet lamp holders and all those for use flexible pendants shall be provided with cord grips. All lamp
holders shall be provided with shade carriers. Where centre contact Edison screw lamp holders are used,
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
the outer or screw contacts shall be connected to the middle wire, the natural and the earthed conductor
of the circuit.
20. Outdoor Lamps :
External and road lamps shall have weather proof fittings of approved design so as to effectively prevent
the admission of moisture. An insulating distance piece of moisture proof materials shall be inserted in the
fittings. Flexible cord and cord grip lamp holders shall not be used where exposed to whether in veranda’s
and similar exposed situations where pendants are used, they shall be of fixed rod type
All incandescent lamps, unless otherwise required an suitable protected, shall be hinge at a height of not
less than 2.5 m above the floor level. They shall be in accordance with IS: 418: 1957 specification for
Tungsten Filament General Service electric lamps
22. Fans, Regulators and Clamps
22.1 Ceiling fans :
Ceiling fans including their suspension shall conform to *IS 374-1960 specification for electric ceiling fans
and regulators (Revised) & to the following requirements
(a) All ceiling fans shall be wired to ceiling rouses or to special connector boxes to which fans rod wires
shall be connected and suspended from books or shackles with insulators between hooks and
suspension rods. There shall be no joint in the suspension rod. but if joints be avoidable then such joints
shall be screwed to special couplers of 5 cm minimum length and both ends of pipes shall touch
together within couplers and shall in addition be secured by means of split pins alternatively the two
pipes may be welded.
(b) Fans clamps shall be of suitable design according to the nature of construction of ceiling on which these
clamps are fitted in all cases fan clamps shall be fabricated from tested new metal of suitable sizes and
they shall be as close fitting as possible Fan clamps for reinforced concrete roots shall be buried with
the casting and due care shall be taken that they shall serve the purpose. Fan clamps for wood beams
shall be of suitable flat iron fixed on two sides of the beam and according to the size and section of the
beam one or two mild steel bolts passing through the beam shall hold both flat irons together Fan
clamps for steel join shall be fabricated from tested flat iron to fit in rigidly to the bottom flange of the
beam. Care shall be taken during fabrication that the metal does not crack while hammering to shape.
Other fan clamps shall be made to suit the position, but in all cases care shall be taken to see that they
are rigid and safe.
Note: All fan clamps shall be so fabricated that fans revolve steadily.
(c) Canopies on top and bottom of suspension rod shall effectively hide suspensions and connections to
fan motors, respectively.
(d) The lead-in wire shall be of nominal cross-sectional are a not less than 1.0 sq. mm with copper and
sq. mm with aluminium and shall be protected from abrasion.
(e) Unless otherwise specified the clear distance between the ceiling fan and the floor shall be less than
22.2 Exhaust Fans :
For fixing of an exhaust fan a circular hole shall be provided in wall to suit the size of the fan which shall be
fixed by the means of rag-bolts embedded in the wall the hole shall be neatly plastered with cement and
brought to the original finish of the wall. The exhaust fan shall be connected to exhaust fan point which be
wired as neatto the hole as possible by means of a flexible cord, care being taken that the blades in the
proper direction.
23. Attachment of fittings and accessories :
23.1 In other than conduit wiring all ceiling crosses, brackets, pendants and accessories attached to watts or
ceiling shall be mounted on substantial teak wood block twice Varnished after all fixing holes are made in
them. Blocks shall be not less than 4 cms deep. Brass screws only shall be used for attaching finings and
accessories to their base blocks.
24. Interchangeability :
Similar part of all switches, lamp holder, distribution, fuse board, ceiling rouses, brackets, pendants, fans
and all other fittings of same type shall be interchangeable in each installation.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
25. Conduit Wiring System :
25.1.1 Type and size of conduit - All conduit pipes shall be conforming to *IS: 1653-1964, furnished with
galvanised or stove enamelled surface. All conduit accessories shall be of threaded type and under no
circumstances pin grip type or clamp type accessories be used. No steel conduit less than 16 mm in
diameter shall be used. The number of insulated conductors that can be drawn into rigid steel conduit
are given in Table II.
25.1.2 Bunching of cables - Unless otherwise specified, insulated conductors of AC supply and DG supply shall
be bunched in separate conduits.
25.1.3 Conduit-Joints-Conduit pipes shall be joined by means of screwed couplers and screwed accessories
Specification for Fittings for Rigid Steel Conduits for Electrical Wiring. In long distance stance straight
runs of conduit inspection type couplers at reasonable intervals shall be provided or running threads
with couplers and jam-puts (in the latter case the bare threaded portion shall be treated with anti -
corrosive preservative) shall be provided. Thread on conduit pipes in all cases shall be between 11 mm
to 27 mm long sufficient to accommodate pipes to full thread portion of couplers or accessories. Cut
ends of conduit pipes shall have no sharp edges nor any or buries left to avoid damage to the insulation
of conductors while pulling them through such pipes.
TABLE-II MAXIMUM PERMISSIBLE NUMBER OF 250-V GRADE
SINGLE CORE CABLES THAT CAN BE DRAWN INTO RIGID STEEL
(CLAUSE 6.5.1.1)
Size of cable Size of conduit (mm)
(No. of cable Max)
* For Cu. Conductors only
+ For Al Conductors only
Note-1 The cable shows the maximum capacity of capacity for the simultaneous drawing-in of cables. The table
applies to 250 volts grade able the columns heads 'S' apply to runs of conduit which have distance not exceeding
4.25 M between draw in boxes and which do not deflect from the straight by angle of more than 150. The
columns headed ‘B’ apply to runs of conduit which deflect from the straight by angle more than 15
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Note-2 In case of inspection type draw-in-box has been provided and if the cables is first drawn through one
straight conduit, then through the drawn box, and then through the second straight conduit, such systems may
be considered as that of a straight conduit even if the conduit deflects through the straight by more than 15
25.1.4 Protection against dampness - in order to minimize condensation or seat in inside the tube, all outlets
of conduit system, shall be property drained and ventilated, but in such a manner as to prevent the
entry of insects as far as possible
25.1.5 Protection of conduit against rust - The outer surface of the conduit pipes including all bends, unions,
tees junction boxes, etc., forming part of the conduit system shall be adequately protected against rust
particularly when such system is exposed to weather in all cases no bare threaded portion of conduit
pipe shall be allowed unless such bare threaded portion is treated with anti-corrosive preservative or
covered with approved plastic compound.
25.1.6 Fixing of Conduit - Conduit pipes shall be fixed by heavy gauge saddles, secured to suitable wood plugs
or any other approved plug with screws in an approved manner at an interval of not one than one meter
but on either side of coppers or bends or similar fittings, saddles shall be fixed at a distance of 30 cm.
from the centre of such fittings.
25.1.7 Bends in conduit - All necessary bends in the system including diversion shall be done bending pipes,
or by insuring suitable solid or inspection type normal bends, elbows or similar fittings or by fixing cast
iron inspection boxes whichever is more suitable. Conduit fitting shall be avoided as far as possible. On
conduit system exposed to weather, where necessary, said type fitting shaft be used. Radius of such
bends in conduit pipes shall be not less than 7.5 cm. No length of conduit shall have more than the
equivalent of four quarter bends from outlet, the bends at the outlets not being counted.
25.1.8 Outlets - All outlets for fitting switches etc., shall be boxes, of .suitable metal or any other approved
outlet boxes for other surface mounting or flush mounting system.
25.1.9 Conductors - All conductors used in conduits wirings shall preferably be stranded. No single core cable
nominal Cross - sectional area greater than 130 mm shall be enclosed In a conduit and used for
alternating current.
25.1.10 Erection and earthing of conduit - The conduit of each circuit or section shall be completed before
conductors are drawn in. The entire system of conduit and permanently” connected to earth
conforming the requirements specified under pipe in a workman like manner for a perfect continuity
between each wire and conduit. Gas or water pipes shall not be used as earth medium. If conduit pipes
are liable to mechanical damage, they shall be adequately protected.
25.2 Recessed Conduit wiring system with Rigid Steel conduits - Recessed conduit wiring system shall
comply with all the requirements for surface conduit wiring system specified in 6.5.1.1 to 6.5.1.10 and
in addition, conform to the requirements specified in 6.5.2.1 to 6.5.2.4.
25.2.1 Making of chase - The chase in the wall shall be neatly made and be of ample dimensions to permit the
conduit to be fixed in the manner desired In the case of buildings under construction chases shall be
provided in the wall, ceiling etc., at the time of their construction and shall be filled up neatly after
erection of conduit and brought to the original finish of the wall.
25.2.2 Fixing of conduit in chase - The conduit pipe shall be fixed by means of staples or by means of soft
saddles not more than 60 cm apart. Fixing of standard bends or elbows shall be avoided as far as
practicable and all curves maintained by bending the conduit pipe itself with a long radius which will
permit easy drawing in of conductors. All threaded joints of rigid steel conduit shall be treated with
some approved preservative compound to secure protection against rust.
25.2.3 Inspection boxes - Suitable inspection boxes shall be provided to permit periodical inspection and
tofacilitate removal of wires, if necessary. These shall be mounted flush with the wall Suitable
ventilating holes shall be provided in the inspection box covers.
25.2.4 Type of accessories to be used - All outlets such as switches and wall sockets, may be either of flush
mounting type of surface mounting type.
(a) Flush mounting type - All flush mounting outlets shall be of cast iron mild steel boxes with a cover of
approved insulating material or shall be a box made of a suitable’ insulating material.
The switches and other outlets shall be mounted on such boxes as would be approved. The metal box
shall be efficiently earthed with conduit by an approved means of earth attachment.
(b) Surface mounting type - If surface mounting type outlet box is specified, it shall be of any approved
insulating material and outlet mounted in an approved manner.
25.2.5 When crossing through expansion joints in buildings, the conduit sections across the joint may be
through flexible conduits of the same size as the rigid conduit.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
25.3 Conduit Wiring System with Rigid Non-Metallic Conduits:
Rigid Non-Metallic conduits are used for surface recessed and concealed conduit wiring.
25.3.1 Type and size - All non-metallic conduits used shall conform to IS: 2509-1963 and shall be used with
the corresponding accessories (See IS: 3419-1965) specification for Fittings for Rigid Non - Metallic
25.3.2 Bunching off cables - Conductors of AC supply and DC supply shall be bunched in separate conduits.
The number of insulated cables that may tie drawn into the conduits are ivory In Table III. In this table
space factor does not exceed 40 percent.
TABLE-III MAXIMUM PERMISSIBLE NUMBER OF 250 VOLTS GRADE SINGLE, CORE CABLE THAT MAY BE DRAWING
INTO RIGID NON-METALLIC CONDUITS
Size of cable Size of Conduits (mm)
sectional Diameter in
Area mm2 mm of wires
(No. of cable Max)
*For copper conductors only
+For aluminium conductors only.
25.3.3 Conduit joints - shall be joined by means of screwed or plain couplers depending on whether the
conduits are screwed or plain. Where there are long runs of straight conduit. Inspection type couplers
shall be provided at intervals. For conduit fittings and accessories reference may be made to IS : 3419-
25.3.4 Fixing of conduits - The provision of 25.1.6 shall apply except that the spacing between saddles or
supports is recommended to be 60 cms for rigid non-metallic conduits.
25.3.5 Bends in conduit - wherever necessary, bends or diversions may be achieved by bending the conduits
(See 6.5.3.9) or by employing normal bends, inspection bends, impaction boxes elbows or similar
25.3.6 Conduit fittings shall be avoided, as far as possible on outdoor system.
25.3.7 Outlets - All the outlets or fittings, switches, etc. shall be boxes of substantial construction. In Order to
mines is condensation or sweating inside inside the conduit, all outlets of conduit system shall be
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
properly drained and ventilated, but in such a manner as to prevent the entry of insects, etc. as far as
25.3.8 For use with recessed conduit wring system the provisions of 6.5.2.1 to 6.5.2.4 shall apply
25.3.9 Heat may be used to soften conduit for bending and forming joints in case of plaint conduits. As the
material soften when heated fitting of conduit in close proximity to hot surfaces should be avoided.
Caution should be exercised in the use of the conduit in locations where the ambient temperature is
50o C or above Use of such conduits in place where ambient temperature is 60o C or above is prohibited.
PVC INSULATED AND P.V.C. sheathed or T.R.S wiring SYSTEM
This system of wiring is suitable for low pressure installation and shall not be used in places exposed to sun and
rain nor in damp places. Provided they are sheathed in the special approved protective covering and well
protected to withstand dampness.
26.1 Attachment to walls and ceiling :
26.1.1 All cables on brick walls, stone or plastered walls and ceiling shall be run on well-seasoned perfectly
straight and well-seasoned, perfectly straight and well varnished on four sides, teak wood or any
approved hard wood battens not less than 10 mm finished thick, width of which shall be such as to suit
total width of cables laid on the batten, prior to election, these shall be painted with one coat of varnish
or approved paint of colour to match with surrounding. These battens shall be secured to wall and
ceilings by flat head wood screws to raw plug or Phil plug at an interval not exceeding 75 cm. Wood
plug can be used only with special approval of the Engineer in charge. The flat head wood
screws shall be counter within wood batten and smoothed down with file
26.1.2 Where wiring is to be carried out along the face of the rolled steel joints a wooden batten adequate
width shall first be laid on the same and dipped to it as inconspicuously as possible. The wiring should
then be fixed to this backing shall be suitable bushed to prevent the abrasion of the cables.
26.1.3 Attachment to false ceiling: In no case, the open wiring shall be run above the false ceiling without the
approval of Engineer-in-charge
26.2 Link dips: Only aluminum alloy clips/joint clips shall be used. The thickness shall be 0.32 mm (30 SWG) for
lengths of 25 mm to 40 mm (28 SWG) for lengths of 50 mm to 80 mm. The width shall not be less than
mm in all these cases. Link clips/joint clips shall be so arranged that one single clip shall not hold more than
two core or three single core TRS of PVC insulated and PVC sheathed up to 2.5 sq. mm above while-a single
clip shall hold a single twin core or two single core cables. The clips shall be fixed on varnished wood batten
switch iron pins and space at interval of 15 cm bet in the case of horizontal and vertical runs.
26.3 Bends in wiring: The wiring shall not in circumstances be bent so as to form and abrupt right angle but
must be rounded off at the corners to a radius not less than six times the overall diameter of the cable.
26.4 Protection of wiring from Mechanical Damage:
26.4.1 In cases where there are chances of any damage to wiring such wiring shall be drawn complying with
all the requirements of conduit wiring system.
26.4.2 Such protective covering shall in all cases be fitted on all down drops within 1.5m from the floor or from
floor level up to the switch board whichever is less.
26.5 Passing through floors: All cables taken through floor shall be enclosed in heavy gauge steel conduit
extending 1.5m above the floor or up to the switch board whichever is less and flush with the ceiling below
or by means of any approved type metallic covering. The ends of all conduits or pipes shall be neatly bushed
with porcelain wood or other approved material. The conduit pipes shall be security earthed.
26.6 Passing through walls: When conductors pass through walls, anyone of the following methods shall be
employed. Care should be taken to see that Wires pass very freely through protective pipe or box and that
wires pass through in a straight line without any twist or cross in wires on either ends of such holds.
(a) A box of teak wood or approved hard wood extended through the whole thickness of the wall shall be
buried in the wall and casings or conductors and casing or conductors shall be carried so as to allow
1.3 cm air space on the three sides of the casing or the conductor.
(b) The conductors shall be carried in. an approved heavy huge solid drawn or lap weld conduit or in a
porcelain tube of such a size that it permits easy drawing in, the end of conduit shall be neatly bushed
with porcelain, wood or other approved material. 26.6.1, Where a wall tube passed outside a building
so as to be exposed to weather, the outer end shall be mounted end turned downwards and property
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
bushed or the open end, the conduit shall be neatly arranged so that the cables enter them without
26.7 Buried cables: Tile TRS or PVC sheathed cable shall not normally be burring directly in plaster, Where so
specified in the special in the specification they may be taken in task wood channeling of ample capacity
or conduit pipe buried in the wall.
26.8 Stripping of outer covering: While cutting and stripping of the outer covering of the cable care shall be
taken that the sharp edge of the cutting instrument does not touch the inner insulation of the conductors.
The protective outer covering of the cables shall be stripped off near connecting terminal and this
protective covering shall be maintained up to the close proximity of connecting terminals as far as
practicable. Care shall be taken to avoid hammering on link clips with any metal instrument after the cables
are laid. Where junction boxes are provided they shall be made moisture proof with a plastic compound.
27. PAINTING WORK IN GENERAL:
27.1 Paints: paints, oils varnishes etc. of approved make in original to the satisfaction of the Engineer -in charge
shall only be used.
27.2 Preparation of surface: The surface shell be thoroughly cleaned and dusted before painting is started. The
proposed surface shall be inspected by Engineer-in-charge or his authorized agent and shall have received
the approval before painting is commenced.
27.3 Application: Paint shall be applied with brush. The paint shall be spread as smooth & even as possible
particular care shall be paid to rivets, nuts bolts and cover lapping before drawing cut, it shall be
continuously starred, in the smaller containers with a smooth stick while it is being applied.Each coat shall
be allowed to dry out sufficiently before a subsequent coat is applied
27.4 Scope: painting on old surface is in/door Situations will not include priercoat except where specially
mentioned in the schedule of work or special specification. However, where rust has formed on iron and
steel surfaces the spots win be painted with one anti-rust primer coat.
27.5 Precautions: All furniture fixtures, glazing floors, etc. shall be protected by covering, all stains smears,
plashing, and dropping of every kind shall be removed. While painting of wiring etc. it shall be ensured that
painting of wall ceiling etc. is not spoiled in any way.
27.6 Painting of conduit and accessories: After installation surface of conduit pipes, fittings switch and regulator
boxes, etc. shall be painted with two coats of approved enamel I paint or aluminum paint as required to
match the finish of surrounding wall, trusses, etc.
28. Link clip: The clip for batten wiring shall be of Aluminum conforming to I.S. specification No. 2415-1975.
Important Clauses of Indian Electricity Rules, 1956. Following clauses of Indian
Electricity Rule, 1956 shall in particular be taken care of in the execution of electrical works.
3. Authorisation:
29. Construction, installation, protection, operation and maintenance of electric supply lines and
31. Cut-out on consumer’s premises.
32. Identification of earthed and earthed neutral conductors and position of switches and cut outs therein.
33. Earthed terminal on consumer’s premises.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
34. Handling of electric supply lines and apparatus.
41. Distinction of circuits of different voltages.
42 Accidental charge.
43. Provisions applicable to protective, equipment.
44. Instruction for restoration of persons suffering from electric shock.
45. Precautions to be adopted by consumers, owner’s electrical contractors. Electrical workmen and
46. Periodical inspection and testing of consumer’s installation.
48. Precautions against leakage before connection
50. Supply to consumers.
51. Provisions applicable to medium high voltage installations.
58. Point of commencement of supply.
59. Precautions against failure of supply; Notice of failures.
61. Connection with earth, (low and Medium Voltage system.)
64. Use of energy at high and extra-high voltage system.
67. Connection with earth. (High & Extra-high voltage system)
68. General conditions as to transformation and control of energy.
All clauses under Chapter VIII on Overhead Lines.
137. Mode of entry.
138. Penalty for breaking seal.
139. Penalty for breach of rule
140. Penalty for breach of rule
141. Penalty for breach of rules.
Form of Completion Certificate
I/We certify that the installation detailed below has been installed by me/us and tested and that to the best
of my/our knowledge and belief, it complies with Indian Electricity Rules. 1956, as well as the C.P.W.D. General
Specification for Electrical Works,
Electrical Installation at Voltage and system of supply
(1) Particulars of works:
(a) Internal Electrical installation No. Total Load Type of system
(i) Light point
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
(iii) Plug point
(a) 3 pin 5 Amp.
(b) 3 pin 15 Amp.
(b) Others: Description HP/KW
(c) Other plants:
(d) If the work involves installation of overhead line/or underground cable:
(a) (i) Type & Description of overhead line.
(ii) Total length & No. of spans,
(iii) No. of street light & its description
(b) (i) Total length of underground cable & its size
(ii) No. of joint.
St. through joint :
(i) Description of earthing electrode
(ii) No. of earth electrodes:
(iii) Size of main earth lead:
(3) Test Results:
(a) Insulation Resistance:
(i) Insulation resistance of the whole system Megaohms.
Of conductors to earth.
(ii) Insulation resistance between the Phase conductors and neutral.
Between phase R and neutral. Mega ohms
Between phase Y and neutral Mega ohms
Between phase B and neutral Mega ohms
(iii) Insulation resistance between the phase conductors in case of poly-phase supply.
Between phase R & phase Y Mega ohms
Between phase Y & phase B Mega ohms
Between phase B & phase R Mega ohms
(b) Polarity Test:
Polarity of non-linked single pole braches switches.
(c) Earth continuity Test:
Maximum resistance between any point in the earth continuity conductor including metal conduits
& main earthing lead.
(d) Earth Electrode Resistance Presence of each electrode.
(e) Lighting protective System:
Resistance of the whole of lighting protective system to earth before any bonding is effected with
electrode and metal in/on the structure.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Executive Engineer (Mech.)
Signature of contractor/s
All Specification standard publication etc. specified mean the latest standards, publication etc.
pertaining to electrical and should conform to the following wherever applicable.
1) Indian Electricity Act. 1910 with its amendments.
2) Indian Electricity Rules 1956 and its amendments.
3) Indian Electricity supply Act
4) Regulation for Electrical Equipment in building by l.E.F. Landon.
5) The Factory Act, 1948 and its amendments.
6) I.S. 732* 1982 Part -1, II & III code of practice for Electrical wiring and fittings in buildings for low and
medium voltages
7) I.S. 4064-1976 H.D. Air break switches and fuses for-Voltages not exceeding 1100 volts.
8) I.S. 3043 - Earthing code of practice for
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
9) I.S. - 1554 Part-11970 PVC insulated (Heavy duty) Electrical Cables for working voltages upto and
including 110 volts
10) I.S. 694-1964 Part-II - PVC insulated cable with Aluminium conduits (revised) for voltages upto 110 volts.
11) I.S.: 5908 -1970 - Electrical installations in buildings method of measurements of.
12) I.S.: 4237 -1967 - General requirement for switchgear and control gear for voltage not exceeding
13) I.S.: 1653 -1964 - rigid steel conduits for electrical wiring (revised)
14) I.S.: 2509 -1973 - Rigid steel conduits for electrical installation (First revision)
15) I.S.: 1258 -1967 - Bayonet landholders (First revision)
16) I.S.: 418 -1957 - Tungsten - Filament General service-electric lamps (Third revision)
17) I.S.: 374 -1966 - Fans and Regulators, ceiling type, electric (second revision)
18) I.S.: 2667 -1964 - Filings for rigid steel conduits for electrical wiring.
19) I.S.: 3419-1976 - Fining for rigid non-metallic conduits (First revision)
20) National Electric Code,
Abstract of the Wiring Rules of the Institution of
Electrical Engineer
(Referred to in the specification)
DEFINITIONS (See clause 2 of the specification)
All electrical system in which all the conductor and apparatus are electrically connected to a common
source of supply.
1) Earthed: Effectually connected, to the general mass of the earth. Solidly earthed without the
Intervention of a fuse, switch, circuit - breaker, resistor reactor or solenoid.
2) Un-insulated Conductor: A conductor without provision, by the Interposition of a dielectric or
otherwise for its insulation from earth.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
3) Bare: Not covered with insulating material.
4) Dielectric: any material which offers high resistance to the passage of an electric current.
5) Bunch Conductor: When more than one conductor is contained within a single duct or groove or when
they are run enclosed and spaced and not spaced apart from each other;
6) Points: In wiring as per IS: 5908 -1970 - Method of measurements of electrical installation in buildings.
7) Switch board:An Assemblage pf switchgear with or without instruments, but the term does not apply
to a group of local switches in a final sub- circuit where each switch has its own insulating base.
Note: In the electricity (Factories Act) special regulations, 1908 and 1944 the term “Switchboard” includes
“Distribution board.’”
8) Single pole switch: A switch suitable for closing and or opening a circuit on one phase or pole only.
9) Linked switches: A switch the blades of which are so linked mechanically as to make break all poles
simultaneously or in a definite sequence.
10) Fuse Switch: A switch the moving part of which carries one or more fuses.
11) Three Wire System :
a) Outer Conductor: Those between which there is the greatest difference of potential. This use of
the word outer must not be confused with the use of the work when applied to the external
conductor of a concentric main.
b) Neutral Conductors: The term includes the neutral conductor of a 3 phase 4 wire system, the
conductor of a single phase or d. c. installation which is earthed by the supply undertaking (or
otherwise at the source of the supply) and the middle wire or common return conductor of a
wire d.c. or single phase a.c. system.
12) Semi enclosed machine: One in which the ventilating openings in the frame are covered with -
a) Girds expanded metal or wire gauche, with openings of less than 1/4 Inch but not less than so as
to obstruct free ventilation.
b) Wire gauge. in which the openings are less than 1/4 inch but not less than 3/32 inch (diameter or
c) Screens with smaller openings than the above.
13) Totally - enclosed Machine:
One in which the enclosing case and bearings are dust proof and which does not allow circulation of air
between the inside and outside of the case.
14) Pipe Ventilated Machine: An enclosed machine in which, the frame is so arranged that the ventilating
air may be conveyed to it through a pipe attached to the frame the ventilation opening maintained by
the fanning action produced be the machine itself.
15) Forced draught machine: An enclosed machine in which the ventilating air supply is maintained by an
independent fan external to the machine itself.
16) Protected Machine: One having end shall bearings and in which is free access to the interior without
opening doors or removing covers.
SWICHES AND CIRCUIT BREAKERS
(See clause II of Specifications)
17) Switches and Circuits Breakers:
Switches and circuit breakers (rules 2b. 36 and 37) whether fixed separately or combined with lamps,
holders of fittings, must comply with the following requirements:
(a) Overheating must not take place at the point of contract or elsewhere, when the full current flows
(b) They must be so constructed or arranged that the contracts cannot accidentally close when left
(c) The basis must be of incombustible, no conducting and moisture proof material.
(d) Circuit breaker as must be so arranged and placed that no combustible material is endangered by
(e) Unless placed an engine room or in compartment especially arranged .for the purpose, they must
their live parts covered. The covers must be incombustible material and, must be either non-
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
conducting or of rigid metal and clear of all internal mechanism. For more than 6 amperes, ai
pressures exceeding 125 volts metal covers must be lined with insulating material.
(f) In positions where they are liable to injure or come into contract with goods, they must be further
protected by an open fronted box or other suitable guard.
(g) Handles must be insulated so arranged that the hand cannot touch live metal, or be injured
through and adjacent fuse blowing.
(h) Switches having a handle protecting through an, open slot in the cover, must not be used.
Executive Engineer (Mech.)
Signature of contractor/s
GENERAL REQUIREMENTS
1.1 Scope of works:
The work covered by electrical specification consists supplying and installing, electrical wiring system
complete in strict accordance with this specification and the applicable drawing and subject to the
terms and conditions of the contract. / It includes.
(a) Conduit and wiring system for fans, lighting points bells, clocks sockets, etc. including fixing of lighting
fixtures and fans etc. and miscellaneous points.
(b) Conduit and wiring system for exhaust fans, power sockets etc.
(c) Panel boards, distribution boards, switch fuse units.
(d) Complete power and lighting cable systems.
(e) Grounding system.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
(f) Conduits system.
(g) Street lighting system.
(h) Other miscellaneous electrical work.
1.2 Completeness of Contract;
Any work fittings accessories or apparatus which may not have been specifically mentioned in the
specification but which are necessary in the equipment for efficient working of the plant should be
deemed to be included in the contract and should be executed and provided by the contractors. All
plant and apparatus should be complete in all the details, where such details, are mentioned in the
specifications or not.
Three prints and one permanent negative of each of the finally approved drawings incorporating all the
modifications proposed by the Department should be submitted. No modifications should be made in
a drawing already approved by the Engineer-in-charge without his prior consent.
Approval of the contractor’s drawing will not relieve the contractor of any part of his obligation to meet
all the requirements of .the contract.
The performance of all the equipment’s and the installation should be guaranteed at least a minimum
period of one year from the date of taking over the installation by the Department. All equipment’s
must comply with the relevancy IS-BS specifications.
1.4 Interchangeability:
All corresponding parts of similar plant and equipment should be interchangeable in every way.
All special tools required for dismantling and assembly of the equipment covered by the contract shall
be supplied as obligation under the contract.
A list of to be supplied by the Contractor should be submitted along with the tender.
Specifications for Electrical Installation in Buildings
1.1 These specifications relate to the electrical installations in the buildings of P.W.D. Electrical. The
specifications cover general requirements to be fulfilled. These general specifications are supplemented
by the specifications for the particular buildings separately attached.
1.2 These specifications are governed by the General conditions of the contract attached hereto.
1.3 APPLICABLE RULES AND REGULATIONS:
1.3.1 Installation shall be carried out IN conformity with regulations for electrical equipment’s of buildings,
published by the Institute of Electrical Engineers London (14th Edition 1966 and as amended up to date)
herein after referred to as the I. E. E. wiring regulations Where these specifications, or the special
specifications for the particular building attached hereto are at variance with the I.E.E. regulation these
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
specifications or special specifications as the case may be,shall also be followed. The installation shall
also comply with the requirements of the Indian Electricity Act, 1910 as amended up to date rules issued
there under and also the regulations for the Electrical Association of India Where not specified
otherwise, the installation should generally follow the Indian standard codes of practice and in their
absence the relevant British Standard of practices. All the materials shall comply with the relevant
Indian Standard of British Standard specifications
1.4 DEFINITIONS:
1.4.1 The definitions of terms in the I.E.E. Regulations shall apply in general.
1.5.1 The preliminary drawings only indicate the general scheme of requirement. The exact position of all
points, control switch boxes, runs of wiring and/or conduits joint boxes, inspection boxes, Mains, and
sub-distribution boards, mains etc. shall be got approved Engineer-in-charge. All circuits shall be clearly
numbered in wiring diagrams and building plans. The detailed design of a switch-board, special fixture
or any other part of the electric installation as may be called for by the engineer-in-charge shall also be
supplied by the Contractor and should be got approved by the Engineer-in-charge. Three sets of
completion drawings and wiring diagrams showing the installations as executed shall be supplied by
the contractor along with the completion certificate.
All materials shall be new and of the best quality conforming to the relevant I.S.B.S. specifications. They
must be the products of reliable manufacturers of many years or standings. All like parts of materials
shall be interchangeable. In case of equipment’s such as circuit breakers; switch fuses etc. a descriptive
and illustrated literature shall accompany the tender. The names of manufacturers’ of various materials
shall be furnished in preform in Appendix-1. Samples of materials wherever required should be
deposited with the Engineer-in-charge. All materials shall be rust-proof or rendered rust proof by
application of suitable paints. The supply of all equipments, switchgears etc. shall be complete with
accessories filings and mountings as may be required for their proper performance, and as specified in
the relevant IS-BS Code of Practice and standards.
1.7 WORKMANSHIP:
1.7.1 Good workmanship and neat finished appearance are the prerequisites for complying with the clauses
of these specifications. With a view to ensure fine workmanship the Tenderer shall employ licensed
wiremen with an experience of not less than 5 years in the type of work they are engaged. The work
should be done under supervisions of licensed Electrical Supervisors with good educational
qualifications and considerable experience.
1.7.2 Tenderer shall furnish the names of Supervisor and their wiremen, who will be engaged in this work,
with details of their experience.
1.8 CO-OPERATIVE WITH CIVIL AND OTHER WORKS CONTRACTORS:
1.8.1 The Tenderer after the award of the contract, shall co-operate with the civil and other contractors and
shall coordinate his work of the other contractors with the least amount of dislocation and interference
to the other works. Tenderer shall go through the drawings carefully and shall furnish the Engineer-in-
charge with all the details of openings in the walls etc. they may be required for concealing any of the
electrical equipments or accessories. Where the contractor fails to furnish such information as may be
required for the purpose of concealing the equipments etc. they shall be made at his (Contractor) cost
and expense. Any alteration to parts of the building shall be made good at the contractor’s expense and
brought to the original shape finish and colour.
The electrical contractor shall be completely responsible of the testing and commissioning of those
installations covered by these specifications in compliance with the standard procedure, in obtaining
permission of the Government Electrical Inspector. Any modification which is demanded by
Government Electrical Inspector shall have to be carried out within the scope of the contract. The
contractor shall submit four copies of drawings of installations as per regulations for shall be provided
by the contractor for carrying out the Installation work. All test shall be carried out in the presence of
the Engineer-in-charge or his authorized representative and his approval obtained for the test results.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
1.10 COMPLETION CERTIFICATE AND MAINTENANCE GUARANTEE:
1.10.1 After the completion of the installation and contractor should furnish a certificate in the preforma in
Appendix-III, at the time of taking over the installation by the Department. The installation shall be
guaranteed for period of 12 months from the date of taking over by the Department. During the period
of guarantee all defects in material or workmanship shall be rectified or replaced free of cost to the
1.11 TENDERER’S ABILITY :
1.11.1 In order to enable the Department to assess the ability of the Tenderer to execute the work, the
Tenderer shall furnish evidence of his experience and capacity to carry out the magnitude and nature.
1.12.1. The rates of items shall include all traces, transport, loading and unloading charge and all such charges
that may be required to be incurred for the supply and installation of materials at site. The rates shall
be firm and variations in the market are not entertained Break up figure as required in the schedule of
work shall also be furnished. As far as possible indigenous materials only shall be included for supply.
Where it is unavoidable, imported items may be included and Tenderer should dearly indicate
materials, quantity, rate and amount of these items.
1.13 STORAGE SPACE:
No covered storage space will be provided-by the Department. The contractor has to make his own
arrangement. However, the Department may give an open space near the place of execution where the
contractor can build his own stores for executing the work.
1.14 DEPARTURE FROM SPECIFICATIONS:
The Tenderer should clearly indicate departure, if any from the specifications with reasons for the same.
1.15 EXTRA ITEMS:
Rates for extra items shall generally be derived from the rates already available in the schedule. Where
it is not possible, the rates shall be mutually agreed upon and contractor shall furnish a detailed analysis
of the rates claimed by him.
2. TECHNICAL SPECIFICATION:
2.1 Supply System:
The wiring installation shall be suitable for 3 phase 4 wire, 400-440 V 50 cycles system of supply Colour
code of different phase shall be followed as per standard.
2.2 Wiring for Light and Fans:
Looping system to wiring shall be adopted. No joints shall be made at intermediate runs of cables and
where they are unavoidable such joints shall be through approved mechanical connections.
2.2.1 Point wiring:
Point wiring shall consist to the branch wiring from the board together with the controlling switch or
push as far as and including the ceiling rose or any other approved connector or socket, outlets. In case
of more than one light being controlled by one switch, the wiring up to the ceiling rose of the first light
including the switch shall be considered as a Primary point. Loop wiring from light shall be considered
as a’ Secondary’ point and rates shall be quoted separately, including final connections to fixtures and
2.2.2 Conductors:
No conductor for final sub circuit wiring for light and socket outlets shall across-section less than that
of 2.5 sq.m (aluminium)
No final sub-circuit radiating from the fuse board of a sub-distribution board and wires with 25 sq. m.
(AI) cable shall carry more than 10 lights, fans or socket outlets or a connected load of 800 watts
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
whichever is greater. The following wattages may be assumed for estimating the load on each sub-
circuit unless otherwise known or specified.
Incandescent lamps 100 watts
Ceiling fans 60 watts
5-A Socket Outlets (lighting) 100 watts
4. ft. fluorescent tube 50 watts
5. ft. fluorescent tubes 100 watts
In each sub-distribution board at least-one way preferably two ways shall be left spare for future
requirement. A wiring diagram giving the exact Utilization of the ways shall be prepared and fixed in
the sub-distribution board itself or any other easily accessible place. The ways of sub distribution boards
shall be accordingly numbered.
2.2.4 Local Control Switches (General) :
Local control switches for circuit carrying net less than 5-5 shall be piano type and shall conform to
relevant I.S. Standards. The switch shall be ”ON’ when the knob is in the down position. All local control
switches shall be connected in the phase or live conductor only and not in the neutral conductor,
switches shall be fixed in iron clad box and shall is so placed that the Centre of the switch box is 1.3 Mtr.
from the finished floor level unless otherwise
stated. All switch boxes shall be provided with 1 /8" thick Perspex cover fixed to the switch box with
chromium plated counter sunk screws (brass).
2.2.5A Switches (Two Way) :
a) Two way swatches shall be piano type single pole, double throw, 250V, suitable for flush mounting
and of 5A capacity as per the drawings. All switches shall be recessed in an embedded metal box.
b) Each box shall have suitable outlet for fixing conduits directly.
c) Each box shall have Perspex cover painted inside with the wall color, if required.
d) Each switch shall have suitable for the position in a corridor stairway wiring.
2.2.5.B Switch Boxes (General)
Electrical circuits shall be written suitable on the cover of all switched boxes, as approved by the
Engineer-in charge (elect) whenever different phase are terminated in a switch box Bakelite partition
shall be provided. Each cash shall be provided with a G.I. Earth stud nut and washers for earth
2.2.5 Ceiling Rose:
Ceiling rose shall be used on circuits having a normally exceeding 200V. Only one flexible cord shall be
attached to a ceiling rose. Only 3-pin 5A socket outlet shall be provided in lighting circuits. All socket
outlets be provided with a control switch and they shall be mounted in switch boxes in an approved
2.2.6 Fittings:
These shall be of approved type as specified in the tender schedule. The sub circuits leads should
terminate in a ceiling rose or conductor in the fitting and internal connection made there from.
Wherever these fitting are suspended they shall be done so through the conduits and ball and socket
joint. All fittings shall be grounded by a G.I. conductor not less than 16 S.W.G.
2.2.7 Flexible wiring:
Flexible cords of not less than .23/0076 size be shall be used, The weight of suspension road shall be
governed by I.E.F. Regulations.
2.2.8 Ceiling Fans:
All ceiling fans shall be wired to ceiling rose and suspended from a hook shackle or clamp and insulated
from the same. All joints in the suspension, road shall be screwed and means of split pins. The fan
clamps supplied by the Contractor shall be suitable for the ceiling or proof member as the case may be
For concrete roofs, fan hooks shall be buried in concrete during concrete during construction in an
approved manner and secure bound to the reinforcement.
2.2.9 Conduits and Earthing:
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
All conduits feeding lighting and circuits shall be provided with earth continuity G.I. conductor as
specified for power wiring. All conduits shall be as specified for power wiring.
2.3.1 Point wiring:
Point wiring power shall be as defined under section 2.2.2 and shall include the switches and sockets.
All distribution board for power wiring shall be not less than 15 A per way. Loading per way shall not
exceed normally 100 watts. The following loads may be assumed if exact figure are not known.
3-Pin 15A Outlets 1.000 Watts
3-Pin 5A Outlets 100 Watts
2.3.3 Wiring for Motors :
2.3.3.1 Final sub-circuits loop in motors shall be connected to separate ways of the Distribution board even if
the current in the sub-circuit is less than 15A. No looping is permissible.
2.3.3.2 All wiring shall be carried in H.G. conduit as specified in I.S. specification for gauge for different sizes of
conduit. When the motor is resiliently mounted fixable with approved adopters shall be used for the
last few feet. Where cables are used sufficient loop shall be left.
2.3.3.3 All switch fuse units controlling circuits feeding motor .shall be provided with H.R.C. fuses or as
2.3.3.4 The frame of every motor and its association contra gear shall be earthed by two separate and distinct
connections to earth connector shall be capable of earring 3 times the rating of fuse or 1.1/2 time the
setting or the circuit breakers but in no case than NO.8 S.W.G. or 7064" or equivalent cross section of
copper. Where practicable, the earth connections shall be visible for periodical inspection. Gas or water
pipes shall not be used for earth connections.
2.3.3.5 Socket Outlets and Control Switches f A and 15A :
All socket outlets shall be of 3 pin type, the third pin being connected to the earth stud of nearest
distribution board by separate earthing wire: The socket shall conform to I.S.: 1293/1938,’single pole,
piano type. Each socket pubets shall be provided with a control switch of appropriate rating and as
specified. The switch and socket shall be mounted inside the iron clad box provided with 1/8” Perspex
cover as directed by the Engineer-in-charge or as specified in schedule of quantities. Inside switch box
ample space shall be available around switches for connection wires to switches. All socket outlets for
power shall be mounted at the skirting level otherwise specified or as directed by the Engineer-in-
The three phase plug receptacles shall have their earth terminals connected by independent earth wires
to ring main strip on the building. In buildings where explosion proof fixtures are installed single phase
plug receptacles as well as light points shall be connected to ring main ground bus installed in the
building by separate earth wires of approved size.
Socket outlet shall have some provision not to receive the matching plug unless the grounding pin is in
correct position. The grounding pin of the plug shall make the contract first and break the contract last
at the time of inserting or removing the plug respectively.
The grounding terminal shall be connected to the enclosed metal body providing G.I.Stud, nut washers
welded to the box.
Each unit shall be suitable for flush mounting as required and indicated in the applicable drawings.
Combination unit socket outlet and switch shall be complete with necessary internal wiring. The
switch/socket shall be mounted on M.S. bracket enclosed in a box.
2.4 Conduit Wiring:
2.4.1 Where conduit wiring is adopted type and size of the conduit shall be as indicated in the drawing. The
minimum of the conduit shall be 19 mm.
2.4.2 The contractor shall thoroughly study the structural arrangement of the buildings and wherever,
necessary shell in consolation with Department’s representatives at site, make suitable adjustments in
the cable routings, earthing arrangements, and location boxes, fitting etc. with a view to avoid
interference with any part of the building, structure, equipment or any other work in the building or to
effect any improvement in the arrangement.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
2.4.3 Protection of conduit against rust:
Conduit shall be given two coats of oxide paint before they are placed in position. All exposed conduit
shall be planed after installation with the colour as approved by the Engineer-in-charge. This do not
apply to galvanized conduit.
2.4.3.A.Protection against insects arid damp:
In Order to minimize concentration or sweating inside the conduit, system shall be properly drained
any ventilated in such a manner as to prevent the entry of insects.
2.4.4 Conduit shall first be installed as a complete system without cables and shall be continuous from outlet
to outlet from fitting to fitting and mechanically and electrically connected to all boxes and fittings.
2.5 SPECIFICATION FOR POWER CONTROL AND TELEPHONE CABLES:
i. The specifications cover the supply and medium voltagePower and control cables either in ground
or trench depending on the conditions at sate including accessories for the same. The work in
general, consists of supplying, laying jointing terminating and connecting at. 1.1. KV APLSTS PVC
power and control cables.
ii. The contractor shall supply all accessories including jointing and terminating materials, compound,
tapes supporting materials, cleats cables lugs, concrete stable, bricks sand, cable-markers etc. as
required to make the installation work including digging and filling of the trenches as required.
2. SPECIFICATION:
i. All power cables to be supplied mentioned as ‘APLSTS’ in the Schedule should be mass
impregnated, non-draining, paper insulated lead sheathed, double steel tape armoured and must
comply with the latest IS1BS specifications.
ii. All cabling materials such as cable compound, cable lugs, taped shall be of approved quality
acceptable to the type recommended by the manufacture of the cable for which it is used and
approved by the Department.
iii. installation of all equipment shall also conform to the applicable. Codes and practice as per the IS
and shall be executed to comply with the latest Indian Electricity rules as regards the safely, payable
of equipments and other essential provisions specified therein.
iv. Only approved make of cable shall be used. ICC and CCI will be preferred,
v. The cables shall generally be laid as per is Code of practice.
3. GENERAL RULES CABLE LAYING:
i. Installation shall be carried out in a neat workmen like manner by skilled experienced and
competent workmen in accordance with the standard practices.
ii. Cables shall be laid preferably in one length to avoid joins. If straight joints are found-necessary,
these can be introduced with prior approval of the Engineer-in-charge. The cost of the straight joint
however, shall not be borne by the Department. But in no case joint shall be within the conduit G.I.
iii. Proper care should be exercised in handling the cable to avoid formation of kind etc. and should it
become necessary a cable be bent to a radius not less than 20 times the overall diameter of the
iv. Method of installation, routing of cable etc. shall in every case be subject to the Department’s
approval and the contractors shall modify and or certificate no extra cost to the Department’s any
portions of the installation which do not meet with the Department’s approval. All damages to the
civil and other works on this account shall be made good by the contractor at no extra cost to the
The electrical contractor while notifying the building contractor for such work shall furnish the
proper draws, dully explaining the work involved of indicate at suit actual work to be carried out
as may be required by the building contractor. The electrical of any such work as the electrical work
with this to the same has been completed.
v. Where cables pass through huge pipes, contractor shall fix hard wood bushed round the cables at
the ends of huge pipes. Where the cables pass through the floors or chambers and in such
situation’s the Engineer shall require, the contractor shall seal cable holes in a manner approved
by Engineer-in-charge. Where cable pass through roads nallahs etc. cables must be protected by
class ‘A’ Hume pipe of diameters not less than 6”. (15cms).
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
vi. The cable routs shall be the shortest and these shall be minimum inference with built up areas,
vii. Care shall be exercised for providing suitable props other service lines on earth at the time of
excavation. Where cutting of a lawn inevitable it should be with the approval of the Engineers-in-
viii. Excavation of the trenches shall be executed with vertical sides and the trenches shall be kept as
straight as possible. The exact location of each trench shall be settled by the Engineer-in-charge.
On the site when the contract is in a position to commence each portion of the work.
The trench shall be not less than 1/2 meter wide and 90 cms deep. If more, cables are to be laid
the width should be suitably increased.
ix. After the cables are laid, the trench shall be filled in layers, the each layer being weal rammed by
spraying water and consolidated and sufficient alliance made for settlement. The extra earth over
the trench should be removed from the place of trench to a place as decided by the Engineer-in-
charge at site.
x. Ends of cables shall be property sealed to prevent entry of moisture prior to installation.
xi. Where it is as specified as 1/2 core cables the 1/2 core shall be a neutral conductor having reduced
xii. For all multi core cables each core and tails shall be brought not, marked and or coloured in on
approved manner.
xiii. Cables termination shall be done with suitable compression brass glands in the case of PVC cables
and cast iron trifurcating boxes in the case of APLSTS cables. The Armour should be connected to
the right main earth building with duplicate earth wires as per the relevant IS/BS specification.
The core insulation over each conductor shall however be retained throughout the run of the
conductor up to the end where lung shall be fitted thereon for connections. The lungs shall by
fitted by means of approved solder and flux such as a leap and Eyre NO.7 liberally used. The joint
shall be mechanically strong and pressure tested.
2.6 DISTRIBUTION BOARDS AND PANELS.
General Requirements :
2.6.1 All distribution panels shall comply with IEE. Rules 60-61. A clear distance of 0.91 b meter in front of
the switch board shall be kept. Where bare connections of attachment are provided at the back of the
switch board the space behind the panel shall either less than 0.299 meter or more than 0.762 main
width there shall be a passage way from the furthest outstanding part of any attachment or conductor.
If the space behind the switch board exceeds 0.70 main width there shall be a passage way from either
end of the switch board clear to night of 1.928m width 0.299 m. All wiring connection shall be made
neatly and securely.
2.6.2 For crocoite’s carrying more than 10 Amps, tinned cable sockets shall be used, all connections shall be
so made as to form their own diagram Circuit shall be clearly numbered to correspond-to wiring
diagram. Names of the distribution boards shall be painted as directed by the Engineer-in-charge. All
the switch fuse units and isolators D.Bs. shall be complete with earthing studs lugs neutral bar ink. H.R.C.
fuses and of approved make.
2.6.3 Skeleton type panels shall have rigid form work adequately braced and supported. The switch and
distribution boards shall be neatly arranged in the frame. The details of the frame work and the
arrangement of switches shall be got approved by the Engineer-in-charge before the panel is fabricated.
2.6.4 All cubical type panels shall have rigid supporting frames adequately braced over which sheet metal
shall be nearly secured. All switches distribution boards etc. shall be neatly arranged on the panels and
all connections made from the back of switches. The panels shall be rendered dust and vermin-proof.
The interior of the panels shall not be accessible to unauthorized persons.
2.6.5 The recess type boards shall .be embedding wall in –a cupboard with a metal hinged door with locking
arrangement. In all recessed conduit work all distribution boards shall be recessed. Where recessing is
not possible, free standing panel may be provided as approved by the Engineer-in-charge.
2.6.6 All individual components i.e. switch fuse units D.Bs. etc. shall be connected by earth connected by
earth continuity wire of appropriate size with the main earth bus of the D.B.etc.The panel switches of
D.Bs. shall be earthed by the less than 2 distinctive paths to earth. Earthing of metallic parts of exposed
metal shall not be effected through any structural metal work which houses the installation. Where
metallic parts are not required to be earthed and are liable to become alive should the installation of
the contractor become defective such metallic parts shall be separated by durable non conducting
malarial from any structural work.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
(a) Power panels shall be 3 phase, 4 wire, 400.230 volts for the distribution of 3 phase or single phase
power loads. Lighting panels shall be 3 phase 4 wire 400/230 volts for single phase lighting load
distribution on all 3 phase.
(b) All panels shall be done of protected front type with no mechanical or electrical defects.
(c) Bus bars shall be of electrolytic copper or aluminium as specified and the properly tinned sizes as
indicated on applicable drawings as required.
(d) All knock outs for branch circuits entries shall be drilled and filled as required, for lighting panels the
top and bottom cover plates shall be. removable type.
(e) Main disconnect device for all panel boards shall be of switches of disconnect type and of the size as
indicated shall be mounted directly below the panel or through a short thread conduit of required size.
(f) The main disconnect for all panel boards shall have an entry suitable for PVC armoured cable from
(g) All panel boards shall be provided with an earthing terminal and lug for connection to the grounding
(h) Temperature rise of all electrical parts shall not be more than 300c With full load amperes at room
(i) Buses shall be securely supported so that ordinary vibration will not cause any of the parts to become
(j) All barriers and supports of current carrying parts shall be of moisture resistant insulating material and
shall not be adversely affected by arcing.
(k) The locations of panels shown in the drawings are only tentative; panels may be located at a place
approved by the Engineer-in-charge.
(l) All civil works connected, with fixing such as grouting chasing and making good shall be the Tenderer
responsibility.
(m) Wires adequate capacity with proper size of lugs shall be used for inter connections.
(n) Panel should be self-supported on angle channel iron frame work. It should be preferably of bolted
construction in case of transportation and flexibility. The frames shall be of the required size for the
mounting of the equipment on it. It shall be bolted or grated rigidly after levelling and alignment.
(o) The cupboard and D. B. should be of such size so to be accommodated in the existing room as per I.S.
rules and I.S. codes of practice for installations of Medium voltage switchgear.
(p) Fabrication drawing showing the detailed dimensions and panels and its components indicating the
frame work, earthing positioning of switches. D.Bs. cable boxes, adopter chambers etc. shall be
furnished to the Engineer-in-charge for his approval. All material to be got approved by the Engineer-
in-charge. Panel should be guaranteed for satisfactory operations for a period of one year after handing
(q) The panel should be painted with anticorrosive paint suitable for humid and salty atmosphere on two
coast to primer.
SWITCH GEARS, POWERS PANELS D.B. AND S.F. U.S.
2.6.8 The main bus bar shall have continuous current rating as specified with neutral bar having half of full
load rating of the phase bus bar. The size of the bus bars shall be so selected that the current density in
bar does not exceed 150 amps. Per sq. m. for copper. The length of bus-bar chamber should be as
suitable length to fix all the switches etc. as per the prevailing standards, clear spacing of two adjacent
buses shall be 1 1/2" minimum bar should be taped all along with color coated 11KV grade PVC tape.
The maximum internal of support for each unsupported length shall exceed 600mm.
The bus bar shall be air insulated extensible type rectangular one. The bus bars chamber shall be dust
tight by providing gaskets secured property so as to tender it verity proof.
The combination fuse switch unit should comply with IS 4064 BS 861 and BBS 2510 wherever applicable.
It should be suitable to accommodate High Rupturing capacity cartridge Fuse links complying with IS
2208 or BS 88 and having a certified rupturing capacity of not less than’ 35 MVA at 440 volts (AC5 duly).
The switch gear (pans D, Bs. etc. shall be installed generally as per is-Part -1 3072 and as specified and
shown in drawings.
All fuse switch units shall be provided with, non-deteriorating HRC fuse links complying with IS 2208-
1962 and having rupturing capacity of 35 MVA at 415 volts or as specified.
All switches above 60 amps, rating shall be provided with suitable size adapted boxes. All switches
mounted-on the top of the bus bars shall be provided with detachable type reverse entry adapter boxes.
Suitably engraved tables shall be provided for each circuits as well as for the board.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
A meters sector switches and LMH meter shall be provided where. specifically mentioned. Small wiring
for the inter-connecting shall be colour coded and provided with numbered fuses for easy identification
(a) The distribution boards should be totally enclosed metal clad complying with B. S. 214. the M. S.
sheet steel enclosures for recessed D. Bs. shall be of not less than 14 gauge.
(b) The D. B. shall be with hinged door and the locking arrangements as approved by the Engineer-in-
(c) All the components shall be enclosed in the enclosure. The mounting of D. B. shall be got approved
by the Engineer-in-charge before carrying out the installation.
(d) The D. Bs shall have proper side-cut outs for conduits entry or cable entry as required and these
shall be made on site
(e) Adequate spacing shall be provided inside the D Bs. for easy removal of the fuses and carry out
the interconnection.
(f) A set of insulating barriers have to be provided between incoming breakers switches and fuses.
Switch fuse Units:
(a) All the D.P.T.P. and T. PN. Switch fuse units shall be totally enclosed iron a clad quick make, quick
break type to best Indian make conforming to the I.S. or S. 3185 specifications. All the switch fuse
units shall have mechanical Interlock with a door so that the door so that the door cannot be
opened when the swatches are in ON position. The switch should be of double break solution type
to ensure safely.
(b) Each T.P & T.PN switch fuse unit shall be earthed with two distinct each connections.
(c) Suitable insulator shall be provided between phase.
(d) There shall be suitable natural link in the fuse box.
(e) All T.P and T.PN: switch fuse units snail be rated for 500 volts and D.P, (required for single phase
supply) and S.PN. switches for 250 volts.
(f) The H.R.C. cat ridge fuse shall conform to H.S. 88 (1952).
The O.C.Bs. ACSB shall be suitable for 400/440 volts 3 phase 50 cycle supply capable of interrupting
a fault MVA of not less than 31. The circuit breaker shall conform to the BSS-936 1940. BSS
with such tripping arrangement as many as required under special specification is for the building.
Efficient and fool - proof mechanical interlocking shall be provided for the safe operation and
maintenance. The rate be inclusive of the first filling of oil.
2.7 Instrumentation:
Tile instruments and meters wherever necessary shall be housed in special sheet steel box located
between switch fuses units and bus bar chambers. The instruments etc. shall be mounted on the hinged
cover with heir dial flushed. All instruments shall have protective H. R.C. fuse links. All interconnections
and small wiring shall be neatly dressed arranged and duly colored 10r easy identification of circuits.
Meters shall be provided as required in the Schedule, Meters shall be dead head and be suitable for
400/ 440 volt 3 phase 4 wire 50 cycle (in balanced load) supply.
Each selector switch shall be 3 point and of minimum 250 volts grade with silver tipped contact suitable
for metering circuits, current transformers shall be of 5VA burden and commercial metering accuracy.
Indication lamps shall be penal mounting type preferably of 250V grade. Every unit shall be prewired
and interconnected to the system for its required indicating performance. Indicating lamps shall have
independent circuit fuse.
2.8 FIXING OF LIGHTING FIXTURES:
1. Location of fixtures their manner of fixing mounting height etc. are indicated in relevant drawing.
Actual location and levels shall however be arrived at site in co-ordination with other service etc.
and prior approval of the Engineer-in-charge regarding the actual location Manner of fixing shall be
obtained before the work is taken up in hand.
2. In all cases the contractor shall provide necessary interconnection wiring earthing painting etc. all
necessary for complete installation. The contractor shall also test and commission the fixtures
during completion of the work.
3. General arrangement of fixtures layout is indicated in drawings. Care shall be taken to see that all
light fixtures are in a row in a room or particular area, are in absolute line and plump and are
symmetrically disposed with respect to finished surfaces of walls, columns beams etc.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
4. The inter-connections wiring from the light outlet point up to the fixture shall be carried out by
means of flexible copper wire of section not less than 1.5 mm2.
5. All fixtures suspended by means of conduits shall be done with all and socket joints or as per
approved design.
2.9 Telephone system:
1. Empty conducing shall be done recessed or exposed to surface along with pulls boxes, junction
boxes and telephone outlet boxes, in areas. and location as indicated in the relevant drawing as
per materials and methods as described in regard to conducting under section "Wiring in conduits”
except the G.I. pull wires of gauge not less than 20 SWG shall be dept. pulled through conduits in
all sections so that in future telephone wires can be pullet easy.
2. Location shown on the drawing are proximate and final location shall be decided in the field by the
Engineer-in - charge.
SPECIFICATION FOR EARTHING & Installation of Earthing Plates:
All installation of earthing shall conform to Indian Electricity Rules, IS - 3043 latest edition and I.E.E. the
copper earth plates should be tinned before installation. the earth plates of copper 60 cm x 60 cm x
mm thick size as mentioned in the schedule be in separate pits at least 150 cms to 300 cms. away from the
building at a depth necessary to reach moist earth surface but with a minimum depth of 2.5 Mtr from the
finished ground Level up to the top vertical dodge of earth electrode. The earth plate shall be thoroughly
cleaned to remove all dirt from the surface and be tinned property for electrical contact with the main
ground. Each earth pit should be provided with 38 mm. dia . G.!. pipe 2.5 Mtr .long or more depending up
to the depth of pit, put over the vertical edge of earth plate (with top end of pipe provided with a closed
to couyler.) Alternative layers of salt and coke shall be provided surrounding the plate. The pits shall be
filled when the plates are in position and with the approval of Engineer-in-charge.
To facilitate watering the pit, a concrete compartment should be made-with funnel with mesh and cover
plate as per rules provide in ISI regulation. The masonry endorser’s shall be 25 cm x 25cm x 25 cm (deep)
with C.I, lid of 23 cm x 30 cm x30 cms. size. After installation, the earthing resistance of each earth plate
should be measured by resistance meggar in the presence of Engineer-in-charge, three days after the
completion of earthing work, and the value should conform to regulations.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Executive Engineer (Mech.)
Signature of contractor/s
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
LIST OF THE APPROVED PRODUCTS, R &B SOR 2013-2014
CHAPTER – I 2.GELCO (Refer to Ch 1.1 (B)-Cat III (6))
WIRING 3. POINTER - SPECTRA (Refer to Ch 1.1(B) Cat.III- (3)
1.1 SHOCKPROOFACCESSORIES 4. ELLYS
(A) Concealed / Surface Type M/s ELLE Electrical PL. ,Cama Industrial Area, Walbhat Road.
Any I.S.I.' marked Which is Approved by Department Next to Rajaram Tarphe, Goregaon (E), Mumbai -
CATEGORY - I 5.HI-Fl
1. ALLWYN - APPROVED M/s Aerotite Industries ,5, Sati Industrial Estate,
M/s Allwyn Electricais Industire, 78, Kakad Industrial Estate, I.S. Road, Goregaon (E), Mumbai -
Lady Jamshedji Road,Mahim - Mumbai - 400016 6.WONDER [EVER / PLAYBOY/COOLICY/FORTUNE/DASH/GOLD]
2. SAFECON'S M/s Wonder Industries, G-14, O.I D.C. Udhyog
M/s KALA ELECTRICAL INDUSTRIES, 12/A, Eagal Market, 90 Nagar Industrial Estate, GIDC, RinganwadaDAMAN (U.T)
Feet Road, Saki Naka, Mumbai - 400072 7.ALLWYN (Refer to Ch.1.1l(A) Cat 1 (1))
3. MILLION & MILLTEC 8.INDOASIAN
M/s Mutha Electricals M/s Indo Asian Fusegeear Limited~ 203-204, Shreedhar Avenue,
1940/4, Ehadia Cross Road, Gandhi Road, Ahmedabd ~ 01 11, Sardar Patel Colony, Nr. Sardar Patel Statue, Naranpura, Ahmedabad
4. LEGEND &WIT 9. VlNAY (Refer to Ch.1.1 (A) Cat.-II (I))
M/S, VINAYAK ELECTRICAL INDUSTRIAL, Dal Mill, Opp. 10. LEADER
Charch, M/s Leader Electrical P.L., Leader House, 9 B, Mahal Industrial
Behind Sonis Wadim SURENDRANAGAR - 363001 Estate, P.B.No 9483, Mahakali Caves Read, Andheri (E),
5. VIMAL Mumbai - 400
Mis Solanki Industries, 22/180, Motilalnagar, Opp Old best 11.LK
colony, Goregaon [W], MumbaJ L.K. Switchges, 165, Gl,DC Makarpura, Baroda -
CATEGORY - II 12 NORTHWEST
(1) VINAY North West Switchgear Ltd.,
M/s Vinay Electricals, 16-A, Singh Industrial, Estate, Bldg NO.1, 14/3, Mathura Road, Faridabad Haryana -
Rammandir Road, Gorengaon (W),Mumbai - 40014. 13 MK
CATEGORY - III CATEGORY - III
(1) TOYAMA 1.HAVELL'S - CRABTREE
M/S Toyama Electric Ltd M/S Havell's India Ltd, 202-205, SHIVALIK II, Nr. Shivranjani
36(A), Kiadb Industiral Estate, Hoskote, Bangiore * 562114 Crass Road, Satelite 132 Ft. Ring Road, Ahmedabad -
(2) ORPAT 2.TOYAMA (Refer to Ch.1.1 (A) Cat-III (l))
M/s. Ajanta Industrial Estate, Rajkot 3.ANCHOR [ROMA / WOOD IAVE] (Refer to Ch l. I (B)-I)
Highway Post Box NO. 115, Morbi 4.PHILIPS
(B) Mini Modular Type [Approved] M/S. Philips Electronics india Ltd., 7, Justice Chandra
1. ANCHOR [NOVA / XL] Madhab Road, Kolkata-700020.
Anchor Elect. PUd., Marathon Innova C Wing, Opp. Penivisula 6,ABB
Corporate Park, Opp, G.K,Marg, Lower Parel [W] Mumbai M/SABB Limited 2nd Floor, Est Wing, Khanija Bhavan,
2. POINTER Race Course Road, Bangalore - 560
H.O B-15, Atlanta Evershine, Evershine 6. ORPAT (Refer to Ch 1.1(A) Cat-III-(2))
Nagar, Malad [WI, Mumbai - 400064 7. SAL.ZER
3. PRISM- POINTER M/s SALZER ELECTRONICS LTD,
M/s Prism Industires (Refer to Ch.1.1.(B), Cat.-III (2)) Samichettipalayam, Coimbatore-641047
4. ORPAT (Refer to Ch 1.1.(A), Cat,-lll (2)) 8. C&S GEWISS
5. VlMAL(Refer to CM.1 (A), Cat.-III (5)) M/s. Control & Switchgears Contactors LTd
6. GELCO-Cat II 9th Floor, HERITAGE, Nr. Gujarat Vidyapith,
GELCO ELECTRONICS PVT LTD Ashram Road, Ahmedabad - 380
5,7,6 & 16Amarnath Estate, Nr. Krishna Gopal Estate, 1,2 RIGID PVC PIPES / OVAL PIPES & FITTINGS. FIA Approved
Naroda Road, Ahmedabad - 380025 & ISI marked Which is Approved by Department.
(C) Modular Type APPROVED 1. VRAJ
1. L&T ORIS M/s VRAJ PLASTIC INDUSTRIES,
M/s LARSON & TURBRO LIMITED 41,42&43 Amarnath Estate, Nr. GokuIesh Petrolium, Narol
501, SAKAR-I, OPP GANDHIGRAM RAILWAY Cross Road, Ahmedabad - 382
STATION, AHMEDABAD - 380009 2. PRECISION (Refer to Ch.1 1.(C) Cat-(I)-I)
2. LEGEND & WIT (Refer to Ch.I.I.(A), Cat,-I (4)) 3. NIHIR
3, INDOSIMON M/s NIHIR POLYMERS INDUSTRIES, 62, Umed Part Society,
M/s. EON Electric Limited Sola Road, Ghatlodia, Ahmedabad - 380
B/88, Sector 83, NOIDA- 201305, U.P., INDIA 4, HIMA / AMIT
4, RANI M/s Hima Sales Corporation, Opp, Relish Pharrna, Nr. NiIkanth
M/s. Param Switchgear (P,) Ltd, Hotel, Ta, Kalol, Dist Gandhinagar. RAKANPUR
11, CSG Anand Niketan New Delhi-Il0021. 5.VINAY (Refer to Ch.1 1.(A) Cat.-II (I))
CATEGORY - I 6.POLYCAB
1. PRECISION M/s Polycab Wires Pvt. Ltd., HICO House, 1 st Floor,
M/s Precision Etectricals Shiv Sagar estate, Pandit Satwalekar Marg, Mahim/W), Mumbai -
A-Block (Basement) Dr. A.B.Road Worli, Mumbai - 400018 7. BLP
2. POINTER~.ITALIA Refer to Ch.1.1. B), Cat.-111 (2)) M/S, Bhaglaxmi Plastic Industires, 32, Asharva Ind. Estate,
3. ALEX Opp. Khodiyar Estate, Narol, Ahmedabad
M/s Alex Industires, 3, Neminath Industrial 8. POWER FLOW INDIA / CROWN PLAST
Estate no.3 Navghar Road,, Vasai [E] Dist. Thane - 401210 M/S, CROWN INDUSTRIES
4.PRISM - POINTER (Refer to Ch 1.1.(B), 3) Plot No 6, Opp, Torrent Power Sub Station B/11,
5.VIMAL (Refer to Ch.1.1(A), Cat.-I (5)) Shahwadi Bus Stop, Narol Ahmedabad-382405
6.S.G. CATEGORY - II 9. 9 - NINE / ADITYA
1. ANCHOR-RIDER (Refer to Ch,1,1.(B)-3)
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
M/s. Aaditya Polymake, 550, Rajput Road, Opp. Volga airtech, ANY ISI MARKED WHICH IS APPROVED BY DEPARTMENT
Sarkhaj Bavla Highway, changodar, Ahmedabad. CATEGORY - II
10. MARUTI 1. ARYA (Refer to Ch.2.1. Cat.-II(I))
18, Kamal Estate, Bombay Conductors, VATVA, AHMEDABAD 11. 2. ANCHOR (Refer to Ch.1.1(B) Cat.-III (1))
PRESTO PLAST 3. BAJAJ (Refer to Ch.2.1.Cat.-II (3))
M/s, HARSH POLYMERS PVT LTD 4. OSRAM (Refer to Ch.2.1. Cat.-II (4))
5. JILCO (Refer to Ch.2.1 Cat.-II (6))
1/11 C, Proctor Road, Grant Road; [East], MUMBAI - 400007
6. PUSHKAR / AKSHAR
M/s. Puskhar Industries 87/1, Vilage ShihoIdi,
13. AMIT Vaso Alindra Road, Ta. Matar, Dist. Kheda -
Amit Electro Plast, 431,4th Floor, Sarvoday Comm. Center 7. VAPOLITE
Salapas Road, Nr. G.P.O, Ahmedabad. CATEGORY - III
14. MAXCEL PLAST
M/S. Maxcel Plast 133, SHREE Ram Ind. Estate, B/h. C.M.C, 1. HAVELLS' (Refer to Ch;1.1. (C) Cat.-Ill (I))
Anup Eng. Compound, Nr. Soni's Chawl Cross Road, ODHAV, 2. SURYA (Refer to Ch.2.3 Cat.-III (1))
Ahmedabad - 352415. 3. G.E. (Refer to Ch.2:1. Cat,-II (2))
1.3 OVAL I CASING & CAPING & PVC TRUNKING 4.PHILIPS (Refer to Ch. 1.1. Cat-III (2))
1. VRAJ (Refer to Ch,1,2.(1)) 5. CROMPTON (Refer to Ch.2.1. Cat III (3))
2, PRECISION (Refer toCh. 1.1 (C) Cat.-1.(I)) 6, HALONIX Refer to Ch 2.1 Cat.III (4))
3. NIHIR (Refer to Ch.1.2.(3)) 7. WIPRO (Refer to Ch 2,1, Cat.-III (5))
4. HIMA / AMIT (Refer to Ch.1.2.(4)) 8. C&S GEWISS (Refer to Ch.1.1.(C) Cat-III (8))
5. VINAY (Refer to Ch.1.1. (A) Cat.-II (1)) 9. SHAKTI
M/s Shakti Fixtu re Industceis 212lB, Bombay Talkies
6. POLYCAB (Refer to Ch.1,2.(6))
Compound Matad (W), Mumbai -400
M/S. Modi's Group of Companies, 34, Palace manor, 31 & 32, 2.4 COMPACT FLOURESCENT LAMPS
BAlfour Road, KeIlys, Channai - 600010 CATEGORY - I
8 9 NINE / AADITYA (Refer to Ch 1.2 (9)) 1. ANCHOR (Refer to Ch.1.1 .(B)-Cat.-III 1))
9. MARUTI (Refer to Ch.1.2(10)) CATEGORY - II
10, PRESTO PLAST (Refer to Ch.1.2.(11)) 1.SPANCO
11. POWER FLOW INDIA / CROWN PLAST ~Refer to Ch.1 2.(8)) M/S Spance Semiconductors, 10/11, Bhagat Industrial Estate,
12. SHRINATH Nr.18No. ESI Hospital, Jay Bharat Rangshala Compound,
13. M.K. 14. AMIT (Refer to Ch.1.2 Cat III (13)) 15. MAXCEL PLAST Saraspuh Ahmedabad -
(Refer to Ch.1.2 (14)) 2. GRE
LAMPS & FITTINGS M/s. GRE Electronics Pvt. Ltd,,
2.1 FILAMENT LAMPS I FLOURESCENT TUBES Plot No 423, G.I.D.C.-II, Dediyasan, Mehsana -
(A) CAT.I 3. OSRAM (Refer to Ch.2.1 Cat -II (4))
ANY ISI MARKED WHICH tS APPROVED BY DEPARTMENT; 4. JILCO (Refer to Ch 2.1. Cat.-II (6))
(B) CATEGORY - II
M/s. Standard Electrical Ltd
202-205, Shivalik - II, Nr. Shivrangni Cross Road,
M/s,Arya Filaments P.L,, 344, Vishnupuri Satelite, 132 feet Ring Road,Ahmedabad -
Annex. AB.Road, Indore - 452 001 6, CILVER
2. GE 7. INDOASIA
M/s GE India Industrial Pvt. LTd., 405, "Kirtiman", Kinariwala 8. OREVA
House, B/H Citibank, Off. C,GRoad. Ahmedabad - 380 009 M/s. Ajacta Manufacturing Ltd,
3. BAJAJ SA, National Highway, Morbi-363642,
M/S Eajaj Electricals Limited, 109, Ist FI, Sakar 111, Nr. Ashram
Rroad, Navrangpura, Ahmedabad 380 014 CATEGORY - III
M/s Osram India P.L. Delhi Road, Sonipat - Haryana - 131001 1. HAVELLS' (Refer to Ch.1.1, (C) CatIII (1))
5. ANCHOR (Refer to Ch 1.1 (B) Cat.-III (I)) 2. SURYA (Refer to Ch.2.1. Cat,-III (1))
6.JILCO 3. PHILIPS (Refer to Ch,1.1 (C) Cat -III (3))
M/S JAIN INDUSTRIAL LIGHTING CORP~ 4. CROMPTON (Refer to Ch 2,1. Cat.-III (3))
5. HALONIX i(Refer to Ch.2.1. Cat III (4))
B-70/22, DS[DC Complex, Lawrence Road, New Delhi -
6. WIPRO (Refer to Ch.2,1. Cat. III (5))
7. INDOASIAN (Refer to Ch,1.1.(C) Cat.-II-8)
CATEGORY - III M/sASIAN ELECTRONICS LTD, 11-14,
1. SURYA Tej Complex, Nr. Lions Hall, Opp. Ashoka Chambers,
M/s. Surya Roshni Ltd, (Lighting Division) Mithakhali, Ellisbridge, Ahmedabad - 380 006 - India
308, Shefali Centre, Nr. Paldi Char Rasta, Ahmedabad - 380006 8. HPL (Refer to Ch.2.1. Cat.-III (6))
2.PHILIPS (Refer to Ch.1.1(C) Cat. III (4))
3.CROMPTON 2.5 METAL HALIDE LAMPS
M/s. Crompton Greaves, C.Q. Hube, 6th Floor, Dr. Annie CATEGORY - I
Besant Road, Worli, Mumbai - 400030 ANY ISI MARKED WHICH IS APPROVED BY DEPARTMENT
4.HALONIX CATEGORY - II
M/s. Halonix Limited, 59A, 59D, Noida Special Economic Zone, 1.ARYA (Refer to Ch.2.1. Cat.-II (1))
Phase - II, Noida, Dist. Gautam Budhnagar - 201305 [UP] 2. ANCHOR (Refer to Ch.1 1 (B) Cat-III (1))
5. WIPRO 3. BAJAJ (Refer to Ch.2,1, Cat-II (3))
M/s Wipro Ltd, A/210, Fair deal House, Opp. St. Xavier"s Ladies 4.OSRAM (Refer to Ch.2.1 Cat -II (4))
8.PUSHKAR / AKSHAR (Refer to Ch.2.3 Cat.-III (8))
Hostel, Navrangpura, Ahmedabad
M/s B/707, Premium House, Nr. Gandhi Gram Rly Station,
B/H Natraj Cinema, Ashram Road, Ahmedabad - 380009 1. SURYA (Refer to Ch.2.1. Cat.-III (1))
2.GE (Refer to Ch.2 1. Cat.-II (2))
2.3 SODIUM WAPOUR LAMPS 3.PHILIPS (Refer to Ch,1.1. (C) Cat-III (2))
CATEGORY-1 4.CROMPTON (Refer to Ch.2.1. Cat.-III (3))
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
5. HALONIX (Refer to Ch 2.1 Cat-III(4))
6. WIPRO (Refer to Ch.2.1. Cat -111 (5)) 8.GLOMORE
7.HAVELL'S (Refer to Ch.1.1. (A) Cat.-III (1)) M/S Devraj Enterprises (P) Ltd ,
8, C&S GEWISS (Refer to Ch.1.1 .(C) Cat.-11I (8}) SobhnaAppartment. 4th Floor, Above Mandavi Bank,
9. SHAKTI (Refer to Ch.2.3. Cat.-11 (9)) Chandravarkar Road, Borivali [W], Mumbai -
9. C&S GEWISS (Refer to Ch. 1 I (C) Cat qll (8))
2.6 ENERGY SAVING FLOURESCENT TUBE & CFL FITTINGS (Box 10. CILVER (Refer to Ch26. Cat -II (10))
Type/Industrial Type/Mirror Optic/Mirror Light/Street Light) 11. ACON
APPROVED M/s Surer Electronics 'Sorab Villa", Nr. Popular House,
Ashram Road, Ahmeabad-
1,FUTURE LIGHTING 12 INAVA (Refer to Ch.2.6, Cat.-II (3))
M/S. FUTURE LIGHTING INDIA LTD+ 8TH FLOOR, TOWER 13 PRESTOLITE (Refer to Ch. 26 Cat-III (4))
"C"~ 247 PARK, LB.S, MARG, VIKHROLI [VV] MUMBAI - 400083 14 INDOASIAN (Refer to Ch.1 1. (C) Cat.-II (8))
2.CAMAY 15 SHAH
M/S. CAMAY ELECTRONICS, CAMAY HOUSE, CHANDN[ M/s Shah Electronics, A-3, Manoharvila, New Naroad, Nicol Road,
CHOWK, FULWADI DHORE, JETPUR ~ 360370 Nr Naroda Canal, Nicol, Ahmedabad ~
3. EUROLITE 16 Pulse / Nano (Refer to Ch. 2.6, Cat.-I (1))
M/S RUBYCON ELECTRICALS & ELECTRONICS INDUSTRIES 17 AKHIL(Refer to Ch.2.6 Cat.-I (3))
SURVEY NO 246/4, OPP. G I.D.C. PHASE-I SIHOR -
BHAVNAGAR - GUJARAT CATEGORY - II
4. ENERGYVISION [ENERGY SAVING T-5 TUBE FITTING I CFL OUTDOOR TYPE]
M/S ENERGY VISION, 38/568, SHASTRINAGAR, 1. GELCO (Refer to Ch,1 .1 (B) cat-III (6))
KHATODARA COLONY, SURAT - 395002 2. SHAKTI (Refer to Ch. 2 3. CatIII (9))
EUROLITE (Refer to Ch,2 6, Approved (3)) 3. JILCO (Refer to Ch2.1. Cat -II (6))
4. CILVER(RefertoCh2.6 Cat.-II(10))
CATEGORY - I 5. AKHIL (Refer to Ch,2.6 Cat-I (3))
1. PULSE 6 ACON (Refer to Ch2.6 Cat-Il (11))
M/s Pul$e Electronics & Control B/1, Maruti tenament,
Opp. Shdji Bapa Complex, Nr. Rabari Colony, Vastral to Odhav CATEGORY - III
Canal Road, Ahmedabad (ENERGY SAVING T-5 TUBE FITTING / CFL INDOOR TYPE]
2.HAVELL'S (Refer to Ch.l 1, (A) Cat.-III (1)) 1. HAVELL'S (Refer to Ch.1.1. (C) Cat-Ill (1))
3.AKHIL 2. HALONIX (Refer to Ch,2.1 Cat -Iii (5))
M/S SATYA ENGINEERING WORKS PL. A-111, MANGOL 3. GRE (Refer to Ch.2.4. Cat.-II (2))
PURl IND AREA PHASE - II, NEW DELHI - 110034 4, WIPRO (Refer to Ch. 2.1. Cat.-III (5))
4. Optic Lighting 5, THORN
M/S Optic Lighting PL Rajiv House4, Smritkunj, M/s. Thorn Lighting India PL C/o,f 0 parshwanath Apt.,
Nr, Navrangpura Post Office. Navrangpura, Ahmedabad -09 Somnath Park Lane, Opp Tele, Exchange, Sahibaug,
5.Pulse / Nano(Refer to Ch26 Cat,-I (1)) Ahmedabad -
6.Aash Cube 6.SURYA(Refer to Ch21 Cat.-III (1))
M/s Aashcube Lighting P.L. C/41,195, Krishna Estate 7.ASIAN (Refer to Ch. 2.6. Cat II (4))
B/h Anuptech, Opp B,I.D C. Gorwa, Vadodara - 390016 8.G.E.(RefertoCh.21 Cat-II(2))
9,PHILIPS (Refer to Ch. 1.1. (C) Cat.-III (4))
CATEGORY - II 10. CROMPTON (Refer to Ch.2.t. Cat. III (3))
1, JABLA 11, BAJAJ (Refer to Ch.2.1 .Cat.-II (3))
M/S JABLA ELECTRICAL INDUSTRIES, 29 B/C JAY 12. PASOLITE
KHODIYAR INDUSTRIAL ESTATE, NR. SUBHASH ESTATE, M/s Pasolite Electricals P.L.
RAMOL ROAD C T~M. AMRAIWADI, AHMEDABAD - 380026 7, kilari road, 14th cross, Bangalore-
2,GELCO (Refer to Ch. 1,1, (B) Cat.-III (6)) 13. PRESTOLITE (Refer to Oh 2 6 Cat -III (4))
3. INAVA 14. HPL (Refer to Ch. 2 6 Cat.-III (2))
M/s. Inava Instruments International 94, Ratnajyot Ind. Estate, 15. SHAKTI (Refer to Ch,2.3. Cat.-III (9))
Irla Lane, Vile Parle (W), Mumbai -
4. PIERLITE ENERGY SAVING T-5 TUBE FITTING / CFL [OUTOOR TYPE]
M/s. Pierlite India PL. Rakhial Road, Ahmedabad. CATEGORY - III
CATEGORY - III 1.HAVELL'S(Refer toCh.l.1. (C) Cat-III(1))
1. SPANCO (Refer to Ch. 2.4. Cat.-II (1)) 2.GRE (Refer to Ch,2 4, Cat-II (2))
2, HPL 3.SURYA (Refer to Ch.2 1. Cat.-III (1))
M/s. HPL EIeetrie& Power Ltd., Plot No. 76-B, Phase-IV, 4.PIERLITE (Refer to Ch2.6 Cat,II (4))
Sec.-57, JSIIDC, Indl Area, Kundli Dist. Sonipat, 5.PHILIPS (Refer to Ch.1.1 (C) Cat.-III (4))
(Haryana)-131028. 6.CROMPTON(RefertoCh2,1 Cat 111(3))
3. FIXOLITE 7.WIPRO (Refer to Ch.2.1. Cat.-IIl (5))
M/s FIXOLITE INDUSTRIES, Jhon Robert Compound B.THORN [Refer to Ch.2.6. Cat -III (5))
Sewri Fort Road, Sewri (E), Mumbai - 400015 9.BAJAJ (Refer to Ch.2.1.Cat-II (3))
4. PRESTOLITE 10.SHAH (Refer to Ch. 2.6, Cat -II (15))
M/s Prestolita Corporation, 57/5, Khalii Sth Compound, 11. PRESTOLITE (Refer to Ch. 2.6 Cat.-IJl (3))
Off M.G. Road, Gurgaon [WI, 12. HPL (Refer to Ch,2.6.Cat.-IIl (2))
5.SHAKTI (Refer to Ch.2.3. Cat.-111 (9)) 13. FIXOLITE (Refer to Ch.2.6.Cat,III (3)~
6.C&S GEWISS (Refer to Ch.1.1 (C) Cat.-III (18)) 14. SHAKTI (Refer to Ch.2.3. Cat. Ill (9))
15.TEKNOLITE (Refer to Ch2.6. Cat.-III (3))
[ENERGY SAVING T-5 TUBE FITTING / CFL INDOOR TYPE] 2.7 FLOURESCENT TUBE FITTINGS [ ELECTRONICS BALLAST (Box
CATEGORY - II Type/Industrial Type/Mirror Optic/Mirror Light/Streetlight)
1.SPANCO (Refer to Ch.2.4: Cat-II (1)) APPROVED
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
2. GELCO (Refer to Ch.1.1. (B) Cat-III (6)) M/S. ADHUNIK SWITCHGEARS P L
3. TEKNOLITE UNIT-l, 902/290, SHALIMAR IND AREA DELHI -
M/s TeknovisionAIlied Product P.L 16, Waman Patil Industries
Estate, Nr. Dukes Factory, Nr. Chembur, Mumbai-71 CATEGORY - I
4.ARYA (Refer to Ch,2,1, Cat-II (1)) ANY ISI MARKED WHICH IS APPROVED BY DEPARTMENT
5.SHAKTI (Refer to Ch.2,5. Cat-III (9)) 1. PULSE (Refer to Ch.2 6. Cat q (2))
6.JILCO (Refer to Ch.2,1. Cat.-II (6))
7.ANCHOR (Refer to Ch.1.1. (B) Cat-III (1))
CATEGORY - II 2.10 FLOOD LIGHTS WITH BCI ES/IMV I SV I MH / LAMPS
1. GELCO (Refer to Ch.1.1. (B) Cat.-lII(6)) (POST TOP LANTERN I STREET LIGHTS)
2. PRESTOLITE (Refer to Ch.2.6. Cat -III (4)) CATEGORY - I
3. GLOMORE (Refer to Ch.2.6. Cat.-II (8)) ANY lSI MARKED WHICH IS APPROVED BY DEPARTMENT
4. TEKNOLITE (Refer to Ch.2.6. Cat.-II (3)) 1.EUROLITE (Refer to Ch.2.6 Cat Approved (3))
5. ARYA (Refer to Ch.2 1, Cat-Il (1)) 2. SUNBEAM (Refer to Ch. 2.9. Cat.-I (3))
6, INDOASIAN (Refer to Ch,1,1. (C) Cat.-II (8))
7. JILCO (Refer to Ch.2.1 Cat.-II (6)) CATEGORY - II
8.CILVER (Refer to Ch.2.6 Cat.-II (10)) 1. SPANCO (Refer to Ch.2.4. Cat.-II(1))
9. ANCHOR (Refer to Ch. I 1. (B) Cat-tit) 2,GLOMORE (Refer to Ch.2.6 Cat ~ II (18))
10, G.E, (Refer to Ch.2.1. Cat.-II (2)) 3. ARYA (Refer to Ch.2.1. Cat.II (1))
11.PASOLITE (Refer to Ch.2.6. Cat-II (12)) 4. ANCHOR (Refer to Ch.1.1. (B) Cat.-Ill (1))
12,ACON (Refer to Ch,2.6 Cat.-II (11)) 5.G.E. (COMMON FITTING] (Refer to Ch. 2.1. Cat,-II (2))
M/S ACQURATE Engitech Limited, Plot NO 147/148, GIDC CATEGORY - III
Ankleshwar, Dist. Bharuch Gujarat - 393002 1. SURYA (Refer to Ch.2.1. Cat-III (1))
14. BAJAJ (Refer to Ch. 2.1. Cat.-II (3)) 2. HAVELL'S (Refer to Ch.1.1, C) Cat.III(1))
15.AKHIL (Refer to Ch.2.6, Cat.-I (3)) 3, GRE (Refer to Ch. 2 4. Cat.-IJ (2))
16. SUNBEAM 4. PIERLITE (Refer to Ch.2,6. Cat.-III (8))
M/s Sunbeen Electricais, 292/7/B Shastri Laghu Udhyog Nagar, 5.G.E. (SF/GEMF/BLAZE/ZION/GLANZ/EI-2000+/CONJA-J R / HELO
Maheshwari Mill Read, Tavdipura, Shahibaug, Ahmedabad-30004. FLOOD / ARINA)
CATEGORY - III (Refer to Ch.2.1, Cat II (2))
1. PHILIPS (Refer to Ch,1 1. (C) Cat.-Ill (3) 6.PHILIPS (Refer to Ch,l.1, (C) Cat-III (4)
2. CROMPTON (Refer to Ch.2.1, Cat.-III (4) 7,CROMPTON (Refer to Ch.2.t, Cat-III (3)
3.SURYA (Refer to Ch. 2.1.. Cat -III (1)) 8.WIPRO (Refer to Ch.2.1. Cat -III (5))
4. HAVELL'S (Refer to Ch,1,1. (C) Cat,-III (1)) 9.TRANSRAIL (Refer to Ch.2,9. Cat,-III (14)
5. WIPRO (Refer to Ch.2.1 Cat -III (5) 10. HALONIX (Refer to Ch,2,1. Cat.-III (4)
6, HALONIX (Refer to Ch.2.1. Cat.-III (4) 11. BAJAJ (Refer to Ch. 2.1. Cat.-II (3))
7. GRE (Refer to Ch. 2.4. Cat -II (2) 12. PRESTOLITE (Refer to Ch.2 6. Cat.-III (4))
8,SHAH {Refer to Ch.2.6 Cat.-II (15) 13, FIXOLITE (Refer to Ch. 2.6. Cat.-III (3))
9. FIXOLITE (Refer to Ch,2.6. Cat, IIII (2) 14. HPL (Refer to Ch.2,6 Cat -III (2))
10. HPL (Refer to Ch. 2.6,Cat.-III (2)) 15. C&S GEW[SS (Refer to Ch,1,1. (C) Cat.III[ (8))
11. PIERLITE (Refer to Ch.2.6. Cat.-II (4)) 16. SHAKTI (Refer to Ch2.3 Cat.-III (9))
12. C&S GEWISS (Refer to Ch.1.1, (C) Cat -III (5)
13. SHAKTI (Refer to Ch. 2.5. Cat,III (9)) 2,11 Halogen Tube Fittings
2.9 SODIUM VAPOUR LAMP FITTINGS ANY ISI MARKED WHICH IS APPROVED BY DEPARTMENT
(POST TOP LANTERN / STREET LIGHTS) 1. EUROLITE (Refer to Ch.2.6. Cat, Approved (3))
1. GLOMORE (Refer to Ch.2.6 Cat.-II (8)) Category - II
2.EUROLITE - APPROVED (Refer to Ch.2.6. Cat. Approved (3) 1. ARYA (Refer to Ch,2,1. Cat. II (1))
3.SUNBEAM (Refer to Ch.2.7, Cat.-II (16) 2. PIERLITE (Refer to Ch.2,6. Cat -II (4))
4.OPTIC LIGHTING (Refer to Ch.2:6. Cat.-I (4) Category - III
CATEGORY - II 1. HAVELL'S (Refer to Ch.1.1. (C) Cat.-Ill (1 )
1.SPANCO (Refer to Ch.2.4 Cat,-II (1)) 2, WIPRO (Refer to Ch.2.1, Cat-II (4)
2. ARYA (Refer to Ch.2 1, Cat II (1) 3. HALONIX (Refer to Ch.2 1. Cat -III (4)
3. JILCO (Refer to Ch.2.1. Cat.-II (6) 4. TRANSRAIL (Refer to Ch. 2.14 Cat.-III (7))
4. ClLVER (Refer to Ch.2.6 Cat.-II (10) 5. SHAKTI (Refer to Ch.2 3 Cat-III (9))
5, ANCHOR (Refer to Ch,1.1. (B)-Cat-III (1) 2.11 (A) METAL HELIDE LAMP FITTINGS
6. G.E.[COMMON FITTING] (Refer to Ch. 2.1 Cat,-II (2) CATEGORY - I
7.ACQURATE (Refer to Ch. 2 7, (18)) 1. GLOMORE (Refer to Ch. 2.6 Cat -II (8))
8. PULSE/NANO (Refer to Ch.2.6. Cat,-I (1) 2, EUROLITE (Refer to Ch.2.6 Cat Approved (3))
CATEGORY - III 3, OPTIC LIGHTING (Refer to Ch. 2,6 Cat- I (4))
1. HAVELL'S (Refer to Ch,1.1, (C) Cat,-Ill (1) CATEGORY- II
2. PIERLITE (Refer to Ch.2,6. Cat.-II (4) 1. BAJAJ (Refer to Ch.2.1, Cat.-II (3))
3. SURYA (Refer to Ch.2,1. Cat. III (1) 2. ARYA (Refer to Ch. 2.1, Cat: II (1))
4. G.E. (SR/SPPT/OLYMPIA/RANGER / GEN-X / SKYGEN / M ET- 3. JILCO (Refer to Ch. 2.1. Cat -II (6))
40/SPECTRA / QUNA / NOVA T-5 STRECT / OPTYLANE) (Refer 4. PASTOLITE (Refer to Ch. 2 6 Cat. III (13))
to Ch.2.1. Cat-Il (2) 5. PIERLITE (Refer to Ch.2.6 Cat -II (4))
5.PHILIPS (Refer to Ch. f .1. (C) Cat.III (4)
6,CROMPTON (Refer to Ch.2.1. Cat.-III (3) CATEGORY - III
7.GRE (Refer to Ch.2.4 Cat.-II (2) 1. HAVELL'S (Refer to Ch.1,1. (C) Cat III (1))
8. HALONIX (Refer to Ch.2.1. Cat.-III (4) 2. THORN (RefertoCh.2.6. Cat.-IIII(5))
9.WIPRO (Refer to Ch.2.1. Cat.III (5) 3. GRE (Refer to Ch.2.4. Cat,-lI (2))
10. THORN (Refer to Ch.2,6. Cat,-III (5)) 4. TRANSRAIL (Refer to Ch.2 9. Cat.-III (14))
11,BAJAJ (Refer to Ch.2 1. Cat.-II (3}) 5. SURYA (Refer to Ch. 2.1. Cat-III (1))
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
12.FIXOLITE (Refer to Ch.2.6 Cat.-II (3)) 6. WIPRO (Refer to Ch.2.1. Cat -III (7))
13.PASOLITE (Refer to Ch.2.6, Cat.-III (13)) 7, HALONIX (Refer to Ch.2,1 Cat.-Ill (5))
A-201/209, Boomerang Complex, Chandivali Farm Road 2.12 ELECTRONIC BALLAST
, Andheri [E[, Mumbai - 400072 CATEGORY - I
15.PRESTOLITE (Refer to Ch.2,6 Cat.-lII(3)) 1. AMIT (Refer to Ch.1.2. (13))
16.HPL (Refer to Ch. 2.6.Cat.-lll (2)) 2. INAVA (Refer to Ch,2,6. Cat.-II (10))
17.C&S GEWISS (Refer 1o Ch,1,1. (C) Cat.-III(8)) 3, ANCHOR - APPROVED (Refer to Ch. 1.1, (B) Cat.-III (2))
18. SHAKTI (Refer to Ch~2.3 Cat.-III (9)) 4. CILVER (Refer to Ch,2.6. Cat II (10))
5. PULSE (Refer to Ch.2.6, Cat.-I (1))
2. GLOMORE (Refer to Ch.2.6. Cat.-II (8)) 6. JILCO (Refer to Ch.2,1, Cat.-II (6))
3. TEKNOLITE (Refer to Ch.2.0. Cat.-2 (3)) 7. EUROLITE - APPROVED (Refer to Ch.2.6. (3))
4. GELCO (Refer to Ch.1,1. (B) Cat.-(2 (6)) 8. CAMAY (Refer to Ch.2 6~ Approved (2))
5. INDOASIAN (Refer to Ch.1 .1. (C) Cat.-II (8)) CATEGORY - II
6. ARYA (Refer to Ch.2,1. Cat,-II (1)) 1.SPANCO(RefertoCh2.4 Cat.-II(1))
7. ASIAN (Refer to Ch.2.4. Cat.-III (7)) M/s Bentec Electrical& Electronics PL. No 7, Maharaja Estate,
8. OSRAM (Refer to Ch. 2,1, Cet.-II (4)) B/4, Bhagyoday Hotel, Sarkhej - SanND Highway,
9. ACON (Refer to Ch.2.6. Cat.-II (11)) Sarkhej -Ahmedabad -
10:INTELUX 6, ACTION (Refer to 2.7 Approved (1))
M/S intelux Electronics P.L. Unit No 2, Electronics Co. Op. Estate
Pune - Satara Road, Pune - 411009 CATEGORY - III
M/s. OCLEG CONTROLS, 93-94, Amar Estate, B/h Lubi Elect., 1. HAVELLS (Refer to Ch.1.1 (A) Cat-III (1)
memco, Naroda Road,Ahmedabad 2. INDOASIAN (Refer to Ch.1.1(C) Cat,-II (8))
12. Pulse/Nano (Refer to Ch.2.6. Cat.-1 (1)) 3. STANDARD (Refer to Ch,2.4. Cat.-II (5))
CATEGORY - III M/S L & T House, Ballord Estatel P.O. Box No 278 Mumbai-01.
1. HAVELL'S (Refer to Ch. 1.1. (C) Cat.-III (1)) 5.CROMPTON (Refer to Ch.2.1. Cat.-III (4))
2. GRE(ReferfeCh2.4. Cat.-Il(2)) 6.C&S (Refer ta Ch.1.1 (C) Cat.-III (8))
3.PIERLITE (Refer to Ch.2.6. Cat.-II (4)) 7. GUTS¸
4. PHILIPS (Refer to Ch1.1 (C) Cat III} (3)) M/s GUTS CIRCUIT BREAKERS PVT LTD, ManasAnand Bldg
5.CROMPTON (Refer to Ch. 2,1. Cat.-III (4)) No .1 Flat No 804,Dongri Pada, Godbunder Road, Thane West
6.WIPRO (Refer to Ch.2.1, Cat.-III (7))
7. HALONIX (Refer to Ch.2.1, Cat-III(5)) 8. HPL (Refer to Ch.2.1, Cat -III (6))
6.SHAH (Refer to Ch.2.6. Cat,-II (15)) 3.3 METAL CLAD SWITCHES WITH HRC FUSE
9.HPL (Refer to Ch.2.1 Cat.-[II (6)) CATEGORY - II
10. FIXOLITE (Refer to Ch. 2,6. Cat. III (3)) 1. KEW (Refer to Ch. 3.1, Cat.-III (1))
11. C&S GEWISS (Refer to Ch.1.1(C) Cat.-III(8)) 2. PIERLITE [ELECON] (Refer to Ch.2.6. Cat.-II (4))
12. SHAKTI (Refer to Ch.2.3, Cat,-III (9)) 3. PEW (Refer to Ch,2,12.(3.1) Cat-II (4))
4. SUPER (Refer to Ch. 2.12 (3,1) Cat -II (5))
CHAPTER III 5. CROMPTON (Refer to Ch.2.1. Cat-III (3))
SWITCHGEARS & DISTRIBUTION BOARDS 7. NEW / NILANG (Refer to Ch.2.12 (3.1) Cat II (3))
3.1 CAST IRON CLAD SWITCHES WITH REWIREBLE FUSE 6. ELECTRO POWER
CATEGORY - I M/s. Electro Power, B-22, Jay Estate, Opp. Keval weigh bridge
ANY ISI~ MARKED WHICH IS APPROVED BY DEPARTMENT Rakhial, Ahmedabad ~
CATEGORY - Il CATEGORY - III
1. TRISHUL 1. HAVELLS (Refer to Ch.1.1. (A) Cat.-III (1))
M/s Aum Electrical Industries, 1014, GIDC, 2. INDOASIAN (Refer to Ch,1.1 (C) Cat.-II (8))
Waghodia - 321760 Gujarat 3. STANDARD (Refer to Ch2,4. Cat -II (5))
2. MODI 4, C&S GEWISS (Refer to Ch.1.1. (C) Cat -III (8))
M/S MODI INDUSTRIES~ 61, Mahaveer Estate, Nr. Anupam 5. L & T refer to Ch.3.2 cat-III(4))
Cinema, Khokhara,Ahmedabad-380008 6. Siemens
3. NEW/NILANG M/s. Siemens Ltd L.V. Control & Distribution
M/s NilangEngineering Works, Plot No. 156/2, A-31 Kailashnagar Products Thane Be!apur Road, Thane -
Estate, Opp. New Tele. Exchange, F Road, GI.D.C, Vatva, 7,GE.(Refer to Ch.2,1. Cat. II(2))
Ahmedabad - 382445 8.GUTS (Refer to Ch. 3 2. Cat.-III (7))
4, PEW 9.HPL (Refer to Ch.2.1. Cat.-III (6))
M/s Patel Engineering Works, 23, Vrundavandham, Society, Opp. 3.4 MOULDED CASE CIRCUIT BREAKERS
P.d. Pandya College, Nr. Smruti Mandir, Ghodasar~Ahmedabad CATEGORY - I
5. SUPER ANY [SI MARKED WHICH IS APPROVED BY DEPARTMENT
M/S SUPER SWITCHGEARS, SHED - C,5/6, GIDC VITTHAL 1,L.S. APPROVED
UDHYOG NAGAR,~ZVNAGAR, - 388121 2.ACTION I ADHUNIK (Refer to Ch.2.7 Approved (1))
6. AEW CATEGORY - II
M/s. Ambica Engineering Works, L-61, G,I.D C. Estate, 1. BENTEC (Refer to Ch.3.1. Cat.-II (7))
Nr. Water Tank, Odhav, Ahmedabad - 382415 2.CROMPTON (Refer to Ch.2,1. Cat -III (3))
CATEGORY - III 1. HAVELLS Refer to Ch.1.1. (C) Cat.-lII (1))
1. KEW 2. STANDARD (Refer to Ch,2 4~ Cat.ll (5))
M/s KEW FUSEGEAR PVT, LTD C 1 B/1336/38, Gl.D.C. Estate, 3. BCH
Makarpura, Vadodara - 390010 M/s. BCH Electric Limited 93,City centre Nr. Swank Char
2.STENLY · Rasta, C.G Road, Ahmedabad -380
3.2 METAL CLAD SWITCHES WITH REWIREBLE FUSE 4.C&S GEWISS (Refer to Ch.1 1. (C) Cat.-III (8))
(63A - 100 A) APPROVED 5.INDOASIAN (Refer to Ch.1.1. (C) Cat.-II (8))
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
1.ACTION I ADHUNIK (Refer to 2.7 Approved (1)) 6.L&T(Refer toCh,3.2, Cat,-III(4))
CATEGORY - I 7.SIEMENS (Refer to Ch,3.3 Cat,III (6))
1. REIKO 8.GE. (Refer to Ch.2.1 Cat.-II (2))
M/S R.L.Electrical Industries, 8, Sri Ram Marg, Opp, Central 9.GUTS (Refer to Ch.3.2 Cat,-Ill (7))
bank, Moujpur Road, Shahdara, Delhi-110053 (INDIA) 10.HPL (Refer to Ch~2.6, Cat,Ill (3))
CATEGORY - II 3.5 AIR CIRCUIT BREAKERS
1.KEW (Refer to Ch.3,1, Cat.-III (1)) APPROVED
2.TRISHUL (Refer ta Ch.2.12. (8.1) Cat.-II (1)) ANY ISI MARKED WHICH IS APPROVED BY DEPARTMENT
3.MODI (Refer to Ch.2.12.(3,1) Cat.-II (2)) 1. BIECCO
4.PEW (Refer to Ch.2.12. (3.t) Cat.-II (4)) M/s. Biecco Lawarie Limited, 95, maker tower "F", 9th Floor, Cuffee
5.SUPER (Refer to Ch. 2.12. (S,t) Cat.-II (5)) Parade~ Mumbai
6.NEW/NILANG(RefertoCh.2.12. Cat.-lI(3)) 2.HPL (Refer to Ch.2.1. Cat -III (6))
4. CROMPTON (Refer to Ch. 2,1, Cat -III(3)) CATEGORY - III
8. L&T(RefertoCh.3.2 Cat-III(4)) 1. C&S (RefertoCh.1.1.(C)Cat-(8))
8, Siemens (Refer to Ch.3 3. Cat-II 6)) 2. INDOASIAN (Refer to Ch.1,1. (C) Cat-IIl (8)
7. HAVELLS ~Refer to Ch. 1.1. (C) Cat.-III(1)) 3. G.E. (Refer to Ch.2.1 Cat.-II (2))
8, HPL (Refer to Ch. 2.8. Cat.-III(2))
3.6 CHANGE OVER SWITCHES
APPROVED 13. BENTEC (Refer to Ch.3.4 Cat.-II (7))
1. ACTION / ADHUNIK (Refer to 2.7 Approved (1)) 14. SIGMA (Refer to Ch. 3.6 Cat. II (8))
CATEGORY - I CATEGORY - III
1. MODl(RefertoCh2.12 Cat.-II(2)) 1. HAVELLS (Refer to Ch.1 1. (C) Cat.-III(1))
2. REIKO (Refer to Ch.3.2. Cat-I(1)) 2. STANDARD (Refer to Ch. 2,4. Cat -II (5))
3, C&S (Referto Ch.1.1 (C) Cat-II(12))
CATEGORY - II 4. INDOASIAN (Refer to Ch. 1.1. (C) Cat.-II(8))
1. PEW (Refer to Ch. 2.12 (3.1) Cat -II (4)) 5. ABB(RefertoCh.1.1(C) Cat-III(5))
2. KEW(RefertoCh3.1 Cat.-III(1)) 6. L&T (Refer to Ch.3.2 Cat.-Il114))
3. BENTEC (Refer to Ch. 3.1 Cat -II (7)) 7. GUTS (Refer to ch3.2 Cat-III(7))
4. NEW / NILANG (Refer to Ch. 2.12 (3 1) Cat -II (3)) 8. G.E (Refer to Ch. 2.1. Cat.-II(2))
5, SUPER (Refer to Ch. 2.12.(3.1) Cat.-II(5)) 9. HPL(RefertQCh2.1 Cat-III(6))
6, ANCHOR (Refer to Ch. 1.1. (B) Cat.-III(1)) 10. NANO;
7. ELECTRO POWER (Refer to Ch. 3.3 Cat II(8)) M/s Ajay Electrical Industries, B-257,
8. SIGMA naraina ind. area, phase - I, New Delhi
M/S. MCB Electronic Controls, C-176, Mayapuri industrial 11. MDS
Area, Phase-II, New Delhi-110064 12. PIERLITE SAFETY (Refer to Ch2.6 Cat-Il (4))
9. AEW (Refer to Ch. 3 1. Cat -II (6))
3.8 ELCB & RCCB
CATEGORY - III APPROVED
1, HAVELLS (Refer to Ch1,1. (C) Cat.-III(1)) 1. ACTION / AOHUNIK (Refer Lo 2.7 Approved 1))
2. STANDARD(RefertoCh,2.4 Cat -II(5))
3. C&SGEWISS(RefertoCh. 1.1 (C) Cat-(12)) CATEGORY -
4. INDOASIAN (Refer to Ch. 1.1. (C) Cat-II(8)) 1, PULSECONTROL(RefertoCh2.6 Cat.-I(1))
5. L & T (Refer to Ch,3.2 Cat.-III(4)) 2. MILLION&MILLTEC(RefertoCh. 1.1 (A) Cat-1(3))
6. Siemens (Refer to Ch.3.3. Cat-Il (6)) 3. ELLICO (Refer to Ch3.7 Approved (6))
7. Crompton (Refer to Ch.2 1, Cat-III(3)) 4. S.G,
8. G.E.(RefertoCh2.1 Cat.-II(2)) CATEGORY - Il
8. GUTS (Refer to Ch.3 2. Cat.-III(7)) 1. GELCO(RefertoCh.1.1 (B) Cat.-III (6))
10. HPL (Refer to Ch.2 1, cat-III (2)) 2. GRE (Refer to Ch. 2 4. Cat -(2))
11. PIERLITE - ELCON (Refer to Ch2.6 Cat,-II (4)) 3. RANI (Referto Ch.1 (C) (4))
4. BENTEC(RefertoCh3.1 Cat-II(7))
3.7 MCB & MCB DISTRIBUTION BOX APPROVED 5. AECO-MEFA (Refer to Ch.3.7 Cat.-II (5))
1. TOYAMA (Refer to Ch.1.1 (A) Cat-III (1)) 6. ANCHOR (Refer to Ch.1.1 (B)Cat -III (I))
2. MILLION & MILLTEC (Refer to Ch11. (A) Cat-I (3)) 7, SUPER (Refer to Ch.2 12 (3.1) Cat.-II (5))
3. BALKAM 8 ELECOR-CLIPSAL (Refer to Ch. 3.7. Cat,-II(11)))
M/s Balkam India Ltd, B-33, Old Vishnu Garden, 9. OCLEG(RefertoCh.2.12. Cat.-II(11))
New Delhi - 110 018 10. Pulse / Nano (Refer to Ch. 26 Cat -I(1))
4. ESCO 11. SIGMA (Refer to Ch36. Cat.-II(8))
M/S ELECTRO SPARES & Co. 1894/A/1 Inside Pade Pole
GandhiRoad, Ahmedabad - 380 001 CATEGORY - III
8. SMPL 1. GUTS (Refer to Ch.3.2 Cat -III (7))
M/s SARD METALS PL Plot NO45, Sector No.23, Sohna 2. STANDARD (Refer to Ch. 2.4. Cat.-II (5))
Road, Faridabad- 121005 3, C & S (Refer to Ch.1 1. (C) Cat -III(8))
6. ELLICO 4. INDOASIAN (Refer to Ch.1.1. (C) Cat -II (8))
M/S General Electronics &Controls, C/71, G. LD.C. Odhav, 5. ABB(RefertoCh1.1 (C) Cat-III(5))
Ambicanagar Road, Ahmedabad - 382415. 6. HAVELL'S (Refer to Ch.1.1 (C} Cat -III (1))
7. ACTION (Refer to 2.7 Approved (1)) 7, L&T (Refer to Ch.3.2 Cat.-II(4))
8. MAXCELPLAST (Refer to 1.2 (14)) 8 HPL (Refer to Ch,2 1 Cat-III (6))
9 NANO (Refer to Ch.3.7. Cat.-II(10))
CATEGORY - I 10. PIERLITE (Refer to Ch.2.6 Cat -II (4))
1. VlMAL (Ref. to Ch. 1.1(A) Cat.-1 (5)) 11. MDS
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
2. S.G 3.9 TIME SWITCHES
3, VINAYAK 1. GELCO (Refer to Ch. 1.1 (B) Cat -III(6))
CATEGORY - II 2. L&T (Refer to Ch. 3 2. Cat -III 4))
1. GELCO (Refer to Ch.1.1, (B) Cat.-III(6)) 3. OCLEG (Refer to Ch.2.12. Cat.-II(11))
2. GRE (Refer to Ch. 2.4, Cat.-(2)) 4. INDOASIAN (Refer to Ch1.1 (C) Cat-II (8))
3. RANI (Refer to Ch1. (C), (4)) 8. MDS
4. KEW (Refer to Ch.3.1. cat-II (1)) 6. ELLICO
5. AECO-MEFA 3.10 ENERGY METER
M/S Punjab Switchgears P.L. B-30, Phase - V Focal Point, 9 NANO Approved (Refer to Oh 3.7. Cat.-III(10))
Dhandari }(alan, Ludhiana -
6. NEW / NILANG (Refer to Ch.2.12.(3.1) Cat.-II(3)) CATEGORY - I
7. VINAY (Refer to Ch1 1. (A) Cat,-II(1)) 1. NIPPEN
8. LEADER (Refer to Ch.1.1 (C) Cat.-II(11) M/s NIPPEN ELECTRICAL INSTRUMENTS CO 12~A, Joy Engg
9 SUPER(RefertoCh.2.12.(3.1)Cat,-II(5)) Compound, Maroi Maroshi Read, Andheri (E), Mumbai -
10 ANCHOR (Refer to Ch,1.1, (B)Cat -III (I)) 2. HPL (Refer to Ch.2.1. Cat.-III(6))
11 ELECON-CLIPSAL 3. L&T (Refer to Ch3.2 Cat-III (4))
M/s GERARD ELECTRIC INDIA PVTLTD. 4. G.E (Refer to Ch.2.1. Cat.-II(2))
RakhJal Road, Ahmedabad -366 023 6, TRINITY
12 OCLEG (Refer to Ch 2.12. Cat.-II(11)) 119, Trinity CO. Op. Hsg. Soc. 1st' Floor,
3. HPL (Refer to Ch 2.6 Cat.-III (2)) CH Street Bhobitalao, Mumbai-
3,11 BUSBAR CHAMBER 6. NANO. (Refer to Ch. 3.7 Cat III (10))
CATEGORY - I 7. GELCO (Refer to Ch. 1.1. (B) Cat.-(6))
1. PEW - APPROVED (Refer to Ch.3.1 Cat.-II(4))
2. REIKO - (Refer to Ch 3.2. Cat.-I (1)) CATEGORY - II
CATEGORY - II 1, BENTEC (Refer to Ch. 3 1 Cat -II 17))
1, NEW / NILANG (Refer 1o Ch.2.12 (3 1 ) Cat.-II (3)) 2. ANCHOR (Refer to Ch.1 1. (B) -Cat-III(1))
M/s Jainflex Cables RL , A-2/1, Sabarmati Industrial Society,
CABLES & WIRES Sabarmati, Ahmedabad -
4.1 ALLUMINIUM & COPPER XLPE CABLES (ALL Type) 23. KEI
1. UPTO 35SQ MM ANYISI MARKED WHICH IS APPROVEDBY M/s REI INDUSTRIES LIMITED 803, Siddhanath Complex, Nr Hotel
DEPARTMENT Express, RC Dutt Road, Baroda-
1. L&T 24. MECAB
2. ALLCAB M/s MECAB Cables P.L.635/A, Phase IV,
M/s. ALLWIN INDUSTIRES, Serve No. 251, PIot NO 7, GIDC, VATVA, Ahmedabad -
B/h. Devsaon Ceramic, Shapar - Veraval Dist Rajkot 25. LOOKMAN
3.GELCO (Refer to Ch.1.1 (B) Cat-III (6)) M/S ODIAN INDUSTRIES, Opp RaviVidhyalaya, Nr. Gandhi Society,
4,AVOCAID Jamnagar Road~ Madhapa~ Rajkot - 300
M/S Chandresh Cables Ltd 1108, Village Chhatral, Ta. Kalol 26. PRIMECAB
Dist Gandhinagar, North Gujarat M/s. Ravin Cables Limtied, 302, Akruti Trade Centre, 3rd Floor,
5, KUNTHCAB Road No 7, MIDC, MarolAndheri (E), Mumbai-400 0.93¸
M/s ORBIT POWER & CONTROL CABLES (I) 56 A, Dilshad 27. RALLISION
Garden Industries Area, Shahdara, Delhi- 110095 M/S RALLIS ON ELECTRICAL P.L. 205, Shreyas Complex, Opp. Jain
6. JEELEX Derasar Navrangpura, Ahmedabad -
46/02, NewAhmedabad Industrial Estate, Nova Petro~ Chem, 28. BINTEX
Moraiya, Sanand, Ahmedabad M/s Jay Industires , Bintex House, Bhavnagar
7. WINFLEX & WlNCAB Road, Nr. Rajmoi Ind. Rajkot
K.P. Industires, 53,54, Krishna Estate, Panna Estate Road, 29. EKTA
B/h BOC Gases, Nr, Soni's Chal Rakhial Ahmedabad - 380023 M/s Scot Innovation Wires & Cables P.L,
8. VARSHA 195/1,197/1, Jharmajri Baddi, Dist Solan (MP)
M/s VARSHA CABLES PVT LTD. Plot No,65, A-2, Hootagalli 30. TEREXEL
Industrial Area, DIC Layout, Mysore - 570018 M/s Teracom Limded, "Teracom House, B-
9. KATARIA 84, Sector No 60, Noida - 201301 U.P. (India)
M/s RATA RIA INDUSTRIES PVT LTD 31. MITUSHI
Off-34-44, Industrial Area, Ratlam - 457001, MP. [ INDIA] M/s Sight Sound Electronic (I) P.L.
10. ZENIUM CABLES A-128, Wazirpur industrial Area, Delhi-110052
M/s ZENIUM CABLES LTD 118, GAurav Garden, Opp Bharat 32. TERACAB INDIA
Petrol Pump, Mira Bhayander Road, Mira Road, Mumba- M/S TERA CABLES & IND.P.L, VILLAGE KALANA,
401107 PO CHHARODI FARM, SANAND,AHMEDABAD
11, BONTON 33. HI-FLEX
M/s Bonton Cables (INDIA] PL. A-114-115, M/S Helly Plast Industries 17/18, Nirman Industries Estate, Fupadia
RICO Industrial Area, Phase - I, Bhiwadi, Rajasthan Opp Samshan Gruh, A.K. Road, Surat-8
12, HAVELLS (Refer to Ch,1 1, (C) Cal.-III (I)) 34. BHARAT CAB
13, NIKI M/S Vardhman Cables & Controls, Belgaum
M/s NIKi CabIes Industries, E/9B PanchratnaAppt Opp. 35. CORE CABLE
Sunview Tower, Memnagar, Ahmedaba-52 M/S Core Cables Pvt Ltd 202, arpan Complex,
14. LEADER (Refer to Ch.1 (C) Cat.-IIl (10)) Opp Swaminarayan Mandir, Kalawad Road, Rajkot-360001
15 FINOLEX 36. RRKABEL
M/s Finolex Cables India 108, Mahakant Building, Opp. V.S. M/S R R Kabel Limited, 305/A, Windsor Plaza, RC. Dutta Road,
Hospital, Ashram Road, Ahmedabad - 380 006 Alkapuri, Vadodara-390007
16. SHREEJI 37. ADCAB
Cali Plast Processor, 47, Narayan Estate, Near Raipur Mills, M/S Atlas Cables & Accessories P.L PIot NO. D/2, Sector NO
Saraspur, Ahmedabad - 380 018. Heavy Ind Area, Gandhidham Gujarat
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
17. SONA GOLD 38, POPULAR
Cali Plast Processor, 47, Narayan Estate, Near Raipur Mills, M/S Popular industries, 12, Sudama Estate, B/h Calico Nagar,
Saraspuq Ahmedabad - 380 018 Narol-
18. HITEX PLUS sarkhej Road, Narol, Ahmedabad
M/s Jay Cable Industries, PIot No 80, Tribhuvan Industrial
Estate, Opp, Road No 11, Kathwada GIDC, Kathwada, ALLUMIBIUM & COPPER XLPE CABLES (ALL Type)
Ahmedabad - 382430 ABOVE 35 SQ. MM & UP TO 185 SQ.MM
M/s Bhumi Cables & Wires Pvt. Ltd. PIot No. D-101/102, 1. ALLCAB~RefertoCh4.1 (2))
Road-C, Lodhika G.I.D.C., (Metoda) Kalaward Road, Rajkot 2. VARSHA (Refer to4.1, (8))
20. CABCOM 3. KUNTHCAB (Refer to Ch 4 1. (5))
M/s. CabCem India, 304, 3rd Floor, Aggarwal Cid Mall 4. MITUSHI (Refer to Ch.4 1. (31))
(Opp M2K Pitam Pura Multiplex), Road NO. 44, Pitampura, 5.RALLISION (Refer to Ch 4.1. (27))
Delhi- 110034 6. LOOKMAN (Refer to Ch 4.1 (25))
21. DICAB 7. NIKl(RefertoCh~41 (13))
M/S DIMOND POWER INFRA. LTD. 8. KEI (Refer to Ch.4 1 (23))
PHASE II, VILLAGE VADALA, TA SAVLI, VADODARA 9FINOLEX(RefertoCh4.1 (15))
22. JAINFLEX 10CABCOM (Refer to Ch 4.1 (20))
23, PRIMCAB (Refer to Ch.4.1. (26)) 11. KAMALEX (Refer to Ch.4 1. (19))
24. TEBACAS INDIA (Refer to Ch.4 1. (32)) 12 MECAB (Refer to Ch.4 1. (24))
25. L&T 13 DICAB (Refer to Ch.4.1. (21))
26. AVOCAB (Refer to Ch4.1 (4)) 14, HAVELLS ,(Refer to Ch1.1 (C) Cat-Ill (1))
27. TEREXEL (Refer to Ch.4 1 (30)) 15. BONTON (Refer to Ch 4.1 (11))
28. BHARATCAB (Refer to Ch.4.1. (34)) 16. SONALGOLD (Refer to Ch 4.1: (17))
29. ZENIUM CABLES (Refer to Ch.4.1 (10)} 17 SHREEJl(RefertoCh4.1 (16))
30. RRKABLE (Refer to Ch.4.1. (36)) 18. WINFLEX (Refer 10 Ch4 (7))
31. WINPLEX & WINCAB (Refer to Ch 4.1. (7)) 19. HI-FLEX (Refer to Ch4.1 (33))
32. ADCAB (Refer to Ch,4.1 (37)) 20, CORE CAIDLE (Refer to Ch 4,1 (35))
33. POPULAR (Refer to Ch.4,1, (38)) 21. HITEX PLUS (Refer to Ch 4.1, (18))
22. JAINFLEX (Refer to Ch 4.1 (22))
ALLUMINIUM & COPPER XLPE CABLES (ALL Type) ABOVE
1. HAVELL'S (Refer to Ch 1.1 (C) Cat.-III (1))
2. ALLCAB (Refer to Ch 4.1, (2))
3, KUNTHCAB (Refer to Ch,4.1 (5)) 21, POPULAR (Refer to Ch.-4 {38))
4. TEREXEL(RefertoCh4.1 (30)) 22. NEOCAB
5, TERACAB INDIA (Refer to Ch.4 1 (32)) M/s R.S. Industires, Anand Industrial Estate, Borsad Chokdi,
7. AVOCAB (Refer to Ch.4.1(4)) Anand -
8, GEMSCAB 23. CAPTON &Arormac
M/S GEMSAD IND LTD. PREM SADAN - 11, RAJENDRA M/s MILAN INDUSTRIES, Plot NO 12, Sarthi Complex, Opp, GV
PLACE NEW DELHI - 110008 M.M., ODHAV, Ahmedabad
9. PRIMECAB' 24. RUBICON
M/s Ravin Cables Limited, 302, Akruti Trade Centre, 3rdFloor, M/s. RUBICON CABLES !NDUSTIES, C-1/89/6, Nr. Pushpak Estate
Road No,7, MIDC, MarolAndheri (E), Mumbai - 400 093 Cross Road, GIDC. Phase - 1, VATVA. Ahmedabad -
10. PELEC 25 EON
43, Sudama Estate, B/h, Swatik Bansidhar Mills, Narol Cross M/s. Eon Electric Limited
Road, Ahmedabad ~ 382405 B-88, Sector 83, Nolda -201305, U.P, INDIA
11.HITEX PLUS (Refer to Ch-4.1 (18)) 26, VIMAL, [Refer to Ch -1.1(A) Cat - I (5))
12.POPULAR (Refer to Ch.4.1 (38)) 27. HPL (Refer to Ch2.1 Cat-III (6))
13. LOOKMAN (Refer to Ch.4 1, (25)) 28. NANO, (Refer to Ch.3.7 Cat (14))
14. KEI (Refer to Ch.4.1. (28)) 29. ZENIUM CABLES (Refer to Ch.-4 (10))
15. RALLISON (Refer to Ch.4.1 (27)) 30. CORE CABLE Refer to Ch.41 (35))
16. CORE CABLE (Refer to Ch.4.1. (35)) 81. KAMALEX (Refer to Ch 4.1 (19))
17. POWERCAB 32. CABCOM (Refer to Ch.4.1 (20))
M/s. SMRUTI CABLES PVT LTD. Plot No 2, Block No 243, 83. MECAB (Refer to Ch.4.1 (24))
Nr. Ramdev Exports. Santej Vadsar Road, Ta. Kalo, Dist 34. RALLISON {Refer to Ch.4.1 (27))
Gandhinagar - 382721 35. SHREEJI (Refer to Ch.4,1 (16)
18. ZENIUM CABLES (Refer to Ch.4(10)) 36. SONA GOLD(Refer to Ch4.1 (17))
19. RRKABLE (Refer to Ch,4.1 (36)) 47. HITEX PLUS (Refer to Ch4,1 (18))
20. ADCAB (Refer to Ch.4.1, (37)) 68. VARSHA (Refer to Ch-4.1 (8))
FLEXIBLE WIRES & CABLE /INDUETIRES WIRES / FRLS WIRES/ PVC 46. FINOLEX (Refer to Ch4.1 (15))
WIRES / CO-AXIAL CABLE, SUBMERSIBLE CABLE / ZH FR 41, RRKABLE (Refer to Ch.4.1 (36))
CABLE ETC 42. ADCAB [Refer to Ch 4.1 (37))
ANY ISI ( MARKED WHICH IS APPROVED BY DEPARTMENT 43. WINFLEX & WINCAB (Refer to Ch.4 1(7))
1. ALLCAB (Refer to Ch4.1 (2)) M/s. Jainson Cables india P.L Surve NO. 16, Plot NO. 16A &B
2. AVOCAB (Refer fe Ch4.1 (4)) Ahmedabad Mehsana Highway Village Chandarda Post
3. HAVELLS (Refer to Ch,1,1. (C) Cat -III (1)) Ghumasan, Ta. KadL Dist Mehdanad-382718
4. KONARK 46. GELCO - SUBMERSIBLE CABLE (Refer to Ch.4.1 (3))
M/s. Servo Cable industries 90/5, Mandir Marg, Indl Complex,
Haiderpur, New Delhi-110052 FANS
5.KUNTHCAB (Refer to Ch 4.1. (5)) 5.t CEILING FANS & TABLE FANS
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
6.BHARAT CAB (Refer to Ch.4 (5))
7.VINAY (Refer to Ch 1.1. iA} Cat.lI (1)} 1. ORPAT .APPROVED (Refer to Ch.1 1A) Cat III (2))
8. EKTA 2. USHA
M/s Scot Innovation Wires & Cables P.L., M/S, USHA iNTERNATIONAL LTD 1st Floor, Super Market, Nr,
195/1, 197/1, Jharmalri Baddi, Dist. Solon (M.P) Natraj
9.TERA-CAB-INDIA (Refer to Ch4.1 (4)) Cinema, Ashmram Road, Ahmedabad - 380
10.EcoTEK ZHFR 3.ANCHOR[ (Refer to Ch 1.1(B)Cat -III (1))
M/s SHAKUN POLYMERS LIMITED, 501/502, IVORY 4.CROMPTON (Refer to Ch.2.1, Cat -III (4))
TERRACE, R.C.DUTT ROAD, ALKAPURI, VADODARA - 390007 5. BAJAJ (Refer to Ch,2.1. Cat -II (3))
11NIKI (Refer to Ch.4.1 (13)) 6.Philips (Refer to Ch.1.1 (C) Cat.-III (4))
12.JAINFLEX (Refer to Ch4.1 (22)) 7.KHAITAN
13.SINTEX (Refer to Ch4.1 (28)) M/s Khailtan Electric, ale, 101/102, Mahakant Complex;
14, DARSBAN PLUS Opp, V.S. Hospital, Ashram Road, Ahmedabad - 380
M/S DARSHAN CABLE INDUSTIRES C/1 135/A, PHASE -I, 8 DECON
VATVA GIDC ESTATE NR PUSHPAK ESTATE, AHMEDABAD M/s Decon Lighting, Y-43, Okhak Phase - II New Delhi-l10023
16. INDOASIAN {Refer to Ch,1.1. (C) Cat.-II (8)) 9.HAVELL'S (Refer to Ch.1.1, i) Cat.-III (1))
16LEADER (Refer to Ch1 .1.(C) Cat.-II (10)) 10. ALMONDARD
17.GEMSCAB (Refer to Ch.-4.2 (3)) 11. CINNI
18,ACT{ON / ADHUNIK (Refer to 2.7 Approved (1)) 12. REMI
19. ANCHOR (Refer te Ch1.1, (B)Cat.-III (1) 13. KEDIA
20. BENTON (Refer to Ch.-4, (11)) 14. NOVA
8. RIDER 15. GEC
9. OCLEG 16. ORIENT
10. ELLICO 17. INDO PLUS
11. PULSE M/s. The Universal Appliances (India) Nalagarh Dist Sona(H.P)
EXHAUST FANS, BRACKET FANS & PEDESTAL FANS ENERGY SAVING 50 WATT CEILING FAN
(A).CATEGORY - I
1. HAVELL'S (Refer to Ch.1.1 (C) Cat.-III(1)
1. ANCHOR (Refer to Ch 1.1 (B)Cat III (1)) 2. CROMPTON (Refer fe Ch.2,1. Cat.-III (4))
2. ORPAT (Refer to Ch.1.1. (A)Cat.III(2)) 3. BAJAJ (Refer to Ch.2.1, Cat (3))
3.ANSU 4. USHA (Refer to Ch.-5. (2)
4. NOVA 5. ORIENT
6. REMI 7. KELTRON
8.INDOPLUS(RefertoCh-5.1 (17))
1.USHA (Refer to Ch.5 (2))
2.HAVELL'S (Refer to Ch 1.1. (C) Cat.-III (1)) 7.Pulse l Nano (Reter to Ch 2.6 Cat I (1))
3,CROMPTON (Refer to Ch.2.1. Cat. III (4)) CAPACITOR
4.BAJAJ (Refer to Ch.2 1. Cat.-II (3))
5.ALMONARD 1.HAVELL'S(RefertoCh 1.1 (C) Cat-III(1))
6. ORIENT 2.MATRIX
7.SATYA M/S Matrix Control & Engineering P.L, E 725, DSIDC Indusidal
8.G.E.C. Complex, Narela, Delhi-110040
CHAPTER -VI 3.PMX
M/s. Power Matrix Solution P.L. 4018 & 4019, Bhandup Ind
SMC PRESS MOULDED BOX FOR STREET LIGHTS
Estater PannalalCompound, Off LBS Read, Bhandup [WI, Mumbai
1.SINTEX - APPROVED
4,JILCO (Refer to Ch 2.1. Cat-Ii (6))
M/S SINTEX INDUSTRIES LTD KALOL
(NORTH GU JARAT) PIN - 382
M/s Care Enterprise FF-9 ShalimarComplex,
2, EVEREST-APPROVED
Maha]laxmi Five Road, Paldi, Ahmedabad-380007
M/S EVEREST ELECTRICALS 133, PRINCESS STREET,
GOPAL NIWAS,1 ST FLOOR, ROOM NO 9/10/11, MUMBAI -
3.ESCO - APPROVED (Refer to Ch 3.7. Approved (4))
1.GRE (Refer to Ch.2 4. Cat II(2))
2.SUVIK (Refer to Ch.-6 (3))
M/s. R M Enterprise 203/B, Gurukul Tower, Jaywant Sawant
3.KEPREJ (Refer to Ch.*6 (4))
Road, Dahisar [W] Mumbai -
4.OCLEG (Refer to Ch.2.12 Cat -II (11))
5.CONSUL (Refer to Ch 6 (6))
M/s EP Composites PL Plot No 2646, Kranti Gate Main Road,
6.SERVOTECH (Refer to Ch -6 (5))
GIDC Lodhika Ind Estate, Kalawad Road, Metoda, Rajkot-860021
M/S, Numeric Power System Limited umeric House NO. 5 Sir P. SI
AIRCONDITIONERS, WATER COOLERS APPROVED
Sivasamy Salai, Mylapore, Chennai 600004 India
M/s Daikin Air-conditioning India PL. 12th Floor, Building No.
Tower A, DLF Phase IIl, Gurgaon-122022. Haryana.
1.BAJAJ (Refer to Ch.2.1. Cat -II (3))
2.MISHIBISHU ELECTRIC
2.USHA (Refer to Ch.-5 (2))
M/s. Mitsubishi Electric India PL Primate 303/A, 3rd floor
3.INDO PLUS (Refer to Ch 5 1. (17))
Judges Bungalow Cross Road, Bodakedev, Ahmedabad.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
3. ONIDA, CATEGORY - II
MIRC Electronics, ONiDA House, G-l, MIDC
Mahakali Caves Road, Andheri [E] Mumbai - 400093 1.JILCO 2.SPHEREHOT3, RECOLD 4. VENUS
5.BLUE SATAR MOTOR PUMPS
6. PANASONIC MOTOR PUMP STARTERS & STARTER ACCESSORIES
7.VOLTAS APPROVED
8.CARRIERS 1. GELCO (Referto Ch.1.1 (B) Cat-III (6))
9.AMTREX 2. OCLEC
SERVO CONTROLLED VOLTAGE STABILIZER& ELECTRONICS 3. PULSE
POWER CONDITIONERS 4. ELLICO
1. GRE (Refer to Ch 2 4, Cat.-II (2)) 5. L.S.
2. GELCO (Refer to Ch.1.1. (B) Cat.-III (6)) CATEGORY - II
3. SUVlK 1. CROMPTON (Refer to Ch 2.3. Cat.-III (4))
M/S SUV[K ELECTRONICS RL. SECTOR NO 28, INDUSTRIAL 2. JYOTI
ESTATE, GANDHINAGAR. 3. AEW
4.KEPREJ 4.PECO
M/S KEPREJ ELECTRONICS, SECTOR NO. 28, INDUSTRIAL M/s. Poco Industries Estate, Nr. Gota Flyover Gota Road,
ESTATE, GANDHINAGAR. Ahmedabad-382481
5 SERVOTECH CATEGORY III
M/S. SERVOTECH POWER SYSTEM PVT LTD. D-212, 1. HAVELL'S (Refer to Ch.1.1. (C) Cat -III (1))
Sector-2, DSIDC, Bawana Indi Area, Delhi. 2. BCH (Refer to Ch 3.4. Cat.-III (3))
6. CONSUL 3. C&S GEWISS (Refer to Ch.1.1, (C) Cat -II (8))
CONSUL CONSOLIDATED PVT LTD 4/329A, Old 4. L & T (Refer to Ch 3.2. Cat-III (4))
MahabalipuramRoad,Chennai - 600041 5. Siemens (Refer to Ch 3.3. Cat.-II (6))
SINGLE PHASE MONO BLOCK PUMPS 7. SUECO
CATEGORY-II POWERAND CONTROL PANEL I PANELACCESSORIES
1. AMIT /Refer to Ch.1.2(13) 1. C&S GEWISS (Refer to Ch.1.1 (C) Cat.-III (8))
2LUBI 2. GELCO (Refer to Ch1.1.(B) Cat-II (9))
B\h Lubi Elect Memco. Naroda Road Ahmedabad 3.TRINITY (Refer to Ch,3 I0 Cat-I (5))
8. UNEEL 4. NIPPEN (Refer to Ch 3.10 Cat-I (1))
M/S UNNATI INOUSTIRAL CORPORATION D-61. Diamond 5.STANDARD (Refer to Ch.2.4. Cat.-II (5))
Park G I D C. Nr Nana Chiloda N H NO 8. Naroda - 6. L&T (Refer to Ch.32 Cat.-III (4))
Ahmedabad - 382330 7. OCLEG (Refer to Ch 2.12. Cat -II (11)
4. PRIMA 8.ELICO -APPROVED
M/s. Prima Pumps P L34 GV.M Au VasanaT Odhav 9, L,S, - APPROVED
Ahmedabad - 382410 10, PRATHAM - APPROVED
5. SABAR 11. SAHIL - APPROVED
M/s SABAR PUMP PVT LTD 3704/A. G I D C Estate Phase - IV 12. MEGAWIN-APPROVED
B/h New Nirma Chemicals vatva Ahmedabad - 382445 13. ACTION /ADHUNIK (Refer to Ch ~2.7 Approved (1))
CATEGORY III M/s. Sky Control System 160, Vikas Estate, Opp Anil Starch Mill
Road Nr Vrma Yojna Hospital Bapunagar Ahm¢dabad
1. CROMPTGN Refer to Ch 2 1 Cat.III(4)
2SIEMENS RefertoOh23. Cat-III(6)
1.CROMPTON (Refer to Ch.2 1. Cat-III (4))
OPEN WELL TYPE HORIZONTAL MONO BLOCK PUMPS
M/s Duke PlastoTechnique PL N.H 14 Deesa Highway
Opp'. Hotel Green Wood, Badarpura. Palanpur -
3.SABAR (Refer to Ch 9. (5))
1. UNEEL Refer to Ch.9(3)
WS JASCO PUMPS PVT LTO 47, Phase -I, G.I.D.C., Mangal
Estate, Naroda, Ahmedabad -
M/sAmit Engineering PL PO No 4141 2ndFIoor, Motilal Centre Nr
Dinesh Hall Ashram Road Ahmedabad -
3AMlT(RefertoCh1.2(13)
1. UNEEL (Refer to Ch.9 (3))
4. LUB (Refer to Ch.9 (2)
2. AMRUT '~Refer te Ch 9 (2)
5.CROMPTON (Refer to Ch.2.3 Cat-III(4)
3. LUBI (RefertoCh9(2))
4. DUKE (RefertoCh.9Cat II (2))
STARTER PANELS [APPROVED]
1. GELCO RefertoCh1.1(B) Cat-III (6)
SUB STATION EQUIPMENTS
M/s SAHIL ELECTRO SYSTEM 163 Vi kas Industrial Estate
Opp Anii Starch Mills Nr Vlmayojna hospital Nutan Mills Road
1BIECCO (Refer to Ch3 5. (Approved)-1)
2.HAVELL'S (Refer toCh 1.1 (C) Cat-III (1))
3. HAVELL'S Referto Ch1.1 (C)Cat-III(1)
4. OCLEG RefertoCh2.12 Cat-(11))
5.L&T Refer to Ch 3.2. Cat III( 4)
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
6. SAMUDRA 5MEGHAWIN
M/S Samudra Power Products, PIot No. 32, Road No, 5/A, 6 PMX
G ID.C. Kathawada, Ahmedabad - 380415 CATEGORY - II
7. SUECO 1. UNIVERSAL
M/s SHREE UMIYA ELECTRICAL CO. 304 SHAILLY HOUSE, M/s Unirversal Power Xmer Ltd. 26/A 2nd Phase,
HARIHAR PARK SOCIETY Nr OLD HIGH COURT, RAILWAY Peenya Industrial Area, Bangalore -
UNDERBRIDGE, NAVRANGPURA, AHMEDABAO - 380009 2. SKP
8. ELLICO CATEGORY - III
CATEGORY - III 1.CROMPTON (Refer to Ch.2 3. Cat.-III(4))
1. C&S GEWISS (Refer to Ch.1.1, (C) Cat-III(8)) 2.L&T(Refer to Ch 32 Cat -III(4))
2. BCH (Referto Ch3.4 Cat-III(3)) 3.KIRLOSKAR
SUBMERSIBLE PUMPS 5C&SEFACCCE
CATEGORY - I TRANSFORMER
M/S ARtHANT PUMPS PVT. LTD., Near Ladbi TRANSFORMER SHOULD COMPLY E.C.B.C, CODE CRITERIA
Nala, Deesa Highway Palanpur- 385 001 1. TRANSFORMER-APPROVED
2. PLUGA-APPROVED MIS Danke Electncars Ltd 778/780 G. IDC Estate,
M/S Shroffs Engineering Limited, 850/2, Weghod~a - 391760, Baroda - Gujarat
G I.DC Estate Makarpura, Vadodara - 390
3. JEE-APPROVED CATEGORY - I
M/S Jee Pumps (Gui,) P.L PIot No L 1 & 2, GIDC Nr. Water Tank, 1. POWERLITE
Odhav - Ahmedabed - 382415 2. INSTA POWER
4. FALCON -APPROVED 3. SHILCHAR
M/s Falcon SubmerSible PL. Survey No 39/4, Vavdi Industiral 4, VARDHMAN ELECTRO-MECH
area gondal road Ralkot –
M/S. Koklla Electricals TB Hoapmtal Road, Viiapur-382770 Dist
4. ARYA-ELECTRONICS (AE)
Plot No 198/1, GIDC-IV SIhor Ghanghali Road, B/h. Sitaram
weight Bridge, sihor Gist Bhavnagar
Raychem. RPG House, 463, Dr. Annie Basant Road,
Worli, Mumba~.40039.
M/s Powelite Electricals PIot No 627, Nr Gayatri Temple,
Phase- 4, G.I.D.C. Estate, Naroda, Ahmedabad -382330
Note:- Other products are supposed to be included as per latest approval of Superintending Engineer,
Electrical (R &B ) Circle Gandhinagar as on or before last date of submission of tender.
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
NEW ITEMS APPROVED
No Name of Company Brand Name Description of Make Remarks
1 M/S Vijayshree Electromech (p) Ltd WELLTECH 1. Swaged Steel Tubular poi /Stel Cat-II
103, vedant complex, 7 Kalpana Society, Octagonal pole / Steel conical pole/GRP
B/h N.V.P.R.O off CG Road, / FRP Pole Approved
Navrangpura,Ahmedabad – 009 2. SMC/DMC Junction bax/G I Race way
-Trunking/GRP Cable Tray/G.I. Cable Tray
2 M/S Bajaj Electricals LimitedAhmedabad BAJAJ 1. High Mast / Octagonal pole / GRP poles Cat -III
/ Decoralive Polesi Conical GI Pole
3 M/sJayCopper&Alloys P.L. ELECTRO-EARTH 1 GalvanizingEarthing[ChemicalBarthing Approved
Plot No 2219, Nr Shah Alloys Ltd., Science - 1/2/3 Mtr
City To 2 Copper Earthing [ Chemical Earthing Approved
Khatraj Road, Village - Santeh - 382721 1/2/5 Mtr
4 M/S Prestolite Corporation (Refer Ch 2.6 PRESOLITE 1 High Mast pole upto 30 Mtr Approved
5 Mis Surya Roshni Ltd Ahmedabad S URYA 1 High Mast / Octagonal Pole Cat. III
6 MIs Kemrook India KEMROK 1 FRP Lighting pole Approved
7 Mis Accurate Eng. LTd. ACCURATE I High Mast / Tower Approved
8 M/s. Sumip Compostes Pvt. Ltd SUMIP 1 FRP Light Pole / FRP Cable Tray / Trefoil Approved
Clamp / Luminaries / FRP Leader
9 Mis.Aster ASTER HIGH Mast Pole Cat II
10 M/S Ammini Eng. System P.L. AMMINI Out Door Street Light Approved
11 M/S GELCO ELECTRONICS P.L. GELCO Motor control cubical panel, Electrical Approved
(Refer. Ch1.1 Cat -III (B) (6)) Starter for A.C. etc
12 Transrail Lighting Ltd TRANSRAIL 1 High mast Pole 2 Street Light Pole Cat III
A-201/209, Boomerang Complex, (Conical / Hexagonal / Octagonal / swage Cat III
ChandivaIi Farm pole)
Road, Andheri [E], Mumbai –
13 M/s Halonix HALONIX 1 Land Scape & Garden Light / High Mast /
(Refer Ch2.1 Cat -III (4)) All type ~uminers Ill
14 M/S, Megawin MEGAWlN # United Sub-Station upto 12kw # Control Approved
relay panels custom built # SF 6 Ring main
units upto 36 kv # Auto reclosers &
capacitor switch upto 36 kv # Air insulated
load break switchgear upto 36 kv # Metal
porcelain clad VCB switchgear upto 36 kv
15 M/s. THRON LIGHTING THRON Street Light / Landscape & Garden Light III
C/o 10, ParshwanathAptt Somnath Park
Lane, Opp. Tole Exchange Sahibaug,
Ahmedabad-380004
16 M/s. Control & Switchgears Contractors Ltd C&S # Indoor Air insulated Metal Clad III
9th Floor, HERITAGE, Nr. Gui. University, Switchgear with VCB # Compact SF6
Ashram insulated Ring main units for Indoor &
Road, Ahmedabad-380009, Outdoor installation
17 Mis. Keselec Schrader Pvt. LTd SCHREDER # Indoor & Outdoor Decorative Pole & III
69 Friends Colony, West, New Delhi – Bracket # Premium Light Fixture # Furyol
110065 140 w compolis with dimmable electronics
ballast # Contemporary / classic /
Traditional City Lighting # Urban Lighting
# Indirect / direct lighting I free standing Mi
lighters # Compact recessed & surface
mounted luminaries # Modular recessed &
surface mounted luminaries#Wall ceilin
& pendent mounted luminaries # Row
lighting system # Spot Lighting & track
system #Luminaires with increased IP
rating & special luminaries # Emergency
Luminaries / Outdoor luminaries # Access
cries & light sources
18 M/s. Regent Beleuchtungs Korper AG REGENT Description of Make III
Dornacherstrasse
OH 4018 Basel Swizerland
CIo Bharat Becb Corporation,
Abhigam,Opp Dr. House, Nr. Padmal Rly.
Crossing,Ahmedabad.
No Name of Company Brand Name Description of Make Remarks
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
19 M/S Sylvania India Ltd SYLVANIA # Down lighter # Fluorescent Recessed III
ORG Towers 2D Sector 126, Expressway # Florescent surface mounted/suspended
Noida # Spot Lights # Track # Ambient/Decorative
[UP] – 201304 # Pendants # Battens / Trunking system
# High protection # High Bay / Low Bay
# Amenity / Bolla rd # In Ground / wall lights
# Flood light # Pole top
20 M/s Ligman Lighting india Pvt Itd LIGMA # Architeural Outdoor Lighting III
Plot No. 4th Floor, Gulmohar Plaza,
ITl Road,Aundh Pune-411007.
21 M/S Philips India Ltd PHILIPS # Indoor Lfghting # Public Lighting III
M/S Philips Electronics India Ltd System
# Spods Lighting # Urban Decorative
Lighting # Landscape Lighting # Special
Application Lighting # Lighting Control for
Indoor & Outdoor Lighting system
22 M/S ABB (Refer Ch 1.1 (C) Cat III (4) ABB # Composed Substation # Ring Main III
23 M/s. WIPRO WIPRO # High Mast Motorized & Not Motorized III
(Refer Ch-2.1 (C) Cat-III(5) #( Pole - Octagonal, Decorative
Swaged and All type of tubular pole
24 M/S Aspire Composites, Survey No 172, ASPIRE FRP Industrial Lighting Products Approved
Opp Reliance Petrol Pump. Madhapur-
Village Madhapur, Bhuj Kutch
25 M/s REX POLYEXTRUSION LTD, REX # DOUBLE WALL CORRUGATED PiPE Approved
Kumar Plaza,1st Floor, 1077, North # NON THREADABLE COMMUNICATION & ELECT, INST'
Shivajinagar, CONDUIT PIPES
Opp K.W C. College, Sangli -
26 M/s DURA-UNE INDIA PVT LTD, Plot No. 24- DURA -GUARD # Conduit Systems for Electrical installation Approved
25Verna Etectronics City Phased!A, Verna : & Communication tnstaliation Non
Salcete Threadable of size upto 200mm OD
GOA-403722 (North Goa)
27 M/s Trupati Plastomatice Pvt Ltd GEMINI # HDPE Corrugated Sheathing Ducts & HDPE Approved
F-543 Road, No 6 D VKI Area, Jaipur – Double Wall Corrugated Pipe (DWC)
28 M/s Aashcube Lightng PL (Refer, ch.26 Cat.- Aash Cube # Gate / Bollard Light Cat-I
29 M/S Havell's India Ltd, HAVELL's # Hume Free Electronics Regulator Approved
(RefertoCh 1.1 (C) Cat-III(1))
30 M/S GRE Electronics Pvt Ltd Approved
Plot NO 423, G.I.D.C II, Dediyasan GRE # Hume Free Electronics Regulator
31 M/s. GELCO ELIZCTRONICS PVT LTD GELCO # Hume Free Electronics Regulator Approved
(Refer to Ch. 1 1 (B) Cat.-III (6))
32 M/s VALMONT STRUCTURES PL, VALMONT # High Mast, Octagonal Pole, Conical Cat-III
909/910, FILIX LBS Marg, Bhandup (w) Pole,decorative Pole, Stadium Mast
33 M/s MAXCEL PLAST 133, Shree Ram Ind MAXCEL PLAST # YUVA Gang Box, Modular Box, Mudlar Plastic Approved
Estate, Concealed Box, G.I Metal Modular Box, Plastic Fan
B/h C M C.Anum Eng Compound, Nr. Sonis Box, Point Box, Polycarbonate Lamp Holder, Nice
Chawl Holder Plate / Fan Plate Pipe Fitings Accessories
Cross Road, ODHAV, Ahmedabad-382415
34 M/s,THE UNIVERSALAPPLIANCE (India) INDO PLUS # Geyser ISl [Geyuser Metal Approved
Nalagarh Dist Sona (HP) 1,6,10,15,25,Ltr]
# [Geyser ABS 5 Star Rating-15, 25 Itr] Approved
[Geyser ABS [1,6,10, LTdr, 50 Ltd
# Immersion Heater ISI [1.5,2.0 KW] Approved
# Heat Convertor ISI [Super ISI, Super Approved
Dlx IS U Type (HOTAIR ISI)
35 M/s PECO industries,, PECO # HRC Fuse & Fuse Link
(Refer to Ch 9 Cat-II (4))
Signature of Contractor Executive Engineer (Mech.),
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
At Okha Port, Electrification of new constructed administrative building.
GMB may change the internal arrangement accordingly bidder shall change the internal
electrification of office building.
Major Contents of work:-
1. Modular wiring systems.
2. Installation of Indoor profile LED (hanging Type) lighting fixtures, surface LED light &
BLDC ceiling fan in office.
3. Outdoor LED lighting fixtures for the compound.
4. LT main panel and a standby 40 KVA DG set on office building premise.
5. Capacitor bank for power
6. Air conditioning systems
7. Essential electrical fittings such as MCB, MCCB, ELCB, distribution boards (DB),
8. A new electrical connection from PGVCL for the office building & Neessary approval
from electrical inspector.
The contractor has to carry out the said work at Okha Port. Contractor is strongly advised to
visit the site and acquainted himself with the site condition its surrounding etc. in view of
performing the scope of tender.
tender document and should be got approved from EIC. All the items of work must have to
execute as per detailed Specification given in relevant chapter of this tender document. The
entire work should be carried out as per Electrical standard practice & upto satisfaction of
Signature of Contractor Executive Engineer (Mech.),
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
ITEM SPECIFICATIONS
Item No. 1-: MCB DBs.
a) Distribution Board
Distribution boards shall be fabricated from 18 gauge M.S. sheet or shall be
readymade as specified in the Schedule-B. It shall be of Single OR Double door type
with hinged (lockable if required) door suitable for recessed mounting in wall.
Distribution boards shall be powder coated.
The distribution boards shall be provided with phase barriers, wiring channels to
accommodate wires and individual per phase neutral links. There shall be separate or
individual earth link as per requirement. Proper arrangement shall be made for
mounting of MCB’s and other accessories.
Distribution boards shall meet with the requirements of relevant I.S. standards.
Bus bars shall be suitable for the incoming switch rating and sized for a temperature
rise of 35° C over the ambient. Each board shall have two separate earthing terminals.
Circuit diagram indicating the load distribution shall be pasted on the inside of the DB
as instructed. One earthing terminal for single phase and two terminals for 3 phase
DB's shall be provided with an earth strip connecting the studs and the outgoing earth
The top and the bottom faces of the D.B. shall be provided for conduit entry of
minimum 1” dia. The faces if asked shall be kept detachable.
All outgoing feeders shall terminate on a terminal strip which in turn is interconnected
to the MCB/Fuse base by means of insulated single conductor copper wires as follows
The D.B. shall be properly grouted in the wall in concealed manner taking care that
the powder coating is not scratched and dents are not formed on the D.B. The MCBs
and ELCBs. In the distribution boards shall be fixed as per the circuit details provided.
All the wires terminating in the MCBs and the ELCBs shall be lugged for proper contact
and ferrules depicting the circuit nos shall be provided. D.B.s mounted in concealed
manner shall have a groove around it so as to save the finish of the plaster and colour
during future opening of the door. The distribution boards shall have circuit chart
tagged back side of the door for future maintenance.
MODE OF MEASUREMENT
The distribution boards shall be measured in nos and the MCBs and ELCBs shall be
measured in numbers separately.
Item No. 2: RCCB / ELCB
The RCCB should suffices all the requirements of relevantIS codes and as specified in
Schedule-B. The RCCB should be current operated and not on line voltage.
The RCCB should ensure mainly the following functions:
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
i) All metal parts should be inherently resistant to corrosion and treated to make
them corrosion resistant.
ii) It should be truly current operated.
iii) It should operate on core balance torroidal transformer.
iv) Its accuracy should be ± 5 %.
v) It should operate even in case of neutral failure.
vi) It should trip at a present leakage current within specified limit.
vii) Its enclosure should be as per IP
viii) It should provide full protection as envisaged by IE rules
ix) It should conform to all national and international standards like IS
Payment will be made on per No. basis.
Item No. 3 to 6: VARIOUS MCBs. SP, FP, DP
a) MINIATURE CIRCUIT BREAKER (MCB):
Miniature circuit breakers shall be quick make and break and break type conform with
relevant IS Standards. The housing of MCBs shall be heat resistant and having high
impact strength. The MCBs shall be flush mounted and shall be provided with trip free
manual operating mechanism with mechanical "ON" and "OFF" indications.
The circuit breaker dollies shall be of trip free pattern to prevent closing the breaker
on a faulty current.
The MCB contact shall be silver nickel and silver graphite alloy and tip coated with
silver. MCB's shall be provided with magnetic fluid plunger relay for over current and
short circuit protection. The over load or short circuit devices shall have a common
trip bar in the case of DP and TPN miniature circuit breakers. All the MCB's shall be
tested and certified as per Indian Standard, prior to Installation.
Payment will be made on per No. basis.
Item no.7, 13,17 to 21 & 24: VARIOUS POINT WIRING, MAINS, PVC CONDUIT & LAYING
These all items installations are as specified in R&B Electric Tender documents from
Page No. 28 to 40. And from Pg.48 to 57. In Specification segment.
Furthermore, the agency should undertake necessary minor civil work to facilitate
smooth concealed wiring and restore the wall surface to its original condition.
Agency should have to co-ordinate with main civil contractor for execution work
Payment will be made on per No. OR per Mtr basis as specified in Sc-B
Item No. 8: EXHAUST FAN
Item consists Supplying & erecting approved make low noise decorative exhaust fan
having size 200mm with 1350 RPM with square frame ABS body with inbuilt lowers &
The exhaust fan shall be installed complete with GI mounting frame/ ring, G.I. louvers,
wire mesh and plug at the end of the cord including wiring & earthing etc. Proper
earthing shall be provided to the fixtures.
Payment will be made on per No. basis.
Item No. 9 : bracket fan
Item consists Supplying & erecting approved make oscillating type bracket fan A.C.
23OV. 50cy/s 400/450 mm sweep wall mounted with height adjustment and rotary
tilting device complete with guard, flexible Core plug top complete erected with lead
wires as directed G.I. louvers, wire mesh and plug at the end of the cord including
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
wiring & earthing etc. Proper earthing shall be provided to the fixtures. Payment will
be made on per No. basis.
Item No. 10, 60, 62: VARIOUS LED FITTINGS
Item consists Supplying and Erectioning LED tube light/ street light / Flood light Fitting
as specified in Schedule-B . The important specifications are as under.
IMPORTANT FEATURES
(i) The luminaires shall have a sturdy and corrosion resistant high pressure Die cast Aluminium
housing with weatherproof gasket for lamp and control gear accessories. The Housing shall be
Epoxy coated, without any cracks or thorough holes, made in a single piece of die-cast LM6
aluminium alloy. The luminaries shall be totally enclosed, dust tight and water proof.
(ii) Heat sink used should be aluminium extrusion having high conductivity. The dimensions of
luminaries shall be optimum and adequate to permit sufficient heat dissipation, through the body
itself, so as to prevent abnormal temperature rise inside the lantern and consequential damage
to the cover and gasket materials, LEDs, lenses and electronic drivers. Heat sink must be
thermally connected to MCPCB/ LED light source.
(iii) The luminaire housing shall be suitable for termination of Cable with @1 mtr copper wire .
(iv) The luminaires shall be provided with high tensile heat resistant toughened glass of minimum
0.8mm thickness or UV resistant polycarbonate cover fixed with stainless steel screws.
(v) An extruded silicon loop gasket shall be provided in the lantern body to ensure a weather
proof seal between the cover and the metal housing to exclude the entry of dust, water, insects,
etc. Luminaire should conform to degree of protection of IP 65 or above. Full glass luminaire is
not accepted as toggles/ clamps are used which will compromise the IP of the luminaire.
(vi) Year of Manufacture, Batch No., Serial Number or Identification No., Luminaire Manufacturer
’s Name/ Logo, Wattage and Frequency should be embossed OR engraved on the LED housing.
(vii) The luminaires, should conform to the various National standards for safety & performance.
Manufacturer should provide test reports as per LM 79 & LM80.
(viii) The electrical component of the LED and LED driver must be suitably enclosed in sealed unit
to function in environment conditions mentioned earlier. It shall not be acceptable where single
luminaire is split into two parts and driven by double drivers.
(ix) All the connecting wires inside the Luminaire shall be low smoke halogen free, fire retardant
(x) Adequate protection against Overloading, Short Circuit, Over Voltage, Over temperature,
Under Voltage, shall be provided within the luminiare.
(xi) All the material used in the luminaries shall not contain any toxic material/ metal like
mercury; shall be halogen free and fire retardant confirming to relevant standards.
(xii) The control gear shall comply with the provisions of relevant IEC as appropriate.
Warranty: 1(one) year minimum (after installation and put on working on site) for piece
to piece replacement of same company OR equivivelent approved Co. Made in India only.
Online purchase products are not accepted.
PREFERABLE MAKE:
HAVELL’S INDIA / WIPRO /PHILIPS /SYSKA /BAJAJ /CROMPTON/SURYA
Item No.11 : Suspension LED Light
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
The LED indoor fittings shall be supplied and erected with LEDs having a wattage range
of 0.2W to 0.5W, assembled on a single Metal Core Printed Circuit Board (MCPCB),
with housing made of aluminum pressure die-cast, white powder coated with high UV
and corrosion resistance. The diffuser shall be housed in an aluminum-casted body
with the company's mark/name, operating at 160V to 270V, with a Power Factor > 0.9,
Total Harmonic Distortion (THD) < 15%, Color Temperature (CCT) of 3000K to 6500K,
Luminaire Efficacy > 85 lumens/watt, and LED driver efficiency > 85%. The fittings shall
have LM-79 and LM-80 certificates. Suspension-Type LED Light Fitting with Stainless
Steel (SS) Wire mounting, 36W to 40W capacity, and 4 feet long with internal driver
with conforms to IS 10322 part 5/sec 1
The lighting fixture should be suitable for installation on an RCC ceiling with a
suspension system consisting of SS wire (Grade 304) that allows for quick on-site
adjustments. The fixture should be suspended 1.5 to 2 feet from the RCC ceiling.
Item No.12 : CALL BELL
Item consists Good quality make Decorative call bell Ting-tong box type 250 volts
complete erected on PVC board, with Connection complete. Payment will be made on
Item no 14: BLCD ceiling fan
Supply, Installation, Testing and Commissioning of suitable sweep, BEE 5 Star rated,
Ceiling fan with Brush Less Direct Current (BLDC) permanent ferrite magnet Motor,
class of insulation: B, Rust free 3 nos.Aluminium blades, 2 nos. canopies, shackle kit
with earthing provision, copper winding, Power factor not < 0.9, Service Value
(CMM/W) minimum 6.85, Air delivery minimum 215 CMM, 350 RPM,230v (tolerance
as per IS : 374-2019), THD < 10%, with remote unit for Speed Control and all remaining
accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C
(Max.), suitable for 140 to 285 Voltage and rectifier circuit with surge, over current
and overload protection , 50 Hz, Single phase AC Supply, earthing etc. Complete as
required.[ Make shall be approved by Engineer in Charge] (B) 1200 mm Sweep (48")
Item No. 15 & 16: FAN HOOK & BOX
This item consist is as specified in R&B Electric Tander documents from Page No.
In Specification segment. The related Fan Hook should be of 10 mm M.S. Round bar
grouted in RCC slab with making the site as original. Load bearing cap should be min.
75 kg. Payment will be made on per No. basis.
Item no 26: supplying and installation of Air conditioner system.
Providing and erecting Inverter based approved make split air-conditioning unit
consisting of condensing unit with variable speed fan motor, inverter type hermetically
sealed rotary compressor with accessories etc. duly connected separately erected
evaporating unit and blower motor with its accessories by means of extra supplied
proper insulated copper tubing,drain PVC pipes suitable for ( cost includes Eco Friendly
green gas charging and 15A plug top & Remote Control & MS Stand) with necessary
Construction of administrative office building at port Okha Part-3 Electrification .2025-26
Payment will be made on per No. basis
Item no 33 SITC of 40 KVA DG
SITC of 40 KVA DG Set at office building along with LT cabling works & all other relevant
work as mentioned in Price Bid- Schedule-B. This document along with standard specifications,
and installation standards and other related drawings / documents in this package will form part
of the contractor's scope of work.
DETAILED SCOPE OF WORK:
1. This specification covers the design, manufacture test at works, supply,
installation testing and commissioning of 40 KVA air/water cooled Diesel
Generating set complete with all accessories like, starting batteries, standard
control panel, interconnecting cable, tank, coolant/ exhaust pipes as required at
Site, silencer, anti vibration mountings, Minor Civil work etc. with guarantee
of complete system for one year. & with obtaining all necessary certificate
from Electrical Inspector. The Capacity and Ratings of DG sets are as below.
Continuous Rating of 40 KVA (CPCB IV+).( As per Item Description.)
The contractor shall install the DG set office building premises or as per the
direction of EIC.
2. STANDARD:- The generating set shall be designed, manufactured and tested in
accordance with the latest and preveling revision of Indian standards.
3. GENERAL:- The generating sets shall be robust in construction factory tested
and assembled to ensure perfect alignment of Engine and Alternator on a
common base frame.
4. DIESEL ENGINE:- The engine shall be Air/water cooled type, developing the
rated Horsepower at a speed of 1500 rpm. The engine shall be provided with an
Hour meter to record the hours of operation.
4.1 Starting:- The engine starting shall be by means of totally enclosed axial type
electric starter suitable for 12/24 volts DC. The DC supply shall be derived
from a heavy duty 12 volts maintenance free battery.
4.2 fuel indication: it should have digital fuel indication from fuel tank.
In case of water cooled Engine, an engine driven centrifugal pump shall be employed
to circulate the coolant through a cooling radiator with an axial blower fan. A
temperature gauge shall be provided with contacts for stopping the engine on high
Pressure lubricating oil system with an engine driven pump shall be provided to cover
to complete engine, with built in oil coolant heat exchangers. Full foam filters
removable elements shall be provided and these shall be located at easily accessible
location for ease of maintenance. The supply shall include first filling of lubricating oil.
An oil pressure gauge shall be provided to monitor the lubrication oil pressure. The
gauge shall be provided with contacts for stopping the engine on failure of lubricating
The governor shall be of electronic type suitable for monitoring constant engine speed
within the specified limits.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender paper of Office Building Okha (2nd attempt).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .