Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC | ₹27.5 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹28.6 LRejected-Finance | ₹28.6 L | L2 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| 3 | L3₹31.4 LRejected-Finance | ₹31.4 L | L3 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| 4 | L4₹31.7 LRejected-Finance | ₹31.7 L | L4 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| 5 | L5₹32.4 LRejected-Finance | ₹32.4 L | L5 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | BEYLIM INFRA L11 | Nikhat nirman L5 | M.A. MUNSHI AND CO. L2 | HINDUSTAN TRADING COMPANY L10 | M/S Dharam Chand Lal Chand Jain L4 | SN TECHNO CONSTRUCTIONS L7 | Savitri Enterprises L6 | M/s Natural Group L3 | PANWAR ELECTRICALS L8 | POOJA CONSTRUCTION CO L9 | shree technology L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) having RPM not less than 1500, sanding pad of 80 grit having dia of 7" /9" to make free from dust, loose paint etc by skilled labour complete all as specified and directed. | 3,500 | Sqm | 30 ₹1,05,000 | 5 ₹17,500 | 8 ₹28,000 | 25 ₹87,500 | 15 ₹52,500 | 10 ₹35,000 | 5 ₹17,500 | 15 ₹52,500 | 20 ₹70,000 | 6 ₹21,000 | 10 ₹35,000 |
| 2.00 | M & L for water proof cement based putty @ 1 kg (undiluted) per Sqm of average thickness 1mm over the plastered/ old prepared painted surface of wall and sanding of the putty surface with mechanical wall sander (having mechanical vaccum mechanism) having RPM not less than 1500, sanding pad of 240 grit or above to make the surface free from dust etc by skilled labour as per the following steps:-
Step 1 :- Mix the putty powder by adding water as per manufacturer's instruction and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute.
Step 2 :- Apply the first coat of the prepared mixer with the help of fully automatic airless spray machine of putty application finishing the surface even and smooth in level without any undulations.
Step 3 :- Allow 6-8 hrs time to dry the putty surface | 750 | Sqm | 150 ₹1,12,500 | 100 ₹75,000 | 50 ₹37,500 | 85 ₹63,750 | 60 ₹45,000 | 60 ₹45,000 | 100 ₹75,000 | 60 ₹45,000 | 90 ₹67,500 | 105 ₹78,750 | 80 ₹60,000 |
| 3.00 | M & L for one coat of acrylic water based exterior grade primer @ 0.9 litre (undiluted)/ 10sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine and allow 6-8 hours to dry the surface for painting of subsequent coats complete all as specified and directed. | 3,500 | Sqm | 40 ₹1,40,000 | 150 ₹5,25,000 | 15 ₹52,500 | 115 ₹4,02,500 | 40 ₹1,40,000 | 60 ₹2,10,000 | 125 ₹4,37,500 | 50 ₹1,75,000 | 90 ₹3,15,000 | 105 ₹3,67,500 | 90 ₹3,15,000 |
| 4.00 | M & L for water based premium acrylic smooth exterior emulsion of approved colour with silicon additive excellent dirt pickup resistance with low VOC less than 50, Antifungal / Anti Algai properties in two coats @ 1.79 litre (undiluted) / 10 Sqm diluted with water as per manufacturer's instruction applied over primed surface with fully automatic airless spray machine of paint application with a flow speed of minimum 1 litre per minute having a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface in between subsequent coats of paint complete all as specified and directed.
Note for item No. 1 to 4 :-
The work for periodical services shall include the following and the rates quoted by the bidders shall include the same :-
(a) The work pertaining to periodical services shall be executed by the contractor as per MoU from authorised applicator through manufacturer of the materials like Exterior Emulsion paint, putty etc after approval by the GE.
(b) The Contractor shall submit the documents under "Memoradum of Understanding" (MOU) with at least one of the manufacturers mentioned in the contract, before the execution of work.
(c) Use of Scaffolding, trestles, ladders, cradles etc necessary for execution of work and protective measures.
(d) Removing of Nails, making good holes, cracks etc
(e) Work in patches and in narrow / widths, bands, cornices, pilasters etc and cutting in edge of line where necessary.
(f) Spreading and removing covering to doors, windows, floors, fittings etc to protect them from splashes.
(g) Washing floors, cleaning glass, joinery , electric fittings , wirings etc. Drops and splashes of paint to be cleaned to the entire satisfaction of Engineer-in-Charge.
(h) Sample patch of 10Sqm be prepared considering all the items of periodical and shall be got approved from GE prior to carrying out further work. | 3,500 | Sqm | 175 ₹6,12,500 | 250 ₹8,75,000 | 100 ₹3,50,000 | 140 ₹4,90,000 | 90 ₹3,15,000 | 80 ₹2,80,000 | 205 ₹7,17,500 | 150 ₹5,25,000 | 145 ₹5,07,500 | 205 ₹7,17,500 | 140 ₹4,90,000 |
| 5.00 | Taking down cement or cement lime plaster on brick or stone or or concrete surface including racking out joints hacking for key scrubbing down with water etc complete all as specified and directed.. | 750 | Sqm | 50 ₹37,500 | 10 ₹7,500 | 28 ₹21,000 | 20 ₹15,000 | 50 ₹37,500 | 60 ₹45,000 | 10 ₹7,500 | 15 ₹11,250 | 20 ₹15,000 | 35 ₹26,250 | 10 ₹7,500 |
| 6.00 | M & L for 15 mm thick rendering in CM 1:6 on other than fair faces of brick or stone walls or concrete surfaces and finishing surface even and smooth w/o using extra cement complete all as specified and directed. | 300 | Sqm | 400 ₹1,20,000 | 200 ₹60,000 | 250 ₹75,000 | 225 ₹67,500 | 350 ₹1,05,000 | 350 ₹1,05,000 | 250 ₹75,000 | 240 ₹72,000 | 320 ₹96,000 | 260 ₹78,000 | 250 ₹75,000 |
| 7.00 | M&l for rendering 15 mm thick ( consist of 10mm thick plaster initial layer in CM 1:6 and second layer of 5mm thick in CM 1:4 ) on fair face of brick or stone work or concrete surfaces of wall and upper layer or top surface finishing even and fair mixed with liquid water proofing compound as per manufacturer's instruction, complete all as specified and directed.
Note: Water proofing compound shall be measured & paid separately. | 125 | Sqm | 410 ₹51,250 | 300 ₹37,500 | 270 ₹33,750 | 250 ₹31,250 | 550 ₹68,750 | 450 ₹56,250 | 330 ₹41,250 | 260 ₹32,500 | 330 ₹41,250 | 360 ₹45,000 | 240 ₹30,000 |
| 8.00 | M & L for 10 mm thick rendering in CM 1:3 on other than fair faces of stone or concrete ceiling surfaces, finished even and smooth w/o using extra cement complete all as specified and directed. | 325 | Sqm | 450 ₹1,46,250 | 300 ₹97,500 | 280 ₹91,000 | 225 ₹73,125 | 350 ₹1,13,750 | 300 ₹97,500 | 330 ₹1,07,250 | 220 ₹71,500 | 330 ₹1,07,250 | 360 ₹1,17,000 | 260 ₹84,500 |
| 9.00 | Supply only liquid water proofing compound complete. | 15 | Ltr | 100 ₹1,500 | 50 ₹750 | 70 ₹1,050 | 55 ₹825 | 150 ₹2,250 | 5,000 ₹75,000 | 50 ₹750 | 65 ₹975 | 65 ₹975 | 120 ₹1,800 | 100 ₹1,500 |
| 10.00 | M&L for keyed pointing to square rubble masonary jodhpur type reqular course in CM 1:4 including racking out joint/pointing to square rubble masonary jodhpur type reqular coursed built in any mortar all as spd | 85 | 10Sqm | 1,500 ₹1,27,500 | 1,000 ₹85,000 | 850 ₹72,250 | 850 ₹72,250 | 1,100 ₹93,500 | 1,500 ₹1,27,500 | 1,005 ₹85,425 | 950 ₹80,750 | 1,000 ₹85,000 | 1,010 ₹85,850 | 600 ₹51,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
5 May 2026, 6:00 pmClosed
GE (ARMY) NO 2 JODHPUR
Military Engineer Services, Garrison Engineer (Army) No 2 Jodhpur, Multan Lines, Army Area Jodhpur -342010
PERIODICAL SERVICES TO OTM MD ACCN IN THE AOR OF AGE BR I OF GE (A) NO 2 JODHPUR
2026_MES_759357_1
8800/26-27/02/E8
Open Tender
Civil Works
180 days
GE (ARMY) NO 2 JODHPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (ARMY) NO 2 JODHPUR
₹80,000
Yes
30 Jun 2026
7 Apr 2026
7 May 2026
7 Apr 2026
5 May 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) having RPM not less than 1500, sanding pad of 80 grit having dia of 7" /9" to make free from dust, loose paint etc by skilled labour complete all as specified and directed. | - | Sqm | - | - |
| - | M & L for water proof cement based putty @ 1 kg (undiluted) per Sqm of average thickness 1mm over the plastered/ old prepared painted surface of wall and sanding of the putty surface with mechanical wall sander (having mechanical vaccum mechanism) having RPM not less than 1500, sanding pad of 240 grit or above to make the surface free from dust etc by skilled labour as per the following steps:-
Step 1 :- Mix the putty powder by adding water as per manufacturer's instruction and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute.
Step 2 :- Apply the first coat of the prepared mixer with the help of fully automatic airless spray machine of putty application finishing the surface even and smooth in level without any undulations.
Step 3 :- Allow 6-8 hrs time to dry the putty surface | - | Sqm | - | - |
| - | M & L for one coat of acrylic water based exterior grade primer @ 0.9 litre (undiluted)/ 10sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine and allow 6-8 hours to dry the surface for painting of subsequent coats complete all as specified and directed. | - | Sqm | - | - |
| - | M & L for water based premium acrylic smooth exterior emulsion of approved colour with silicon additive excellent dirt pickup resistance with low VOC less than 50, Antifungal / Anti Algai properties in two coats @ 1.79 litre (undiluted) / 10 Sqm diluted with water as per manufacturer's instruction applied over primed surface with fully automatic airless spray machine of paint application with a flow speed of minimum 1 litre per minute having a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface in between subsequent coats of paint complete all as specified and directed.
Note for item No. 1 to 4 :-
The work for periodical services shall include the following and the rates quoted by the bidders shall include the same :-
(a) The work pertaining to periodical services shall be executed by the contractor as per MoU from authorised applicator through manufacturer of the materials like Exterior Emulsion paint, putty etc after approval by the GE.
(b) The Contractor shall submit the documents under "Memoradum of Understanding" (MOU) with at least one of the manufacturers mentioned in the contract, before the execution of work.
(c) Use of Scaffolding, trestles, ladders, cradles etc necessary for execution of work and protective measures.
(d) Removing of Nails, making good holes, cracks etc
(e) Work in patches and in narrow / widths, bands, cornices, pilasters etc and cutting in edge of line where necessary.
(f) Spreading and removing covering to doors, windows, floors, fittings etc to protect them from splashes.
(g) Washing floors, cleaning glass, joinery , electric fittings , wirings etc. Drops and splashes of paint to be cleaned to the entire satisfaction of Engineer-in-Charge.
(h) Sample patch of 10Sqm be prepared considering all the items of periodical and shall be got approved from GE prior to carrying out further work. | - | Sqm | - | - |
| - | Taking down cement or cement lime plaster on brick or stone or or concrete surface including racking out joints hacking for key scrubbing down with water etc complete all as specified and directed.. | - | Sqm | - | - |
| - | M & L for 15 mm thick rendering in CM 1:6 on other than fair faces of brick or stone walls or concrete surfaces and finishing surface even and smooth w/o using extra cement complete all as specified and directed. | - | Sqm | - | - |
| - | M&l for rendering 15 mm thick ( consist of 10mm thick plaster initial layer in CM 1:6 and second layer of 5mm thick in CM 1:4 ) on fair face of brick or stone work or concrete surfaces of wall and upper layer or top surface finishing even and fair mixed with liquid water proofing compound as per manufacturer's instruction, complete all as specified and directed.
Note: Water proofing compound shall be measured & paid separately. | - | Sqm | - | - |
| - | M & L for 10 mm thick rendering in CM 1:3 on other than fair faces of stone or concrete ceiling surfaces, finished even and smooth w/o using extra cement complete all as specified and directed. | - | Sqm | - | - |
| - | Supply only liquid water proofing compound complete. | - | Ltr | - | - |
| - | M&L for keyed pointing to square rubble masonary jodhpur type reqular course in CM 1:4 including racking out joint/pointing to square rubble masonary jodhpur type reqular coursed built in any mortar all as spd | - | 10Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_850547.xls
BOQ • 0.35 MB
tenderdocu.pdf
Tender Documents • 1.04 MB
Download all tender documents and submit your bid