| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAccepted-AOC H NO 2 220 JAGGARAM ASWAPURAM BHADRADRI KOTHAGUDEM DIST TELANGANA 507116 | ASWAPURAM | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | ₹47.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹48.3 L+₹44,620 (0.93%)Rejected-AOC D NO 7 1 332 220KV SUBSTATION ROAD AMBEDKAR CENTER BANDARUGUDEM BHADRADRI KOTHAGUDEM DIST 507117 TELANGANA INDIA | BHADRADRI KOTHAGUDEM | TELANGANA | 507117 | ₹48.3 L+₹44,620 (0.93%) | L2 | Rejected-AOC L2 |
| 3 | L3₹49.8 L+₹1.9 L (4.00%)Rejected-AOC H NO 3 194 OPP HWP M COLONY GATE ASWAPURAM POST 507116 BHADRADRI KOTHAGUDEM DIST | ASWAPURAM | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | ₹49.8 L+₹1.9 L (4.00%) | L3 | Rejected-AOC L3 |
| 4 | L4₹51.3 L+₹3.4 L (7.20%)Rejected-AOC H NO 3 52 CHAVITI GUDEM ASWAPURAM MANDAL BHADRADRI KOTHAGUDEM DIST 507 116 TELANGANA INDIA | BHADRADRI KOTHAGUDEM | TELANGANA | 507116 | ₹51.3 L+₹3.4 L (7.20%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | naresh constructions L1 | Sri Bhargavi Engineering Works L4 | SHRAVANI CONSTRUCTIONS L3 | M/s AYESHA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of flexible Bituminous pavements by mechanical means and disposal of dismantled material up to a lead of 1 Km all complete as per specifications and as directed by Engineer in Charge. | 70 | Cum | 450 ₹31,500 | 480 ₹33,600 | 2,000 ₹1,40,000 | 400 ₹28,000 Lowest |
| 2.00 | Rolling and compacting sub grade including dressing to camber, making good the undulations, watering and rolling by 8 Ton power road roller as per specification and direction of Engineer-in Charge | 1,360 | Sqm | 13 ₹17,680 | 25 ₹34,000 | 150 ₹2,04,000 | 10 ₹13,600 Lowest |
| 3.00 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete road work, using cement content as per approved design mix, including laying cost of centering,shuttering,finishing and but excluding reinforcement,including admixtures in recommended proportions as per IS:9103 to accelerate,retard setting of concrete,improve workability without impairing strength and durability as per direction of Engineer-in-charge (Note:- minimum cement content to be used in this item is @350kg/cum).including cleaning,repairs to pot holes of the road with lean concrete,form work, ramming, levelling,curing,including provision of Expansion joints of 12mm width x 100/120 mm depth@ every 6 meter length or as directed by EIC,one longitudinal joint in center of the pavement and contraction joints at every 4 meter of size 5mm width and 50mm deep (across every 4mtrs of size 5mm width and 50mm depth (across the full width of pavement/road), including necessary dressing, removal of debris/foreign materials,levelling inequalities,disposal of excess earth,debris /rubbish within the colony premises with all leads and lifts etc complete as per specifications and as directed by the EIC. | 160 | Cum | 10,800 ₹17,28,000 | 12,500 ₹20,00,000 | 10,500 ₹16,80,000 Lowest | 11,000 ₹17,60,000 |
| 4.00 | Providing, laying and fixing in position TMT reinforcement bars of grade Fe 415/ 500 of TATA/ JINDAL/ SAIL/ VIZAG or equivalent make for RCC works, including cost of supplying, cutting, bending, transporting, erecting, binding with 18 gauge MS annealed wire, cement mortar spacer blocks etc., all complete as per specifications and as directed by the Engineer. | 4,800 | Kgs | 110 ₹5,28,000 Lowest | 120 ₹5,76,000 | 112 ₹5,37,600 | 115 ₹5,52,000 |
| 5.00 | Cutting of grooves on concrete /surface within 48 Hours (preferably within 6 to 18 Hours), after completion of laying of concrete, using a power driven concrete cutting machine with diamond studded saw, complete and as directed. Width of grooves 3 to 4mm & depth - 1/3 rd of pavement thickness (33 to 42mm) @ spacing of 1.5 to 2.5 mtr (square panels) with all tools, tackles, machinery, manpower etc. complete as per specifications and as directed by the Engineer. | 480 | Rm | 60 ₹28,800 | 55 ₹26,400 | 50 ₹24,000 Lowest | 60 ₹28,800 |
| 6.00 | Earth work excavation in foundations in all kinds of soil up to 1.5 mtrs depth including getting out the excavated soil, refilling selected excavated earth around foundation and plinth in layers not exceeding 200mm thickness leveling, watering, ramming, consolidating and disposal of surplus earth with in a lead of 50 M, lift upto 1.50 M, leveling and neatly dressing of the disposed earth etc. complete as per specifications and as directed by the Engineer. | 280 | Cum | 315 ₹88,200 | 350 ₹98,000 | 400 ₹1,12,000 | 300 ₹84,000 Lowest |
| 7.00 | Providing and laying Brick masonry work with non modular Fly ash bricks with CM 1:6 (1 Cement : 6 Coarse sand) using 43 grade OPC cement of ACC/ Ultratech/ Birla A1 or any other approved make conforming to IS:12894, class designation 10 average compressive strength up to plinth level etc., all complete as per specifications and as directed by the Engineer in Charge. | 5 | Cum | 8,000 ₹40,000 | 7,300 ₹36,500 Lowest | 9,000 ₹45,000 | 8,000 ₹40,000 |
| 8.00 | Providing and laying 12mm thick cement plaster of 1:4 (1cement : 4 fine sand) 43 grade OPC cement of ACC/ Ultratech/ Birla A1 or any other approved make, upto plinth level over a brick work/ concrete wotk to give even smooth finish where ever required and curing etc., all complete as per specifications and as directed by the Engineer in Charge. | 40 | Sqm | 365 ₹14,600 | 450 ₹18,000 | 450 ₹18,000 | 350 ₹14,000 Lowest |
| 9.00 | Providing and filling in position bitumen mix filler of proportion 80 kg. of hot bitumen, 1 kg. of cement and 0.25 cubic metre of coarse sand for expansion joints of width 12mm and depth upto 150 mm complete all as per manufacturer specifications and as directed by the Engineer in Charge. | 0.15 | Cum | 27,000 ₹4,050 | 31,000 ₹4,650 | 3,000 ₹450 Lowest | 25,000 ₹3,750 |
| 10.00 | Provinding and laying of 125 microns thick impermeable polythene separation membrane under cement concrete floor including the all material and labour, tools and tackles etc., complete all as per manufacturer specifications and as directed by the Engineer in Charge. | 230 | Kgs | 165 ₹37,950 | 190 ₹43,700 | 200 ₹46,000 | 140 ₹32,200 Lowest |
Tender Value
₹45.8 L
EMD Value
₹91,680
Closing Date
18 Dec 2025, 6:00 pmClosed
General Manager HWPM
O/o General Manager HWPM, Aswapuram Bhadradri Kothagudem, Telangana-507116.
Repair of storm water drains and Laying of RCC roads for A3, A4, A5 and A6 clusters at HWPM Colony.
2025_HWB_887761_1
HWPM/CIVIL/COL/NIT/2025/35
Open Tender
Civil Works
Item Rate
180 days
HWPM Colony
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹91,680
28 Mar 2026
29 Nov 2025
26 Dec 2025
4 Dec 2025
18 Dec 2025
4 Dec 2025
4 Dec 2025 - 15 Dec 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
1.37 MB
Additional Documents
Additional Documents • 0.23 MB
BOQ
BOQ • 0.30 MB
Tender Documents
Tender Documents • 13.84 MB
Additional Documents
Additional Documents • 0.95 MB
Additional Documents
Additional Documents • 0.62 MB
Additional Documents
Additional Documents • 24.43 MB
Additional Documents
Additional Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .