Repairing R.C.C. Beick Masonary and Iron Gate and Const. New Gate at diff. places under Muni.Counsilor, M.P., M.L.A. and 70:20:10 Budget in Khadia Ward
347590
Central Zone E-Tender Notice No.07/2026-2027 Tender No.251
Open
Civil Works - Others
Works
Ahmedabad
₹2,400
Municipal Commissioner, Ahmedabad
₹99,991
23 Sept 2026
23 Sept 2026
23 Sept 2026
28 Sept 2026
23 Sept 2026
Name of work: - Ftrzgt Jtzu obtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht
MþaJJtbtk ytJlth ftbtu <&t yLg csux vife sw>e sw>e vtu¤tlu yth.me.me. <&t c{ef buNlhelt <&t jtuFkzlt dux hevuh fhJt
<&t lJt cltJJtlt ftb ctc<.
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate
sealed tenders from interested contractors for the following work at different locations within
the limit of A.M.C.
1 Name of work Ftrzgt Jtzu obtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je
<uytu îtht MþaJJtbtk ytJlth ftbtu <&t yLg csux vife sw>e sw>e vtu¤tlu t
yth.me.me. <&t c{ef buNlhelt <&t jtuFkzlt dux hevuh fhJt <&t lJt cltJJtlt
2 Estimated Tender Amount Rs. 99,93,137.00 (excluding of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs. 2400/-
(Non refundable) (Demand Draft in favour of Municipal Commissioner,
Ahmedabad) Tender Fee shall be submitted physically along
with the Physical Submission.
4 Time Limit 12 Months (Excluding Moonsoon)
5 Download of Tender Tenders from the website www.nprocure.com or shall be
Documents down loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “D” class having in Road Works in PWD in Govt. R&B /
CPWD / AMC or equivalent register with any other state Govt.
or institutions.
7 Earnest Money Deposit Rs.99,991.00(Demand Draft / pay order / Bank Guarantee in
(Bid security) favour of Municipal Commissioner, Ahmedabad is to be
(1 % of Estimate put to submitted as prescribed in 10.0 below. Demand Draft/Bank
tender) Guarantee shall be from approved list of AMC of banks and the
issuing branch of bank guarantee shall be of Ahmedabad city
only and it should be valid for 120 days. E.M.D. shall be
submitted physically along with the Physical Submission.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with
Tender Fees tender documents as described in the invitation of tender
should be submitted to Assistant Manager- Central Zone, 3rd
Floor, B – Wing, Sardar Patel Bhavan, Danapith, Ahmedabad-
Bid submitted without bid security & tender fee shall be
treated as non responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on
www.teder.nprocure.com website as per Schedule mentioned in
Notice inviting Tender.
• Tender Fee, EMD, technical bid and other relevant PQ
Documents as per check list given in tender shall be submitted
physically in two copies (Original & duplicate) in sealed envelope as
per Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum. The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
Signature of Bidder Page 1 of
Ahmedabad Municipal Corporation
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall
fill percentage rate on amount of BOQ online only until
Price Bid shall be submitted physically duly signed & seal
without mentioning quoted rated, else it shall be considered as
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft
/ pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular. and
the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
18 Penalty Clauses As Per SLA Clause,attached in Tender Documents
19 Time permitted to start parts Whenever a work is allotted by Engineering staff, whether minor or major
of work part of any amount, the contractor shall be bound to start the work within
48 hours so intimation of work. Communication done telephonically via
SMS, via whatsapp and through letter/ E-mail shall be considered legal and
binding for the same. Failure of company to start the works in 48 hours of
intimation as above by contractor. the contractor shall be levied penalty of
(1) Rs.1000/- per day (for tender amounting upto 10 lakh). (2) Rs. 2500/- per
day (for tender amounting above 10 lakh to 30 lakh). (3) Rs. 5000/- per day
(for all tender amounting above 30 lakh). Three time failure by contractor
shall make contractor responsible to be debar unless and otherwise justified
properly in writing/binding within 15 days so flast notice of penalty. and Also
As Per SLA Clause attached in Tender Documents.
• All the circulars which were published by Authorities of AMC time by time will be
applicable on said Tender and bound to bidder with out any condition.
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
• Conditional tenders will not be accepted in any case. Municipal Commissioner
reserves the rights to reject any or all the tenders without assigning any reasons
• The authorized signatory holding Power of Attorney shall only be the Digital
Signatory. In case authorized signatory holding Power of Attorney and Digital
Signatory are not the same, the bid shall be considered non-responsive.
• Obey Circular No-03 Date-13-04-2026 of City Engineer Office
Seal and Signature of the Bidder Deputy City Engineer
Date: Ahmedabad Municipal Corporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Deputy City Engineer
Ahmedabad Municipal Corporation,
Name of Work:- bægÍtul sbtjvwh Jtuzobtk sbtjvwh rJM<thbtk <ubs yLg søgtyu ytJuj ngt<
dux hevuhekd <&t heltuJuNl fhJtlt <&t lJt cltJJt <ubs rœNt mqaf ctuzo
bqfJtlt ftb ctc<.(yu.yth.me xuLzh )
I/We the undersigned have carefully gone through and clearly understood the
Tender documents of above mentioned project comprising of Notice Inviting tenders,
Articles of Agreement, Scope of work, Definition of terms, notes Instructions/Information
to Bidder, Condition of Contract, special condition of contract, Appendices, Specifications,
Bill of Quantities, furnished by AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the
time specified all in accordance with the specification, designs, drawing and instruction in
writing referred to in the said document and with such materials as mentioned for, at the
respective rates which I/we have quoted in the Price Bid or at such other rates as may be
fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement
and when required, execute the contract, according to your form 1 of agreement as or in
default where of I/we bound myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as
decided by AMC from the date of receipt of letter of acceptance, you will forfeit the
earnest money paid by me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money
Deposit", for the sum as mentioned in NIT, the full value of which is to be absolutely
forfeited to the Employer If I/We fail to commence the work specified. Otherwise the
Employer shall retain the said sum, as on account of such Security Deposit as provided for
in the aforesaid documents.
Signature of Bidder Page 3 of
Ahmedabad Municipal Corporation
I/We agree not to employ sub-contractors other than those that may be approved
in accordance with conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest
or any tender, which are received. I / We also understand & agree that Municipal
Commissioner Reserves the right to allot number of tenders to successful bidders at his
sole discretion in case if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days
from the date of opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters
mentioned in the tender terms and conditions. I am also bound to submit all supporting
Genuine Original documents as and when asked and if any discrepancy found in such
documents as well as in the executed Work with respect to Quality/Quantity at any stage
of work or even after completion of work, it will be solely my Responsibility. I am bound to
prove originality of all documents submitted by me and if any Documents found false/fake
then Municipal Commissioner/AMC has right to take any action/penalty/punishment
I am also bound that if I/we, indulged into any malpractice and/or used any
inferior quality and/or the construction of road is found to be of an inferior quality under
this contract than in such case Municipal Commissioner/AMC has right to debar/ blacklist
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State),
Octroi duties, Royalty on material (i.e. Aggregate, Sand etc.) And any other taxes
prevailing and from time to time on such items on which the same are leviable and the
rates quoted by me/us are inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder Page 4 of
Ahmedabad Municipal Corporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad
Municipal Corporation (referred to as Employer in these documents) invites sealed
bids for the construction of works (as defined in these documents and referred to
as “the work”) detailed in the table given in the Invitation for Bid (hereinafter
called as IFB.) from competent bidder. The bidders may submit bids for the works
detailed in the table given in IFB.
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria
as defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in
the Clause-14. An agency that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or
the firms those are blacklisted/ debarred for specified period by AMC,
Governement of Gujarat, Government of India or any other entity controlled by it,
would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register “D” class having in Road Works in PWD in Govt.
R&B / CPWD / AMC or equivalent register with any other state Govt. or
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are
subject to be disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and
attachments submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delays in completion, litigation history, or
financial failures etc. or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for
the purpose of restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and
other advisors in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes
his commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets
opened before the due date of opening.
Signature of Bidder Page 5 of
Ahmedabad Municipal Corporation
• The E.M.D. is not deposited in full and in the manner as specified in the clause of
Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English
Translation in case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the
bidder(s) for their misleading or false representations in the forms statements etc.
for the period to be decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of
his Bid. Employer will in no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine
and familiarize himself with the site of Works and its surroundings including source
of earth, water, road aggregates etc. and obtain all information that may be
necessary for preparing the Bid and entering into a contract for construction of the
Works. The costs of visiting the Site shall be at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of
compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes
and thereby total amount of work increases / decreases up to any extent.
and thereby total amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision
• If the items stipulated in the tender shall not be executed as per site condition/
requirements. No claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain
idle and no claim shall be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and
addendum (if any) issued.
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, forms, Annexes in the bid
document. Failure to comply with the requirements of bid documents shall be at
Signature of Bidder Page 6 of
Ahmedabad Municipal Corporation
the bidder’s own risk. Bids which are not substantially responsive to the
requirements of the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addendum.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be
placed on website www.nprocure.com The prospective bidder shall refer to
website to check any addendum before 24 hours of opening of bids. AMC will not
give any advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his desecration, extend as
necessary the deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do
so than also the changes made through such addendum shall be applicable &
bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following
documents along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with
these Instructions to Bidders (ITB)
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original”
and other marked as “Duplicate”, shall be submitted in a sealed envelope by 18:00
Hrs on the date of physical submission of bid and addressed to the addressee given
in the NIT duly super scribed “Name of Work, Bid due date and time, Name and
address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on
the percentage rate in the Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or
for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder, except otherwise stated in the Bid document.
Employer will not compensate the bidder (contractor) for any change in duties,
Signature of Bidder Page 7 of
Ahmedabad Municipal Corporation
taxes and other levies payable by the contractor under the contract and any other
• The percentage rate and bid price quoted by the bidder shall be fixed up to the
completion of Work and shall not be subject to adjustment on any account, except
where expressly specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be
made in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid
valid for a shorter period shall be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the
Employer may request that the bidders may extend the period of validity for a
specified additional period. The request and the bidders' responses shall be made
in writing or by cable. A bidder may refuse the request without forfeiting his bid
security. A bidder agreeing to the request will not be required or permitted to
modify his bid, but will be required to extend the validity of his bid security for a
period of the extension.
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB
as part of his bid, in the form of Demand Draft / pay order / Bank Guarantee in
favour of Municipal Commissioner, Ahmedabad valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad / Gandhinagar
A. As per Government of Gujarat G.R. No. - FD/MSM/e-file /4 /2023/ 4020/D.M.O.
Date: 11/03/2024 & Circular of Finance Department, AMC no. 10 Date: 05-08-
2024, approved Banks are Guarantees issued by following banks will be accepted
as SD/EMD on permanent basis.
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for the period up to
March- 31, 2025. The validity cut-off date in the GR is with respect to the date of
issue of Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1. Commercial Banks :-
1. A U Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Equitas Small Finance Bank
9. Federal Bank
Signature of Bidder Page 8 of
Ahmedabad Municipal Corporation
14. IDFC First Bank
15. IndusInd Bank
16. Jana Small Finance Bank
17. Karnataka Bank
18. Karur Vysya Bank
19. Kotak Mahindra Bank
20. South Indian Bank
21. Tamilnadu Mercantile Bank
22. Utkarsh Small Finance Bank
2. Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. Baroda Gujarat Gramin Bank
9. Saurashtra Gramin Bank
10. The Gujarat State Co-Operative Bank
11. The Mehsana Urban Co-operative Bank Limited
12. The Surat District Co-operative Bank
13. The Surat Peoples Co-operative Bank
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the
Employer as non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be
treated as non-responsive.
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders
will be returned as promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest tenders,
will be returned when the successful bidder has furnished the required security
deposit and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has
signed the Agreement and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch
of the bank guarantee shall be of Ahmedabad City only.
Signature of Bidder Page 9 of
Ahmedabad Municipal Corporation
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial
Stamp papers of requisite value in accordance with the stamp Act applicable to
that particular state of Indian Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall
clearly indicate in (block letters) his name, designation, Power of Attorney No. /
Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly
signed/initialed by the executing officers and the last page shall be signed in full,
indicating the particulars as aforesaid under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate
envelopes and the three sealed envelopes shall be sealed in an outer envelope.
The Bid envelopes shall be marked as follows:-
• Complete Tender Document with stamp all necessary qualification related
documents (in two copy)
Above two envelopes shall be kept in one envelope and it should be marked as
“Technical Bid” and sealed. This Outer envelope should mention the name of firm
of bidder, his address, contact details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c)Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be
received by the Employer at the address specified in bid information not later than
the date indicated on the face sheet of the document. In the event of the specified
date for the submission of bids declared a holiday for the Employer, the Bids will
be received up to the appointed time on the next working day. The Bidder is
further required to submit Documents in Physical Form on or before the Bid Due
Date and before the time of submission as specified in NIT, at the following
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n)
procure e-tendering portal on account of delay in submission at bidder's end.
Bidder shall ensure that they submit the bid well before the "Due Date & Time of
Bid- Submission". AMC shall not be responsible if bidder is not able to submit the
Signature of Bidder Page 10 of
Ahmedabad Municipal Corporation
bid on account of failure in network/internet connection or any other technical
18.3 The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with respective Clause, in which case all rights and
obligations of the Employer and the bidders previously subject to the original
deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment /
corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be
rejected and returned unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be
returned unopened to the bidder.
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by writing, facsimile or e-
mail confirmed by registered letter. This letter (hereinafter and in the Conditions of
Contract called the “Letter of Acceptance” will state the sum that the Employer
will pay the Contractor in consideration of the execution, completion, and
maintenance of the Works by the Contractor as prescribed by the Contract
(hereinafter and in the Contract called the “Contract Price”).
The notification of award will constitute the formation of the Contract, subject
only to the furnishing of a Security Deposit in accordance with the provisions of
The agreement will incorporate all correspondences between the Employer and
the Successful Bidder. It will be signed by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement
within 28 days after the successful bidder (hereinafter called the Contractor)
receives the Letter of Acceptance, unless they agree otherwise, subject to
furnishing the security deposit before signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will
promptly notify the other Bidders that their Bids have been unsuccessful and
release their Earnest Money Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall
deliver to the Employer a security deposit in the form of Bank Guarantee for an
amount equivalent to 5% of the Contract Price valid for the period of valid till
days beyond Date of completion of work. The Security Deposit shall be payable in
10 days (for tenders upto Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and
above)from date of receipt of LOA failing which interest @ 4% per annum will be
charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the
Employer, from Ahmedabad branch of any Banks mentioned in the clause no.
of these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including
pre & post Audit.
Signature of Bidder Page 11 of
Ahmedabad Municipal Corporation
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late
submission of security deposit or late renewal of bank guarantee for the number of
days delayed for submission or discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be
same verbatim as per the format. Bank Guarantee shall be submitted on right
value of stamp paper and for correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause
22.1 shall constitute sufficient grounds for cancellation of the award and forfeiture
of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing
value of the contract the BG value shall be enhanced accordingly. Validity of BG
shall be commercial terms and conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the
Employer under the terms of this Contract or any other contract or on any other
account whatsoever may be deducted from Security Deposit. Also in the event of
the Contractor's Security Deposit being reduced by reasons of such deductions, as
aforesaid, the Contractor shall, within 14 days of receipt of notice of demand from
the Engineer-in-Charge, make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of
validities of Bank Guarantees as may have been furnished by the Contractor from
time to time, are required to be extended/renewed, the Contractor shall get the
validity periods of such guarantees extended/renewed, and furnish these to the
Engineer-in- Charge one month before the expiry date of the aforesaid Guarantees
originally furnished failing which the existing Bank Guarantees shall be invoked by
the Engineer – in – charge. Also in case of any deficit in securities on any account
as might occur or is noticed, the Contractor shall forthwith recoup/replace the
same with acceptable Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities
as per contract are not completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the
contractor after 45 days of completion date / Final Bill paid date which ever is
later. No interest on the amount of Security Deposit shall be paid to the Contractor
at the time of release of Security Deposit as stated above.
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an
agreement at Employer’s office within 15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad
shall be final and binding to the bidder.
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration
resulting from Contractors completed or under execution by him over last five
years. If the details of Litigation History are hidden by the Bidder and later on it
comes to the knowledge of the Employer, the Bidder shall be disqualified for the
proposed work and other appropriate actions shall be taken against the bidder.
Signature of Bidder Page 12 of
Ahmedabad Municipal Corporation
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Value of showing
Name of Reasons/Details for
Year Employer the Project
Project litigation/arbitration
(Rs.) Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise
the same shall be treat as null and void.
A consistent history of arbitration awards? Judgments against the applicants or any
partner of a joint venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to
knowledge of the employer the bidder shall be disqualified for the proposed work
and other appropriate actions shall be taken against the bidder.
Seal and Signature of the Bidder Additional
Date: Ahmedabad Municipal
Signature of Bidder Page 13 of
Ahmedabad Municipal Corporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended
time limit, the Contractor shall pay penalty of 10% of amount of actual
remaining work. The amount of work for which the scope of contractor is
reduced shall not be considered for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no.
Date: 23/05/2017 and all latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such
retention money shall be released in the final bill of the said work. AMC
reserves right to deduct any amount to compensate the poor performance of
the contractor i.e. poor quality or abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not
subcontract any portion of Work without the approval of the Employer’s
Representative. Any subcontracting shall not relieve the Contractor from any
contractual obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for
which the name of the subcontractor and scope of works activities to be
performed by him is already stated in the contract or supply of material or
engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Bid document to carry out the functions stated
in the Schedule or other personnel approved by the Engineer. The Engineer will
approve any proposed replacement of key personnel only if their qualifications,
abilities, and relevant experience are substantially equal to or better than those
of the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning
reasons thereof, for his misconduct or inadequacy of technical skills and
experience, who is a member of the Contractor’s staff or his work force, the
Contractor shall ensure that the person leaves the Site within seven days and
has no further connection with the work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall
not be erected on the site of work and contractor shall make his own
arrangements to provide such accommodations as per the rules of the local
bodies. He shall make his own arrangements for housing, stores, field office etc.
He shall submit a site layout plan indicating the location of various site facilities
to be created by him at his cost for the execution of work. The Owner shall in
no way be responsible for any delay on this account and no claim on this
account whatsoever shall be entertained. All Basic amenities shall be provided
by the Contractor to Labours as per the prevailing labour Laws.
Signature of Bidder Page 14 of
Ahmedabad Municipal Corporation
5.1 The Contractor shall have full regard throughout execution, completion and
defects liability period to following safety aspects and shall take all necessary
steps to ensure that danger to safety is avoided all the time in respect of,
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly
engaged by him for the works
• Safety of all the employees including persons working on other contracts of
Employer at the same site of the Employer and Engineers employees engaged
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing,
warning signs, barricading, and cones; when and where necessary, or required
by Engineer in Charge or by any duly constituted authority for the protection of
the works or for the safety and convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on
and off the site and avoid damage or nuisance to persons or property of the
public and others arising as a consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution,
completion, and defects liability period. The contractor shall be responsible for
and to make good all injuries, damages and repairs, rendered necessary by fire,
rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be
provided by the contractor. Nothing extra shall be payable on this account. It
shall be provided strictly with double scaffolding system with all the accessories
etc. with adjustable suitable working platforms to access the areas, with ease
for working and inspection. It shall be designed to take all incidental loads. It
should cater to the safety features for workmen. It shall be ensured that no
damage is caused to any structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed
during day as well as night time by the contractor, wherever required and as
directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection
required, by him, shall be made by the Contractor at his own cost and also
necessary permissions directly from relevant Owners shall be obtained by him
under intimation to the Owner. Also all initial and running charges and security
deposit, if any in this regard shall be borne by him. The Contractor shall abide
by all the rules/ bye laws applicable in this regard and he shall be solely
responsible for any penalty on account of violation of any of the rules and
byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety
precautions, the same shall be completely contractor’s responsibility. All the
losses due to such accidents and expenses of legal matters shall be borne by
5.9 The Contractor shall be responsible for maintenance and watch and ward of the
complete installation and shall also be responsible for any pilferage, theft,
damage, penalty etc. in this regard. The Contractor shall indemnify the Owner
Signature of Bidder Page 15 of
Ahmedabad Municipal Corporation
against any claim arising out of pilferage / theft, damage, penalty etc.
whatsoever on this account.
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the
work. Necessary protective and safety equipments shall be provided to them by
the Contractor at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All
wreckage rubbish, excess materials, temporary works no longer required will be
removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus
materials, rubbish, temporary works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a.The schedule-B shall contain Memorandum showing items for the construction,
installation, testing, and commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor
shall be paid only quantities calculated after taking measurements of executed
work. The rate stated in the schedule B for each item of work shall apply. The
works shall be measured by the Contractor jointly with the authorized
representative of the Engineer and all particulars required by the
representative of the Engineer shall be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom,
working space etc. is to be made.
9.1 The Engineer in Charge shall have power to make any variation of form, quality
or quantity of the works or any part thereof that may, in his opinion, be
necessary and for that purpose, or if for any other reason it shall, in his opinion,
be appropriate, he shall have the authority to instruct the Contractor to do and
the Contractor shall do any of the following:
Increase or decrease the quantity of any work up to any extent included in the
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the
effects, if any, of all such variations shall be valued in accordance with the
following sub clauses. Provided that where the issue of an instruction to vary
the Works is necessitated by some default or breach of contract by contractor
or for which he is responsible, any additional cost attributable to such default
shall be borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the
Engineer. No instruction is required for quantities varying from those provided
for the items in the contract schedule B.
Signature of Bidder Page 16 of
Ahmedabad Municipal Corporation
10.1 The basis for the valuation of variations for addition to the Contract Price shall
be as follows in the same order of priority.
a) Variations in the quantities of work in schedule of quantities shall not vitiate the
b) The contractor shall be bound to execute extra items of work as directed by the
Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities where
there is a quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried
out by the Contractor and he shall be paid at the rate fixed by Employer which
shall be fixed as lowest of the rates derived by rate analysis based on the
following three methods. , the priority of the documents forming the Contract
shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year
2021-22, the rate of extra item shall be that rate and premium (above or below)
quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and
equipment, the cost of all temporary and incidental works, the overheads and
the Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour
costs, the cost of use of all plant, machinery, and equipment, the cost of all
temporary and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors
profit shall be taken at 10 % of the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and
prices as are, in his opinion appropriate and shall notify the Contractor
accordingly with a copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account
payments to be included in the Interim Payment Certificates, until rates and
prices are agreed as final by the Employer, the Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to additional payment for costs, which
could have been avoided by giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable
under the law. The Employer shall pay the Contractor the amounts certified by
11.2 If an amount certified is increased in a later date certificate due to corrections
in previous certificates or as a result of an award from disputes review experts,
Contractor shall be paid such amount only. The Contractor shall not be paid any
interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be
paid for by the Employer and shall be deemed covered by other rates and prices
in the Contract.
Signature of Bidder Page 17 of
Ahmedabad Municipal Corporation
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State
and Local Governing bodies prevailing on the date of award of the contract. The
Contractor will have to pay all such taxes and duties for the performance of this
Contract. The Employer will deduct from the Contractor’s monthly and other
payments all taxes and duties, which he is bound to recover in accordance with
the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the
Central & State and local Governing bodies, all orders, decrees of bodies,
tribunals having any jurisdiction or authority which in any manner affect those
engaged or employed, and anything related to carrying out the work. All the
bye-laws lay down by AMC/AUDA and any other local bodies while executing
the work shall be adhered to. All taxes of local bodies shall be borne by the
contractor. The Contractor shall arrange to give all notices required by any
authority and to pay to such authority all the fees that may have to be paid for
the material, plants, equipments etc. The Contractor shall also adhere to all
traffic restrictions notified by the local authorities. He shall protect and
indemnify the Owner and its officials & employees against any claim or liability
arising out of violations of any such laws, ordinances, orders, decree, whether
by himself or by his employees or his authorized representatives. Nothing extra
shall be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No.
CWA/2004-1831-M(3) dt. 9/12/05 issued by G.O.G. (non-refundable) shall be
deducted from every bills which shall be deposited to Govt. Labour Department
for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works
between the Start Date and the end of the Defects Correction periods shall be
remedied by the Contractor at the Contractor's cost if the loss or damage arises
from the Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of
the Works and the Engineer will do so upon deciding that the Work is
Signature of Bidder Page 18 of
Ahmedabad Municipal Corporation
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid
after receipt by him of a Notice to this effect from the Engineer/Employer after
signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after received
3. Has failed to comply with a notice issued or an instruction issued within
days after having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to
continue performance of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior
written permission of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of the
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or
administration order made against him, compounds with his creditors, or
carries on business under receive, trustee or manager for the benefit of his
creditors, or if any act is done or event occurs which (under applicable Laws)
has a similar effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days
notice to the contractor, terminate the contract and expel the contractor from
the site. However, in the case of sub-paragraphs (h), the Employer may be
notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other
rights of the Employer, under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for
any other entities to do so. The Employer and these entities may then use any
goods, contractor’s documents and other design documents made by or on
behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the
(a) the Contractor stops work for 14 days when no stoppage of work is shown on
the current Program and the stoppage has not been authorized by the
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other
than for a reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it within a
reasonable period of time determined by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for
which the maximum amount of liquidated damages becomes payable as
defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in the executing the Contract.
Signature of Bidder Page 19 of
Ahmedabad Municipal Corporation
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving,
receiving or soliciting of anything of value to influence the action of a public
official in the procurement process or in contract execution. “Fraudulent
practice” means a misrepresentation of facts in order to influence a
procurement process or the execution of a contract to the detriment of the
Borrower, and includes collusive practice among Bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive levels
and to deprive the Borrower of the benefits of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed above, the Engineer shall decide
whether the breach is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for
18.9 If the Contract is terminated the Contractor shall stop work immediately, make
the Site safe and secure and leave the Site as soon as reasonably possible and
handover the site to the Employer including all materials and plant and
equipment existing there upon.
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the
accuracy of the same. He shall also be responsible for the correctness of the
positions, levels, dimensions, and alignment of all parts of the structures as per
instructions given to him. If at any time any error shall appear during the
progress of any part of the work, the contractor shall at his own expense rectify
such error if called upon to the satisfaction of the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation
arises out of or under this Contract against the contractor the same may be
deducted by the Municipal Corporation from any sum then due or which at any
time thereafter may become due to the contractor under this contract and
failing that under any other contract with the Municipal Corporation or from
any sum due to the contractor with the Municipal Corporation (which may be
available with Municipal Corporation), or from his retention money, or he shall
pay the claim on demand. The Municipal Corporation reserves the right to carry
out post payment audit and technical examination of the final bill including all
supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any
over payment when detected notwithstanding the fact that the amount of the
final bill may be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is
discovered in respect of any work done by the Contractor or alleged to have
been done by him under the contract, it shall be recovered by the Municipal
Corporation from the contractor by way of all the means prescribed above or if
any under payment is discovered by the Municipal Corporation, any amount
due to the contractor under this contract or under payment may be adjusted
against any amount then due or which may at any time thereafter become due
before payment is made to the contractor from him to the Municipal
Corporation on any other contract account whatsoever.
Signature of Bidder Page 20 of
Ahmedabad Municipal Corporation
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle
any part for reasons other than on account of bad or imperfect work, the
materials obtained from dismantling will be the property of the A.M.C. and will
be disposed of as per instruction of Engineer-in-charge in the best interest of
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the
following matters, whether such disputes arise during the progress of the work
or after the completion or abandonment thereof, shall be referred an
independent Arbitrator appointed by AMC as far possible in consultation with
the agency if it is necessary and such disputes shall be settled in accordance
with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or
upon the works of the site thereof or belonging to the contractor or procured
by him and intended to be used for execution of the work or any part thereof
possession of which may have been taken by the Engineer-in-charge under the
said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from
the items of works not accepted as completed fully in accordance with the
sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the
additional or altered work carried out by the contractor in accordance with the
instructions of the Engineer-in-charge under clause 14 and the rates for which is
to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be
purchased by the contractor before receipt of notice given by the Engineer-in-
charge under clause 15 and/or amount of compensation payable to the
contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay
under clause 17 in the event of this failure to rectify, remove or reconstruct the
work within the period specified in the written intimation or the amount of
expenses incurred by the Engineer-in-charge under the said clause17 in
rectifying, removing or re-executing the work or in removing and replacing the
materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause
17 for the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as
estimates and assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause
33 in accordance with the instructions and the requirement of the Engineer-in-
charge in case where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons
and calculations to every item of claims. The decision will have to be
implemented by all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal
Corporation approaching on Court of Law. It shall be within the jurisdiction
where the site of work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge
under clause 5 to take possession of all or any tools, plants, materials and
Signature of Bidder Page 21 of
Ahmedabad Municipal Corporation
stores in or upon the works of site thereof belonging to the contractor or
procured by him and intended to be used for the execution of the work or any
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the
contractor in any work or from removing such materials to other places, during
the period the work is stopped or suspended in pursuance, of notice given to
the contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in
accordance with the provisions of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when
asked by AMC. No separate payment will be made to the contractor for this. .
The contractor shall have to submit the same in hard copy as well as soft copy
as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon,
except those permitted under clause 59.1, shall be taken, or permitted to be
taken by the Contractor or by any of his employees or any employees of his
sub-Contractors without the prior approval of the Engineer in writing. No
photographs/ videography shall be published or otherwise circulated without
the approval of the Engineer in writing.
Seal and Signature of the Bidder Deputy City
Date: Ahmedabad
Municipal Corporation
Signature of Bidder Page 22 of
Ahmedabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe œhJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt ybœtJtœ BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle
btLg gtœelt ftuLx[fxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu ybœtJtœ
BGþrl.ftuvtuohuNlbtk btLg ftuLx[tfxhtule gtœebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh
mt&u stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs
ftb fhJt mûtb ntug <ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb
mk<tu»tfthf <ubs xtRb jebexbtk ÃþY fhJt sYhe mJj<,ylwCJ, ûtb<t ylu
VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe
ylwmth <&t mexe.Rsluh mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ
Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve
ylu btvœkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJk.w xuLzhh ftblt «fth, ngt<
hM<t, vtKe btdo, mkath ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk
ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekd(fu su ftb fhJt, ftb ÃþY fhJt <&t ftblt
buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekd btxu,
gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb
vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
(h) yt ftble mbg bgtoœt bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt
œM<tJus vh< fhJtlt hnuNu.
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth
Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh
mt&u cezJtle hnuNu.
Signature of Bidder Page 23 of
Ahmedabad Municipal Corporation
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh
ftuLx[tfxhu mne fhJe.
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu
VhuVth fhJtbtk ytJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk
jFtKbtk ftuR Cwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh Auftu bthelu
<ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtk
ytÔgw lrn ntug <tu xuLzh ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e
yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu ylu mwaltytu
vK ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuEvK fthK œNtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^<
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz
y&Jt vîr< y&Jt rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu cœÕGþ / cœÕgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk œhuf Ctdeœth y&Jt <u ykdulwk bwFðgthltbwk
^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk
mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl.
frb§h©eltu rlKog ytFhe hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve
Nftg <tu <u ykdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtuu fhe
Signature of Bidder Page 24 of
Ahmedabad Municipal Corporation
NfNu lrn fu ftgœtfeg ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh >ltu y&o
ftb ytve œuJtLþk Au <uJtu &R NfNu lrn.Nh<e xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble
ftuRvK Cwjawf leault rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu œhuf Ftltbtk sKtJuj Nçœtu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk
Nçœtuubtk sKtJuj hfb btLg htFJtbtk ytJNu.
(2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ
vºtflt Ftltbtk&e hfbbtk Cwj sKtg <tu yufb œh btLg htFJtbkt ytJNu ylu
œhlt yt^thu dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk
(10) y:- ftbltu «tud{um mbgbgtoœt bwsc fhJtltu hnuNu. yt mbgbgotœt 10 jtF mw^elt
ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu
yuj.ytu.ytR. ytÃg <theF&e 15 rœJm&e NY &guj dKJtbt ytJNu. <&t <u œhBgtl
ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe
xuût mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth
&Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht Yt.1,00,00,000.00 mw^elt xuLzhle bkswheltu XhtJ vtzgt
ctœ (LOI) ytvJtbtk ytJNu ðgth ctœ rœl - 15 btk rm¾gtuhexe zevtuÍex sbt
fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk
«Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem
RLJtRxuz xuLzh) btk sKtJuj «btKu bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe
ftble hfblt bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk
z:- yu.yth.me. xuLzhbtk bkswh &guj sw>t sw>t yk>ts vifelt ftbtu Jfo ytuzoh b¤u&e NY fhJtlt
E:- yu.yth.me. xuLzhbtk yjd yjd ykkœtsle bkkswhe bégu&e btºt rmJej ftbdehelt ftb «btKu
yk>ts hfb Bþsc mbgbgto>t dKtNu.
(1) Yt.1,00,000.00 &e 3,00,000.00 Mþ^elt ftbtu btxu 1 btm
(2) Yt.3,00,000.00 &e 5,00,000.00 Mþ^elt ftbtu btxu 2 btm
Signature of Bidder Page 25 of
Ahmedabad Municipal Corporation
(3) Yt.5,00,000.00 &e Wvhlt ftbtu btxu 3 btm
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt œh vwhtk &gujt ftb btxult
Au ylu <ubtk bswhe, vtjF, ÃjtLx, œuFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe
ylu ytufx[tug Jduhu ykNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt
ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu œh fh<t
J^thtle ftuR awfJKe ykdult <ublt ftuR œtJt ægtlbtk juJtNu lnek ylu xuLzh
Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe<u ctk^ftb rJCtdltu
fboathe ntug fu l ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw
fhJt nfœth hnuNu lnek. <ublw xuLzh ChJt <&t <ubtk swœt swœt CtJ ylu œh ChJt
btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw
fhJtlu je^u y&Jt <ubtk&e WCt &<t ftuR stuFb fu sJtcœthebtk&e Axfe NfNu
lnek. mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu
ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc
fhJtbt ytJNu. <&t Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh
«btKu ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh
bwsclwk vubuLx + yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su
VtRlj cejbtk vh< ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle
&Nu <u bwsc ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth
mbd{ ftblu jtdw vzNu.
ce:- xuLzhbtk œNtoJuj ftb mkck^e œM<tJusbtk œNtoJuj rJd<btk rJmkd<<tlt rfMmtbtk
leau œNotJuj ¢btlwmth œM<tJusbtk œNtoJuj rJd< d{tng htFJtbkt ytJNu.fhth
mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{
ftblu jtdw vzNu.
(yu) yufb ylu fœ:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk fœ, ytfth, ytkfzt fœta Ftuxt ntug <tu btvujt fœ, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
Signature of Bidder Page 26 of
Ahmedabad Municipal Corporation
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t
ykdule ltuk^ bwfe yuze.mexe yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk
ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykr<b dKJtbkt ytJNu.
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN
l fhJe ylu Rsluh Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk
mtawk y&oDxl fhtJJwk.
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf
mt&u s c^u NY fhJw vzNu.
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom
jtRllu lwfNtl &Nu <tu <ule mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle
hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu
lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vrhgtœ &tg <tu <ule
sJtc>the vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtc>the vK vtujem
Vrhgtœbt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu
œtuhzwk ctk^e bswh Ftztbtk W<thJt, mtuhekd ylu Mx[xekd fhJt rJduhu) je^t Jdh
bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vrhgtœbt sJtcœth hnuNu ylu
Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn. ytxjwk mbSlu
s xuLzh ChJwk. œhuf ftb fh<t bswhtultu rJbtu vK W<thujtu ntuJtu stuRyu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u
søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu
CtudJJtltu hnuNu.<&t atjw ftb œhBgtl yuLSlegh Rlatso îtht ybœtJtœ
Bgwrlmevj ftuvtuohuNlle buxjzuvtu jucbtk xuMxekd fhtJJt sKtJJtbtk ytJu <tu
ftuLx[t¾xh îtht <ulw vtjl fhJtlw hnuNu.
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x
&tg <tu rlgb ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk
vh< jR sJtltu hnuNu. yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc
ve.yuV/juch yufx <&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftgœtlw
vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu
<u ytvJtle hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf
ytvJtLþk hnuNu.
(21) ftuRvK ftgœtfeg jexeduNl ybœJtœ Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc
W<thJtltu <ubs dtuXJJtltu hnuNu.
Signature of Bidder Page 27 of
Ahmedabad Municipal Corporation
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm
MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu
«Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk
mbtJuN l ntug <uJe J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk
Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk
ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
(26) atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[tfxhle hnuNu. subtk vevzt,
œtuhzt Cgmwaf ctuzo, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu.
ylu ftuRvK yfMbt< &Nu <tu <ule mkvwKo sJtc>the ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt
yLg Ôgrf<lt yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t
vtujem ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk œhhtus
fhuj ftbdehe <&t yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug
<tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤
Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe yuLSlehgh©elu
(29) œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t
btLg htFuj MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug
<uJt mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk
lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo
ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu
cejbtk&e hfb ftve juJtbtk ytJNu.
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e
ftve juJtbtk ytJNu.
((31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg >hBgtl
ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the ytvJtbtk
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu
VhSgt< ytvJtlt hnuNu.
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu jd<tk
ftb btk ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs buLgwyj
M¾{uJSkd ykdule btdoœrNoft lwk vtjl fhJwk.
Signature of Bidder Page 28 of
Ahmedabad Municipal Corporation
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<tlt mh¾gwjh lkk.38, <t.21/11/2022 <&t
mûtb m<tle b¤uj bkkswhe bwsc Syumxe rmJtg dK<hebtkk juJtbt ytJuj <&t «Jo<btl
rlgb bwsc Syumxe awfJJt vtºt &Nu. su ægtlu jR <btb rczomu xuLzhtu ChJtlt hunNu.
(35) mœh xuLzh ykk<od<olt ftb mkkjøl y.Bgw.ftuvtuo.btkk «Jo<btl <btb rlgbtu/mh¾gwjhtu jtdw
vzNu, <ubs JF<tu JF< <h mw^thtytu vK jtdw vzNu. suule ltuk^ jR xuLzhtu ChJtlt hunNu.
(36) mœh xuLzh yu.yth.me. «fthlw Au ytvlu mtukvJtbtkk yuxju fu ytv îtht ChJtbtkk ytJuj
ftbdehelt sÚ&t bwsc mbg bgtoœt lffe fhe su <u mûtbm<tle yjd yjd ykkœtsle
bkkswhe bégu&e Jfo ytuzoh ytvJtbtkk ytJNu ylu mbg bgtoœtbtkk ftbdehe vqKo fhJtlw awM< vKu
vtjl fhJtlw hunNu
(37) mœhnw ftbbtkk Jtuzobtkk sYhegt< bwsc ytuAtbtkk ytuAe xuLzhle Nh< bwsc bkkswh <h xuLzh
vife yjd yjd ykkœtsle bkkswhe bu¤JJtbtkk ytJ<e ntuR, ytuAtbtkk ytuAe yuf mt&u œN
søgtyu sYhegt< bwsc ftbdehe NY fhJtle Nh<u ylu <u «btKu bulvtJh, bNelhe,
bxehegÕm <ubs ltkkKtfeg studJtRle vwh<t «btKbtkk ÔgJM&t fhe su <u xuLzhhu xuLzh Cgto vqJuo
ytdtu<Y ytgtuslle <igthe mt&u ftbdehe fhJtle &tg Au.
(38) mœh xuLzh yu.yth.me. «fthlw Au ytvlu mtukvJtbtkk yuxju fu ytv îtht ChJtbtkk ytJuj ftbdehelt sÚ&t
bwsc mbg bgtoœt lffe fhe su <u mûtbm<tle yjd yjd ykkœtsle bkkswhe bégu&e Jfo ytuzoh
ytvJtbtkk ytJNu ylu mbg bgtoœtbtkk ftbdehe vqKo fhJtlw awM< vKu vtjl fhJtlw hunNu .
(39) mœhnw ftbbtkk Jtuzobtkk sYhegt< bwsc ytuAtbtkk ytuAe xuLzhle Nh< bwsc bkkswh <h xuLzh vife yjd
yjd ykkœtsle bkkswhe bu¤JJtbtkk ytJ<e ntuR, ytuAtbtkk ytuAe yuf mt&u œN søgtyu sYhegt< bwsc
ftbdehe NY fhJtle Nh<u ylu <u «btKu bulvtJh, bNelhe, bxehegÕm <ubs ltkkKtfeg studJtRle vwh<t
«btKbtkk ÔgJM&t fhe su <u xuLzhhu xuLzh Cgto vqJuo ytdtu<Y ytgtuslle <igthe mt&u ftbdehe fhJtle &tg Au.
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu
M&¤le bwjtft< je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS
ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu
ylu xuLzhlu jd<t >M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu
ybj fhJt mkb< Awk/Aeyu.
Signature of Bidder Page 29 of
Ahmedabad Municipal Corporation
ftuLx[tfxhle mne ylu
Signature of Bidder Page 30 of
Ahmedabad Municipal Corporation
GENERAL DETAILS SPECIFICATION OF MATERIAL
1.1 Water shall not be salty or brackish and shall be clean reasonably clear
and free from objectionable quantities of silt and tract of oil and injurious
alkalis, salts, organic mater and other deleterious materials which will
either weaken the mortar or concrete or cause efflorescence of attach the
steel in R.C.C. Container for transport, storage and handling of water shall
be clean. Water shall conform to the standards specified in I.S. 456-1978.
1.2 If required by the Engineer-in-charge it shall be tested by comparison
with distilled water. Comparison shall be made by means of standard
cement tests for soundness, time of setting and mortar strength as
specified in I.S. 269-1976. Any indication of unsoundness, change in time
of setting of 30 minutes either more or decrease of more than 10 percent
in strength of mortar prepared with water sample when compared with
the results obtained with mortar prepared with distilled water shall be
sufficient cause for rejection of water under test.
1.3 Water for curing mortar, concrete or masonry should not be too acidic
and also not too alkaline. It shall be free of elements which significantly
affect the hydration reaction or otherwise interfere with the hardening of
mortar or concrete during curing or those which produce objectionable
stains or other unsightly deposits on concrete or mortar surfaces.
1.4 Hard and bitter water shall not be used for curing.
1.5 Potable water will be generally found suitable for curing mortar for
preparing or concrete.
2.1 Cement shall be Ordinary Portland, Ordinary Portland cement as per
I.S. 269-1976 or Portland slag cement as per I.S.455-1976.or Sulphate
Resistant Cement as per IS-12330 latest Revision.
2.2 Testing of Cement : It should be specifically noted that the cement
brought by the contractor at site of work shall be used after the same is
tested at the approved laboratory as per the direction of the Engineer-in-
charge. Such approved laboratory may be located at Ahmedabad. All the
charges for transport and testing of the samples shall have to be borne by
the contractor. The frequency of testing of such materials shall be in
accordance to the relevant Indian standard as directed by the Engineer-in-
Sand shall be natural sand, clean, well graded, hard strong, durable and
gritty particles free from injurious of dust, clay, kankar nodules, soft or
flaky particles shale, alkali salts, organic matter, loam, mica or other
deleterious substances and shall be got approved from the Engineer-in-
charge. The sand shall not contain more than 8 percent of silt as
determined by field test. If necessary the sand shall be washed to make it
3.2 COARSE SAND :
Signature of Bidder Page 31 of
Ahmedabad Municipal Corporation
The fineness modulus of coarse sand shall not be less than 2.5 and shall not
exceed 3.0. The sieve analysis of coarse shall be as under:
I. S. Sieve Percentage by I. S. Sieve Percentage
Designation weight passing Designation weight
sieve through sieve.
3.3 FINE SAND :
The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand
shall be as under :
I. S. Sieve Percentage by I. S. Sieve Percentage by
Designation weight passing Designation weight
through sieve through sieve.
2.36 mm 100 300 Micron 5 -
M-4 STONE GRIT :
4.1 Grit shall consist of crushed or broken stone and be hard, strong dense,
durable, clean, of proper gradation and free from skin or coating likely to
prevent proper adhesion of mortar. Grit shall for as possible flaky
elongated pieces shall be avoided.
It shall generally comply with the provisions of I. S. 383-1970. Unless special
stone of particular quarried is mentioned. Grit special stone of particular
quarries is mentioned. Grit shall be obtained from the best black trap or
equivalent hard stone as approved by the Engineer - in - charge. The grit
shall have no deleterious reaction with cement.
4.2 The grit shall conform to the following gradation as per sieve analysis :
I. S. Sieve Percentage passing I. S. Sieve Percentage Passing
Designation through sieve Designation through sieve
4.3 The crushing strength of grit will be such as to allow the concrete in
which it is used to build up the specified strength of concrete.
4.4 The necessary tests for grit shall be carried out as per the requirements
of I. S. 2386 (Parts I to VIII) 1963, as per instruction of the Engineer-in-
charge. The necessity of test will be decided by the Engineer-in-charge.
Signature of Bidder Page 32 of
Ahmedabad Municipal Corporation
M-5A STONE COARSE AGGREGATE FOR NOMINAL MIX CONCRETE :
5A.1 Coarse aggregate shall be of machine crushed stone of black trap or
equivalent and be hard, strong, dense, durable, clean and free from skin
and coating likely to prevent proper adhesion of mortar.
5A.2 The aggregate shall generally be cubical in shape. Unless special stones
of particular quarries are mentioned, Aggregates shall be machine crushed
from the best black trap or equivalent hard stone as approved. Aggregate
shall have no deleterious reaction with cement. The size of the coarse
aggregate for plain cement concrete and ordinary reinforced cement
concrete shall generally be as per the table given below. However in case
of reinforcement cement concrete the maximum limit may be restricted to
6 mm less than the minimum lateral clear distance between bars of 6 mm.
less than the cover whichever is smaller.
I.S. Sieve Percentage Passing for I.S. Sieve Percentage Passing
Designation single sized aggregates Designation single sized
of nominal size of nominal size
NOTE :- The percentage may be varied by the Engineer-in-charge when
considered necessary for obtaining better density and strength of
5A.3 The grading test shall be taken in the beginning and at the charge of
source of materials. The necessary tests indicated in I.S. 383-1970 I. S. 456-
1978 shall have to be carried out to ensure the acceptability. The
aggregates shall be stored separately and handled in such a manner as to
prevent the inter mixed on different aggregates. If the aggregates are
covered with dust, they shall be washed with water to make them clean.
M-5B BLACK TRAP OR EQUIVALENT HARD STONE COARSE :
5B.1 Aggregate for Design Mix concrete : Coarse aggregate shall be of
machine crushed stone of black trap or equivalent hard stone and be hard,
strong, dense, durable clean and free from skin and coating likely to
prevent proper adhesion of mortar.
5B.2 The aggregates shall generally be cubical in shape. Unless special
stones of particular quarries are mentioned, aggregates shall be machine
crushed from the best, black trap or equivalent hard stones as approved.
Aggregate shall have no deleterious reaction with cement.
5B.3 The necessary tests indicated in I. S. 383-1970 and I.S.456-1978 shall
have to be carried out to ensure the acceptability of the material.
Signature of Bidder Page 33 of
Ahmedabad Municipal Corporation
5B.4 If aggregate is covered with dust it shall be washed with water to make
6.1 The bricks shall be hard or machine moulded and made from suitable
soils and kiln burnt. They shall be free from cracks and flaws and nodules
of free lime. The shall have smooth rectangular faces with sharp corners
and shall be of uniform colour.
The bricks shall be moulded with a frog of 100 mm x 40 mm and 10 mm to
mm deep on one of its flat sides. The bricks shall not break when thrown
on the ground from a height of 600 mm.
6.2 The size of modular bricks shall be 190 mm x 90 mm.
6.3 The size of the conventional bricks shall be as under :
6.4 Only bricks of one standard size shall be used on one work.The
following tolerance shall be permitted in the conventional size adopted in
a particular work.
Length : = 1/8" (3.0 mm) Width : = 1/16" (1.50 mm)
Height : = 1/16" (1.50 mm)
6.5 The crushing strength of the bricks shall not be less than 35 Kg/Sq.cm.
The average water absorption shall not be more than 20 percent by
weight. Necessary tests for crushing strength and water absorption etc.
shall be carried out as per I.S. 3495 (Part-I to IV) -
M-6A FLY-ASH LIME BRICKS :
The fly ash lime bricks shall conform to Grade-1 or Grade-2 of IS-3812-1981.
The frog of the 80 to 100 mm x 40 mm x 10 to 20 mm size.
The size of modular bricks shall be 190 mm x 90 mm x 90 mm.
The size of conventional brick shall be 225 mm x 110 mm x 75 mm.
Only bricks of one standard size shall used on one work. The following
tolerances shall permitted in the conventional size adopted in a particular
Length : + 3 mm
Height : + 2 mm
The physical characteristic of bricks shall be as follows.
The minimum compressive strength of fly ash lime bricks shall not be less
than 75 Kg/Sq.Cm. and the test shall be conform to IS-3495 (Part-I):1992.
The average drying shrinkage of the brick when tested by the method
described in IS 4139-1989 being shall not exceed 0.15 percent.
The averages water absorption not more than 20 percentage by mass and the
test shall conform to IS-3495 (Part-3):1992.
M-7 MILD STEEL BARS :
7.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S. 432 (
Part-II ) 1966 and shall be tested quality. It shall comply with relevant part
Signature of Bidder Page 34 of
Ahmedabad Municipal Corporation
7.2 All the reinforcement shall be clean and free from dirt, paint, grease,
mill scale or loose of thick rust at the time of placing.
7.3 For the purpose of payment the bar shall be measured correct upto
mm length and weight payable worked out the rate specified below :
1. 6 mm 0.22 Kg./Rmt. 8. 20 mm
2. 8 mm 0.39 Kg./Rmt. 9. 22 mm
M-8 TMT FE-500 STEEL BARS FOR REINFORCEMENT :
8.1 Reinforcement bars shall conform to IS-432, IS-226 or IS-1786 with its
latest amendment and welded wire fabrics to IS : 1566. Only TMT bars for
reinforcement in RCC duct shall be used which shall be clean, free from
pitting, oil, grease, paint, loose mill scale, rust, dirty dust or any other such
substance that will destroy or reduce bond.
It permitted by the Engineer-in-charge reinforcement shall be done in
accordance with IS-2751 or IS-9147 as applicable.
8.2 Other provision and requirements shall conform to specification No. M-
7 for mild steel bars.
M-9 MILD STEEL BINDING WIRE :
9.1 The mild steel wire shall be of 1.63 mm or 1.22 mm (16 or 18 gauge)
diameter and shall conform to I.S. 280-1972.
9.2 The use of black wire will be permitted for binding reinforcement bars.
It shall be free from rust, oil paint grease, loose mill scale or any other
undesirable coating which may prevent adhesion of cement mortar.
M-10 STRUCTURE STEEL :
10.1 All structural steel conform to I.S.226 - 1965. The steel shall be free
from the defects mentioned in I.S. 226-1975 and shall have a smooth
finish. The material shall be free from loose mill scale, rust pits or other
defects affecting the strength and durability. Rivet bars shall conform to
10.2 When the steel is supplied by the contractor test certificate of the
manufacturers shall be obtained according to I.S. 226-1975 and other
relevant Indian Standards.
M-11 SHUTTERING :
11.1 The shuttering shall be either of wooden planking of 30 mm. minimum
thickness with or without steel lining or of steel plates stiffened by steel
angles. The shuttering shall be supported on battens and beams and
props of vertical ballies properly cross braced together so as to make the
Signature of Bidder Page 35 of
Ahmedabad Municipal Corporation
centering rigid. In places of bullie props, brick pillar of adequate section
built in mud mortar may be used.
11.2 The form work shall be sufficiently strong and shall have camber, so
that it assumes correct shape after deposition of the concrete and shall be
able to resist forces caused by vibration of live load of men working over it
and other incidental loads associated with it. The shuttering shall have
smooth and even surface and its joints shall not permit leakage of cement
11.3 If at any stage of work during or after placing concrete in the structure,
the form sags or bulges out beyond the required shape of the structure,
the concrete shall be removed and work redone with fresh concrete and
adequately rigid form work. The complete form work shall be got
inspected by and got approved from the Engineer-in-charge, before the
reinforcement bars are placed in position.
11.4 The props shall consist of bullies having 100 mm minimum diameter
measured at mid length and 80 mm at thin end and shall be placed as per
design requirement. These shall rest squarely on wooden sole plates
mm thick and minimum bearing area of 0.10 Sq.m. laid on sufficiently
11.5 Double wedges shall further be provided between the sole plate and
the wooden props so as to facilitate tightening and easing of shuttering
without jerking the concrete.
11.6 The timber used in shuttering shall not be so dry as to absorb water
from concrete and swell or bulge nor so wet to shrink after erection. The
timber shall be properly sawn and planned on the sides and the surface
coming in contract with concrete. Wooden form work with metal sheet
lining or steel plates stiffened by steel angles shall be permitted.
11.7 As far as practicable, clamps shall be used to hold the forms together
and use of nails and spikes avoided.
11.8 The surface of timber shuttering that would come in contact with
concrete shall be well wetted and coated with soap solution before the
concreting is done. Alternatively coat of raw linseed oil or oil of approved
manufacture may be applied in place of soap solution. In case of steel
shuttering either soap solution or raw linseed oil shall be applied after
thoroughly cleaning the surface. Under no circumstances black or burnt oil
shall be permitted.
11.9 The shuttering for beams and slabs shall have camber of 4 mm per
meter (1 in 250) or as directed by the Engineer-in-charge so as to offset of
subsequent deflection for cantilevers the camber at free end shall be 1/50
of the projected length or as directed by the Engineer-in-charge.
M-12 HARD DRAWN WIRE :
The Hard drawn steel wire should confirming to IS-432 (Part 2), Hard
drawn steel wire shall be manufacture and its chemical composition
should be as per para 3.0. The finished wire should be free from defects
and finished in a workman like manner. Nominal sizes, Tolerances,
Physical requirements are as per IS : 432 (Part-II) latest edition. Hard
drawn steel wire should be tested as specified in IS : 432 (Part-II) latest
Signature of Bidder Page 36 of
Ahmedabad Municipal Corporation
Note : All the B.I.S. mentioned above shall be with its latest addition as
well as amendment.
Signature of Bidder Page 37 of
Ahmedabad Municipal Corporation
TECHNICAL SPECIFICATIONS:
Following technical specifications shall be applicable to the relevant items of BOQ
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead. (A) Loose or soft soil
0 to 1.5 meter depth.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or any such
ordinary excavating implement or organic soil, gravel, silt, sand turf loam, clay, peat etc. falls under this
category. For materials and workmanship for earthwork and excavation, relevant specification IS: 3764 &
IS 1200 (Part I) shall be followed.
The depth of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions,
loose stones, materials and rubbish of all kind, bush; wood and all type trees shall be removed,
The materials so obtained shall be the property of the Client and shall be conveyed and stacked
as directed, within 50-m. lead. The roots of the trees coming in the sides of the trenches shall
be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority /
Municipal Commissioner, before cutting shall be cut after obtaining such permission from
them. It shall be the Client's responsibility to obtain such permission from the respective
The rate of site clearance is deemed to be included in the rate of earthwork, for which no extra
After cleaning the site, the centerline of the central verge & other constructions will be given by
the Engineer-in-charge. The Contractor shall assume full responsibility for alignment, elevation
and dimension of each and all parts of the work. Contractor shall supply labours, materials, etc.
required for setting out the reference marks and bench marks made of MS angle iron and
embedded in 1:2:4 CC.
They shall maintain the same as long as required and directed.
The excavation shall be carried out in true line and level and shall have the width and depth, as
shown in the drawings or as directed. The Contractor shall do the necessary shoring and
Signature of Bidder Page 38 of
Ahmedabad Municipal Corporation
strutting or shall provide necessary slopes to a safe angle or steps, as required or directed, at
his own cost. No extra payment shall be made for such precautionary measures, taken. The
bottom of the excavated area shall be leveled both longitudinally and transversely, as directed,
by removing excess soil and watering, as required. No earth filling will be allowed for bringing it
to level, if by mistake or any other reason, excavation is made deeper or wider than shown on
the drawings or as directed. The extra depth or width shall be made up with sand filling, as
specified for the bottom level of the subsequent finishing at the cost of the Contractor or as
directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of supporting
all utility services, lighting the excavated areas, separating and stacking serviceable materials
neatly,shoring, timbering, strutting, bailing out water either sub-soil or rainwater, including
pumping at any stage of the work. Excavated areas shall be kept free of water while masonry or
concrete or relevant base works are in progress and till the Engineer-in-charge considers it
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas wherever
required inlayers, including ramming and watering, ensuring proper compaction etc. complete.
The Contractor shall remove the balance of the excavated quantity from the site of work, to a
place, as directed and for all lift.
The lead is the shortest practical route and not necessarily the route actually taken. The
decision of Engineer-In-charge shall be final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections
shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be
made for surplus excavation made in excess of above requirements or due to stepping and
sloping back as found necessary, on account of conditions of soil and requirements of safety.
The rate shall include for clearing the site, surface dressing, making layout for road, fixing
permanent grid points with MS iron posts, embedded in C.C. 1:2:4, placed sufficiently away
from the existing traffic lines and establishing bench marks etc.
The rates shall include for necessary shoring, timbering and strutting for protection of sides of
the excavated area, pumping out rain or surface water at any stage of construction so as to
keep the excavated area dry, to the satisfaction of the /Engineer-in-charge.
The rate shall include leveling and ramming the bottoms of excavations to receive concrete,
etc. including trimming to slope wherever necessary etc. complete.
In filling clods bigger than 50 mm. shall not be allowed. Only consolidated measurements of
filling shall be paid. Consolidation to be done by mechanical compactor as per relevant item.
Extra Rate Over Item of Excavation of Earth for excavation of asphalt pavement / RCC of thickness up
to 0.20 meter including demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc.comp.
with stacking the material as directed. (Based on Previously approved rate by C E sir)
Signature of Bidder Page 39 of
Ahmedabad Municipal Corporation
(a) up to 0.20 meter thickness (By Manual)
(b) 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C. Cutter machine including cost of
operator, fuel, & transportation etc complete.)
(c) 0.30 meter & above (By any type of Breaker Machine or R.C.C. Cutter machine including cost of
operator, fuel, & transportation etc complete.)
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet,
metal, soiling etc. complete with stacking the materials as directed. The road surface of asphalt shall
carefully be opened to full width as directed by the Engineer in charge so as to remove all cracks or other
damaged portions of road either manually or with the soiling shall be first be stripped off for the whole
width of trenches. All the Fmaterials shall be separately deposited in such places as may be determined by
the Engineer-in-charge. In case rubble not being so deposited or being mixed up with the excavated
materials will not be allowed for refilling. The cost of materials shall be charged from the contractor. The
decision of the C.E. shall be final and binding to the contractor.
Mode of measurement
Measurement shall be paid by Smt basis.
Providing and laying cement concrete 1:4:8 (1-Cement: 4- coarses and 8-hand broken stone
aggregates 40mm nominal size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth (upto 10 ton). Building SOR 2023-24 Iteam Cod :05004A Iteam No. As Per NBO
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials
and watered and rammed as directed. The proportion of cement, sand and hand broken stone
aggregates shall be one part of cement, 4 parts of coarse sand, 8 parts of hand broken stone aggregates
and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the site of work.
Hand mixing may however be allowed for smaller quantity of work if approved by the Engineer-incharge.
When hand mixing is permitted by the Engineer-in charge in case of breakdown of machinery’s and in the
interest of the work. it shall be carried out on a water tight platform and care shall be taken to ensure
that mixing is continued until the mass is
uniform in colour and consistency. The quantity of water shall be sufficient to produce a dense concrete
of required workability for the purpose. The concrete shall be handled from the place of mixing to the
final position in not more than 15 minutes by the method as directed and shall be placed into its final
position, compacted and finished within 30 minutes of mixing with water i.e. before the setting
commences. The concrete shall be laid in layers of 15 cms. to 20 cms. The concrete shall be rammed with
heavy iron rammers and rapidly to get the required compaction and to allow all the gaps to be filled with
mortar. After the final set, the concrete shall be kept continuously wet, if required by pounding for a
period of not less than 7 days from the date of placement The concrete shall be measured for its length
breadth and depth, limiting dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock,
fly ash, aggregates of any kind Including spreading & levelling etc. complete.
(a) Lead Upto 1 Km.
(b) Lead From 1 Km to 2 Km.
Signature of Bidder Page 40 of
Ahmedabad Municipal Corporation
(c) Lead From 2 Km to 3 Km
(d) Lead From 3 Km to 4 Km
(e) Lead From 4 Km to 5 Km
(f) Lead From 5 Km to 10 Km
(g) Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated
rock, fly ash,aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a
lead of 200 meters or as per instruction given by Engineer in charge. Useful materials obtained
from clearing site and excavation shall be stacked and used within the work site. Internal
conveyance above 200 mt within the work site i.e. From starting chainage to End chainage of a
given road WILL NOT BE PAYABLE. Materials suitable for construction of Embankment, earthen
shoulder and subgrade shall be stacked at convenient places within a work site for reuse. No
extra payment will be paid to the contractor for stacking of earth within the work site and
reused for the construction of Embankment layer, sub grade and earthen shoulder purpose.
Only surplus earth shall be disposed off outside the work site as per instruction given by
Engineer-In-charge. Useful stones from rock excavation shall be stacked nearly within a lead of
50 M. and will be allowed to be used by the contractor on payment at rates laid down in the
contract or if not so aid down, at schedule of rates of the Division or at a mutually agreed rates if
there are no such rates in the Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance
from a particular stretch of given road will be paid in this item as per instruction of Engineer in
charge. No bulkage of disposed earth will be considered for the payment.
ITEM NO.05 : P ROVIDING AND LAYING CONTROLLED CEMENT CONCRETE M-200 AND CURING COMPLETE, EXCLUDING THE COST
OF FORM WORK AND REINFORCEMENT FOR REINFORCED CONCRETE WORK IN :
(A) FOUNDATIONS , FOOTINGS, BASE OF COLUMNS , AND MASS CONCRETE .
(B) WALLS FROM TOP OF FOUNDATIONS/LEVEL UP TO FLOOR TWO LEVEL.
(C) SLABS , LANDING SHELVES , BALCONIES, LINTELS, BEAMS, GIRDERS, AND
CANTILEVER, UP TO FLOOR TWO LEVEL .
(D) COLUMNS , PILLARS, POSTS, AND STRUTS, UP TO FLOOR TWO LEVEL.
(E) S TAIRCASE UP TO FLOOR TWO LEVEL .
(K) VERTICAL AND HORIZONTAL FINS UP TO FLOOR TWO LEVEL .
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORKS,
SECTION . NO. 5.8.2, PAGE NO .
Item No.07 Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
Signature of Bidder Page 41 of
Ahmedabad Municipal Corporation
automatic batching plant and transported to site of work in transit mixer for a lead up to
10 kms having continuous agitated mixer, manufactured as per mix design of specified
grade for reinforced cement concrete work including pumping of R.M.C. from transit
mixer to site of laying, excluding the cost of centering shuttering finishing and
reinforcement including cost of admixtures in recommended proportions as per IS:
to accelerate/ retard setting of concrete, improve workability without impairing strength
and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min cement
level as per latest IS 456 shall be maintained)
This Specification covers the general requirements for concrete using on-site production facilities
including requirements in regard to the quality, handling, storage of ingredients, proportioning, batching,
mixing,transporting, placing, curing, protecting, repairing, finishing and testing of concrete; form work;
requirements in regard to the quality, storage, bending and fixing of reinforcement; grouting as well as
mode of measurement and payment for complete works.
It shall be very clearly understood that the specifications given herein are brief and do not cover minute
details. However, all work shall have to be carried out in accordance with the relevant standards and
codes of practices or in their absence in accordance with the best accepted current engineering practices
or as directed by Engineer from time to time. The decision of Engineer as regards the specification to be
adopted and their interpretation and the mode of execution of work shall be final and binding on
Contractor and no claim whatsoever will be entertainment on this account.
APPLICABLE CODES AND SPECIFICATIONS
The following specifications, standards and codes, including all official amendments/revisions and other
specifications and codes referred to therein, should be considered a part of this specification. In all cases
the latest issue/edition/revision shall apply. In case of discrepancy between this specification and those
referred to herein below or other specifications forming a part of this bid document, this specification
CODE FOR MATERIALS:
1. IS: 4031 (Parts 1 to 15) Methods of physical tests for hydraulic cement
2. IS: 4032 Methods of chemical analysis of hydraulic cement
3. IS: 650 Specifications for standard sand for testing of cement
4. IS: 2430 Methods for sampling of aggregates for concrete
5. IS: 2386 (Part 1 to 8) Methods of test for aggregates for concrete
6. IS: 3025 Methods of sampling and test (physical and chemical) water
used in industry
7. IS: 6925 Methods of test for determination of water soluble chlorides in concrete admixtures
Signature of Bidder Page 42 of
Ahmedabad Municipal Corporation
CODE FOR MATERIALS STORAGE
1. IS: 4082 Recommendations on stacking and storing of construction materials at site
CODE FOR CONCRETE MIX DESIGN
1. IS: 10262 Recommended guidelines for concrete mix design
2. SP: 23 (S&T) Handbook on Concrete Mixes.
CODE FOR CONCRETE TESTING:
1. IS:1199 Method of sampling and analysis of concrete
2. IS:516 Method of test for strength of concrete
3. IS:9013 Method of making, curing and determining compressive strength of accelerated cured
concrete test specimens.
4. IS:8142 Method of test for determining setting time of concrete by penetration resistance.
5. IS:9284 Method of test for abrasion resistance of concrete
6. IS:2770 Methods of testing bond in reinforced concrete
CODE FOR EQUIPMENT
1. IS:1791 Specification for batch type concrete mixers
2. IS:2438 Specification for roller pan mixer
3. IS:4925 Specification for concrete batching and mixing plant
4. IS:5892 Specification for concrete transit mixer and agitator
6. IS:2505 General requirements for concrete vibrators: Immersion type
7. IS:7251 Specification for concrete finishers
8. IS:2722 Specification for portable swing weigh batchers for
concrete (single and double bucket type).
9. IS:2750 Specification for steel scaffoldings
CODES OF PRACTICE (LATEST REVISION)
1. IS:456 Code of practice for plain and reinforced concrete
2. IS:457 Code of practice for general construction of plain and
reinforced concrete for dams and other massive structures
3. IS:3370 (Parts 1 to 4) Code of practice for concrete structures for storage of liquids.
4. IS:3935 Code of practice for composite construction
Signature of Bidder Page 43 of
Ahmedabad Municipal Corporation
5. IS:2204 Code of practice for construction of reinforced concrete shell roof.
6. IS:2210 Criteria for the design of reinforced concrete shell structures and folded plates.
7. IS:2502 Code of practice for bending and fixing of bars for concrete reinforcement
8. IS:5525 Recommendation for detailing of reinforcement in reinforced concrete works
9. IS:2751 Code of practice for welding of mild steel plain and deformed bars used for reinforced concrete
10. IS:9417 Specification for welding cold worked bars for reinforced concrete construction
11. IS:3558 Code of practice for use of immersion vibrators for consolidating concrete
12. IS:3414 Code of practice for design and installation of joints in buildings
13. IS:4326 Code of practice for earthquake resistant design and construction of building
14. IS:4014 (Part 1 and 2) Code of practice for steel tubular scaffolding
15. IS:2571 Code of practice for laying in-situ cement concrete flooring
16. IS:7861 Code of practice for extreme weather concreting
(Part-1) Recommended practice for hot weather concreting
(Part-2) Recommended practice for cold weather concreting.
CODE FOR CONSTRUCTION SAFETY
CODE FOR MEASUREMENT
1. IS:1200 (Part 1 to 28)
Method of measurement of building and engineering works
2. IS:3385 Code of practice for measurement of Civil Engineering works
1. IS:3696(Part 1 and III) Safety code for scaffolds and ladders
2. IS:7969 Safety code for handling and storage of building materials
3. IS:8989 Safety code for erection of concrete framed structures
Engineer shall have the right at all times to inspect all operations including the sources of materials,
procurements, layout and storage of materials, the concrete batching and mixing equipment, and the
quality control system. Such an inspection shall be arranged and Engineer’s approval obtained, prior to
concrete work. This shall, however, not relieve Contractor of any of his responsibilities. All materials does
not conform to this specification shall be rejected. Materials should be selected so that they can satisfy
the design requirements of strength, serviceability, safety, durability and finish with due regards to the
Signature of Bidder Page 44 of
Ahmedabad Municipal Corporation
functional requirements and the environmental conditions to which the structure will be subjected.
Materials complying with codes/standards shall generally be used; other materials may be used after
approval of the Engineer and after establishing their performance suitability based on previous data,
experience or tests.
Unless otherwise specified or called for by the Engineer, cement shall be Ordinary Portland Cement to IS:
12330 (latest edition) for entire work. Where Portland pozzolana or slag cement are used, it shall be
ensured that consistency of quality is maintained, there will be no adverse interactions between the
materials and the finish specified is not marred. Only one type of cement shall be used in any one mix.
The source of supply, type or brand of cement within the same structure or portion thereof shall not be
changed without approval from Engineer.
Cement which is not used within 90 days from its date of manufacture shall be tested at a laboratory
approved by Engineer and until the results of such tests are found satisfactory, it shall not be used in any
“Aggregate” in general designates both find and coarse inert materials used in the manufacture of
concrete (vide BIS 456 and BIS 383) and conforming to tests as per BIS 2386 (Part 1 to VI). “Coarse
Aggregate” is aggregate most of which is retained when passed through on 4.75 mm BIS sieve.All fine and
coarse aggregates prFoposed for use in the works shall be subject to the Engineer-in-charge’s approval
and after specific materials have been accepted, the source of supply of such materials shall not be
changed without prior approval of the Engineer-in-charge.
Aggregates shall consist of natural sand, stone (crushed or uncrushed) and gravel from a source known to
produce satisfactory aggregate for concrete and shall be chemically inert, non-flaky, strong, hard, durable
against weathering, or limited porosity and free from deleterious materials that may cause corrosion of
the reinforcement or may impair the strength and or durability of concrete. The grading of aggregates
shall be such as to produce a dense concrete of specified strength and consistency that will work readily
into position without segregation and shall be based on the “mix design” and preliminary tests on
concrete specified later.
SAMPLING AND TESTING
Samples of the aggregates for mixed design and determination of suitability shall be taken under the
supervision of the Engineer-in-charge and delivered to the laboratory, well in advance of the scheduled
placing of concrete, Records of tests, which have been made on proposed aggregates and on concrete
made from this source of aggregates shall be furnished to Engineer-in-charge in advance of the work, for
use in determining aggregate suitability. The costs of all such tests, sampling etc. shall be borne by the
STORAGE OF AGGREGATE
Signature of Bidder Page 45 of
Ahmedabad Municipal Corporation
All coarse and fine aggregates shall be stacked separately in stock piles in the material yard near the work
site in bins properly constructed to avoid inter mixing of different aggregates. Contamination with foreign
material and earth during storage and while heaping the materials shall be avoided. The aggregates must
of specified quality not only at the time of receiving at site but more so at the time of loading into mixer.
Rakers shall be piled in layers not exceeding 1.20 m in height to prevent coning or segregation. Each layer
shall cover the entire area of stock pile before succeeding layers are started. Aggregates that have
become segregated shall be rejected.
SPECIFIC GRAVITY
Aggregates having a specific gravity below 2.4 (saturated surface dry basis) shall not be used:
Fine aggregate shall consist of natural or crushed sand conforming to IS 383 conforming to tests as per
2386 1 to IV. The sand shall be clean, sharp, hard, strong and durable and shall be free from dust,
vegetables substances, adherent coating, clay, alkali, organic, matter mica, salt or other deleterious
substances, which can be injurious to the setting qualities/strength/durability of concrete.
SCREENING AND WASHING:
Sand shall be prepared for use by such screening or washing, or both, as necessary, to remove all
objectionable foreign matter while separating the sand grains to the required size fraction.
FOREIGN MATERIAL LIMITATIONS:
The percentage deleterious substances in sand delivered to the mixer shall not exceed the following:
Unless otherwise directed or approved by the Engineer-in-charge, the grading of sand shall be within the
limits indicated hereunder:
Where the grading falls outside the limits of any particular grading zone of sieves, other than 600 microns
IS sieve, by total amount not exceeding 5%, it shall be regarded as falling within that grading zone. This
IS sieve, by total amount not exceeding 5%, it shall be regarded as falling within that grading zone. This
tolerance shall not be applied to percentage passing the 600 micron IS sieve or to percentage passing any
other sieve on the coarser limit of grading zone 1 or the finer limit of grading zone IV. Fine aggregates
conforming to grading zone IV shall not be used. Mix designs and preliminary tests shall show its
suitability for producing concrete of specified strength and workability.
FINENESS MODULUS
The sand shall have a fineness modulus of not less than 2.2 or more than 4.2. The fineness modulus is
determined by adding the cumulative percentages retained on the following IS sieve sizes (4.75 mm,
mm, 1.18 mm, 600 microns and 150 microns) and dividing the sum by
COARSE AGGREGATE
Coarse aggregate for concrete, except as noted above, shall conform to IS 383 and IS 2386. This shall
consist of crushed stone and shall be clean and free from elongated, flaky or laminated pieces, adhering
coatings, clay lumps, coal residue, clinkers, slag, alkali, mica, organic matter or other deleterious matter.
Signature of Bidder Page 46 of
Ahmedabad Municipal Corporation
Sr.No. Foreign Material Percentage by weight Uncrushed Crushed
1. Material finer than 75 micron IS sieve 3.0
2. Shale 1.0 --
3 Coal and Lignite 1.0
4 Clay Lumps 1.0
IS: Sieve Designation
SCREENING AND WASHING:
Crushed rock shall be screened and or washed for the removal of dirt or dust coating, if so requested by
Engineer In charge.
Coarse aggregate shall be either in single size or graded, in both cases the grading shall be within the
following units:
Signature of Bidder Page 47 of
Ahmedabad Municipal Corporation
Percentage passing for single sized
aggregate of normal size
Percentage passing for graded
aggregate of normal size.
Signature of Bidder Page 48 of
Ahmedabad Municipal Corporation
The pieces shall be angular in shape and shall have granular or crystalline surfaces. Friable, flaky and
laminated pieces, mica and shale, if present, shall be only within tolerance limits which will not affect
adversely the strength and or durability or concrete. The maximum size of coarse aggregate shall be
mm for M 7.5 and M 10 and 20mm for M15 to M20 concrete, or as directed by the Engineer-in-Charge or
specified otherwise. The maximum size of coarse aggregate shall be the maximum size specified above
but in no case greater than 1/4th of the minimum thickness of the number, provided that the concrete
can be placed without difficulty so as to surround all reinforcement thoroughly and fill the corners of the
form. For plain concrete the maximum size of aggregate shall be of 40 mm. For heavily reinforced
concrete members, the nominal maximum size of the aggregate shall be 5 mm less than the minimum
clear distance between the reinforcing main bars or 5 mm less than the minimum cover reinforcement
whichever is smaller.
FOREIGN MATERIAL LIMITATIONS
The percentage of deleterious materials in the aggregate delivered to the mixer shall not exceed
Water used for both mixing and curing shall conform to IS: 456. Potable water is generally satisfactory.
Water containing any excess of acid, alkali, sugar or salt shall not be used.
Reinforcement bars shall conform to IS: 432 IS: 226 or IS: 1786 and the welded wire fabric to IS: 1566 as
shown or specified on the drawings.
All reinforcement shall be clean, free from pitting, oil, grease, paint, loose mill scales, rust, dirty dust or
any other substance that will destroy or reduce bond.
Sr. No. Foreign Material
Percentage by weight
Uncrushed Crushed
1. Material finer than 75 micron IS sieve 3.0
2. Coal and Lignite 1.0
3. Clay lumps 1.0
4. Soft fragments 3 .0 --
If permitted by Engineer, welding of reinforcement shall be done in accordance with IS: 2751 or IS:
Accelerating, regarding, water reducing and air entraining admixtures shall conform to IS: 9013 and
integral water proofing admixtures to IS:
Admixtures may be used in concrete as per manufacturer’s instructions only with the approval of
Engineer based upon evidence that with the passage of time neither the compressive strength nor its
durability is reduced. An admixture’s suitability and effectiveness shall be verified by trial mixes with the
Signature of Bidder Page 49 of
Ahmedabad Municipal Corporation
other material used in the work. If two or more admixtures are to be used simultaneously in the same
concrete mix, their interaction shall be checked and trial mixes done to ensure their compatibility. There
should also be no increase in risk of corrosion of the reinforcement or other embedment.Calcium
chloride shall not be used for accelerating set of the cement for any concrete containing reinforcement
or embedded steel parts. When calcium chloride is permitted such as in mass concrete works, it shall be
dissolved in water and added to the mixing water by an amount not exceeding 1.5 percent of the weight
of the cement in each batch of concrete. The designed concrete mix shall be corrected accordingly.
No wastage allowance for cement and steel shall be considered and paid for.
SAMPLES AND TESTS
All materials used for the works shall be tested before use. Manufacturer’s test certificate shall also be
got tested by the Contractor in a laboratory approved by Engineer at no extra cost to Client. However,
where material is supplied by client, all testing charges shall be borne by client, but transportation of
material samples to the laboratory shall have to be done by contractor at no extra cost.
Sampling and testing shall be as per IS: 2386 under the supervision of Engineer, The cost of all
tests,sampling etc. shall be borne by Contractor. Water to be used shall be tested to comply with
requirement of IS: 456 Contractor shall furnish manufacturer’s test certificates and technical literatures
for the admixture proposed to be used. If directed the admixture shall be got tested and approved
laboratory at no extra cost.
STORING OF MATERIAL
All material shall be stored in a manner so as to prevent its deterioration and contamination which would
prelude its use in the works. Requirements of IS: 40-82 shall be complied with.Contractor will have to
make his own arrangements for the storage of adequate quantity of cement even if cement is supplied by
client. Cost of such rejected cement, where cement is supplied by client, shall be recovered at issue rate
or open market rate which ever is higher. Cement bags shall be stored in dry weatherproof shed with a
raised floor, well away from the outer walls and insulated from the floor to avoid moisture from ground.
Not more than 15 bags shall be stacked in any tier. Storage arrangement shall be approved by Engineer.
Storage under Tarpaulins shall not be permitted. Each consignment of cement shall be stored separately
and consumed in its order or receipt.Each size of coarse and fine aggregates shall be stacked separately
and shall be protected from leaves and contamination with foreign material. The stacks shall be on hard,
clean, free draining bases, draining away from the concrete mixing area.
Contractor shall make his own arrangements for storing water at site in tanks to prevent contamination.
The reinforcement shall be stacked on top of timber sleepers to avoid contract with ground/water. Each
and size shall be stacked separately.
Concrete grade shall be as designated on drawings. In concrete grade M15, M20, M25 etc. the number
represents the specified characteristic compressive strength of 150 mm cube at 28 days, expressed in
Signature of Bidder Page 50 of
Ahmedabad Municipal Corporation
N/sq.mm as per IS:456. Concrete in the works shall be “Design Mix Concrete” or Normal Mix Concrete”
Allconcrete works of grade M5, M7.5 and M10 shall be nominal whereas all other grades, M15 and
shall be Design Mix Concrete.
DESIGN MIX CONCRETE
MIX DESIGN AND TESTING
For Design Mix Concrete, the mix shall be designed according to IS:10262 and SP:23 to provide the grade
of concrete having the required workability and characteristics strength not less than appropriate values
given in IS:456. The design mix shall in addition be such that it is cohesive and does not segregate and
should result in dense and durable concrete and also capable of giving the finish as specified. Fort water
retaining structures the mix shall also result in water with concrete. The contractor shall exercise great
care while designing the concrete mix and executing the works to achieve the desired result.
Unless otherwise specifically mentioned, the minimum cement content for design mix concrete shall be
as given below.
Grade of Concrete Minimum cement content
In Kg/Cu.m of concrete
The minimum cement content stipulated above shall be adopted irrespective of whether the contractor
achieves the desired strength with less quantity of cement. The contractor’s quoted rates for concrete
shall provide for the above eventually and nothing extra shall become payable to the contractor in this
account.Even in the case where the quantity of cement required is higher than that specified above to
achieve desired strength based on an approved mix design, nothing extra shall become payable to the
contractor. It shall be contractor’s sole responsibility to carry out the mix designs at his own cost. He shall
furnish to Engineer atleast 30 days before concreting operations, a statement of proportions proposed to
be used for various concrete mixes and the strength results obtained. The strength requirements of the
concrete mixes ascertained on 150 mm cubes as per IS: 516 shall comply with the requirements of IS:
Grade of Concrete Minimum Compressive Strength (N/Sq.mm at 7 days)
Specified compressive strength (N/Sq.mm at 28 days)
Signature of Bidder Page 51 of
Ahmedabad Municipal Corporation
A range of slumps, which shall generally be used for various types of construction unless otherwise
instructed by the Engineer, is given below:-
Structure/member Slump in millimeters
Maximum Minimum
Reinforced foundation walls and footings 75
Plain footings, caissons and substructure walls 75
T.G. and massive compressor foundations 50
Slabs, beams and reinforced walls 100
Pumps and miscellaneous equipment foundations 75
Building columns 100
Heavy mass construction 50
BATCHING AND MIXING OF CONCRETE
Proportions of aggregates and cement, as decided by the concrete mix design, shall be by weight. These
proportions shall be maintained during subsequent concrete batching by means of weigh batchers
capable of controlling the weights within one percent of the desired value. Amount of water added shall
be such as to produce dense concrete of required consistency, specified strength and satisfactory
workability and shall be so adjusted to account for moisture content in the aggregates. Water cement
ratio specified shall be maintained. Each time the work stops, the mixer shall be cleaned out, and while
recommending the first batch shall have 10% additional cement to allow for sticking in the drum,
Arrangement should be made by contractor to have the cubes tested in an approved laboratory or in
field at his own expense, with prior consent of Engine4re. Sampling and testing of strength and
workability of concrete shall be as per IS: 1199, IS: 516 and IS:
NOMINAL MIX CONCRETE
Mix design and preliminary tests are not necessary for Nominal mix concrete. However works tests shall
be carried out as per IS: 456. Proportions for Nominal Mix Concrete and water/cement ratio may be
adopted as per Table 3 of IS: 456. However it will be contractor’s sole responsibility to adopt appropriate
nominal mix proportions to yield the specified strength.
BATCHING AND MIXING CONCRETE
Based on the adopted nominal mixes, aggregates and cement shall be measured by weight.
PREPARATION PRIOR TO CONCRETE PLACEMENT
Signature of Bidder Page 52 of
Ahmedabad Municipal Corporation
Before concrete is actually placed in position, the inside of the form work shall be cleaned and mould oil
applied, inserts and reinforcement shall be correctly positioned and securely held, necessary openings
pockets etc. provided.
All arrangements formwork, equipment and proposed procedure, shall be approved by Engineer. The
Contractor shall maintain separate Pour Card for each pour as per the format enclosed and shall produce
before commencement of concreting to Engineer-in-charge.
TRANSPORTING, PLACING AND COMPACTING CONCRETE
Concrete shall be transported from the mixing plant to the formwork with minimum time lapse by
methods that shall maintain the required workability and will prevent segregation, loss of any ingredients
or ingress of foreign matter or water.
In all cases concrete shall be deposited as early as practicable directly in its final position. To avoid
segregation concrete shall not be re-handled or caused to flow. For locations where direct placement is
not possible and in narrow forms. The Contractor shall provide suitable drops and “Elephant Trunks”
Concrete shall not be dropped from a height of more than 1.0 mm as stipulated in clause D.6.8.13.
Concrete shall not be placed in flowing water. Under water, concrete shall be placed in position by
tremies or by pipeline from the mixer and shall never be allowed to fall freely through the water. While
placing concrete the Contractor shall proposed as specified below and also ensure the following:
a) Continuously between construction joints and predetermined abutments.
b) Without disturbance to forms or reinforcement.
c) Without disturbance to pipes, ducts, fixings and the like to be cast in; ensure that such items are
securely fixed. Ensure that concrete cannot enter open ends of pipes and conduits etc.
d) Without dropping in a manner that could cause segregation or shock.
e) In deep pours only when the concrete and framework designed for this purpose and by using suitable
chutes or pipes.
f) Do not place if the workability is such that full compaction cannot be achieved.
g) Without disturbing the unsupported sides of excavations; prevent contamination of concrete with
earth. Provide sheeting if necessary. In supported excavations, withdraw the lining progressively as
concrete is placed.
h) If placed directly on to hardcore or any other porous material, dampen the surface to reduce loss of
water from the concrete.
i) Ensure that there is no damage or displacement to sheet membranes.
j) Record the time and location of placing structural concrete. Concrete shall normally be compacted in its
final position within thirty minutes of leaving the mixer. Concrete shall be compacted during placing with
approved vibrating equipment without causing segregation until it forms a solid mass free from voids
thoroughly worked around reinforcement and embedded fixtures and into all corners of the formwork.
Immersion vibrators shall be inserted vertically at points not more than 450 mm apart and withdrawn
slowly till air bubbles cease to come to surface, leaving no voids. When placing concrete in layers
Signature of Bidder Page 53 of
Ahmedabad Municipal Corporation
advancing horizontally, care shall be taken to ensure adequate vibration, blending and melding of
concrete between successive layers. Vibrators shall not be allowed to come in contract with
reinforcement, formwork and finished surfaces after start of initial set. Over vibration shall be
avoided.Concrete may be conveyed and placed by mechanically operated equipment after getting the
complete procedure approved by Engineer. The slump shall be held to the minimum necessary for
conveying concrete by this method. When concrete is to be pumped concrete mix shall be specifically
designed to suit pumping. Care shall be taken to avoid stoppages in work once pumping has
started.Except when placing with slip forms, each placement of concrete in multiple lift work, shall be
allowed to set for at least 24 hours after the final set of concrete before the start of subsequent
placement. Placing shall stop when concrete reaches the top of the opening in walls or bottom surface of
slab, in slab and beam construction, and it shall be resumed before concrete takes initial set but not until
it has had time to settle as determined by Engineer. Concrete shall be protected against damage until
final acceptance.
Curing and protection shall start immediately after the compaction of concrete to protect it from:
(a) Premature drying out, particularly by solar radiation and wind;
(b) Leaching out by rain and flowing water;
(c) Rapid cooling during the first few days after placing;
(d) High internal thermal gradients;
(e) Low temperature of frost;
(f) Vibration and impact which may disrupt the concrete and interfere with its bond to the
reinforcement.All concrete, unless directed otherwise by Engineer, shall be cured by use of continuous
sprays or pounded water or continuously saturated coverings of sacking, canvas, hessian or other
absorbent material for the period of complete hydration with a minimum of 7 days. The quality of curing
water shall be the same as that used for mixing.Where a curing membrane is directed to be used by the
Engineer, the same shall be of a non-wax base and shall not impair the concrete finish in any manner. The
curing compound to be used shall be got approved from the Engineer before use and shall be applied
with spraying equipment capable of a smooth, even textured coat. Curing may also be done by covering
the surface with an impermeable material such as polyethylene, which shall be well sealed and fastened.
Extra precautions shall be exercised in curing concrete during cold and hot weather.
CONSTRUCTION JOINTS AND KEYS
Construction joints will be as shown on the drawing or as approved by Engineer. Concrete shall be placed
without interruption until completion of work between construction joints. If stopping of concreting
becomes unavoidable anywhere, a properly formed construction joint shall be made with the approved
of Engineer. Dowels for concrete work, not likely to be taken up in the near future, shall be coated with
cement slurry and encased in lean concrete as indicated on the drawings or as directed by Engineer.
Before resuming concreting on a surface which has hardened all laitance and loose stone shall be
thoroughly removed by wire brushing/hacking and surface washed with high pressure water jet and
treated with thin layer of cement slurry for vertical joints and a 15 mm thick layer of cement sand mortar
for horizontal layers, the ratio of cement and sand being the same as in the concrete mix. When
Signature of Bidder Page 54 of
Ahmedabad Municipal Corporation
concreting is to be resumed on a surface which has not fully hardened, all laitance shall be removed by
wire brushing, the surface wetted, free water removed and a coat of cement slurry applied. On this a
layer of concrete not exceeding 150 mm thickness shall be placed and well rammed against the old work.
There after work shall proceed in the normal way.
FOUNDATION BEDDING
All earth surfaces upon which or against which concrete is to be placed, shall be well compacted and free
from standing water, mud or debris. Soft or spongy area shall be cleaned out and back filled with either
cement mixture, lean concrete or clean sand compacted as directed by Engineer. The surfaces of
soils shall be moistened.
The frame work for concrete works shall be such as to give the finish as specified; defects due to bad
workmanship (e.g. damaged or misaligned forms, defective or poorly compacted concrete) will not be
accepted. The Contractor shall construct the formwork using the correct materials and to meet the
requirements of the design and to produce finished concrete to required dimensions, plumbs, planes and
REPAIR AND REPLACEMENT OF UNSATISFACTORY CONCRETE
Immediately after the shuttering is removed, all the defective areas such as honey combed surfaces,
rough patches, holes left by form bolts etc. shall be brought to the notice of Engineer who may permit
patching of the defective areas or reject the concrete work. All though holes for shuttering shall be filled
for full depth and neatly plugged flush with surface. Rejected concrete shall be removed and replaced by
Contractor at no additional cost to Client.For patching of defective areas all loose materials shall be
removed and the surface shall be prepared as directed by the Engineer.Bonding between hardened and
fresh concrete shall be done either by placing cement mortar or by applying epoxy. The decision of the
Engineer as to the method of repairs to be adopted shall be final and binding on the Contractor and no
extra claim shall be entertained on this account. The surface shall be saturated with water for 24 hours
before patching is done with 1:5 cement sand mortar. The use of epoxy for bonding fresh concrete shall
be carried out as directed by Engineer.
HOT WEATHER REQUIREMENTS
Concreting during hot weathers shall be carried out as per IS: 7861 (Part-I) Adequate provisions shall be
made to lower concrete temperatures which shall not exceed 40 Deg. C at the time of placement of fresh
concrete.Where directed by Engineer, Contractor shall spray non-wax based curing compound of
unformed concrete surfaces at no extra costs.
COLD WEATHER REQUIREMENTS
Concreting during cold weather shall be carried out as per IS : 7861 (Part-II). The ambient temperature
during placement and upto final set shall fall below 5 Deg. C. Approved antifreeze/accelerating additives
shall be used where directed.For major and large scale concreting works the temperature of concrete at
time of mixing and placing, the thermal conductivity of the formwork and its insulation and stripping
period shall be closely monitored.
Signature of Bidder Page 55 of
Ahmedabad Municipal Corporation
LIQUID RETAINING STRUCTURES
The Contractor shall take special care of concrete for liquid retaining structures, underground structures
and those others specifically called for to guarantee the finish and water tightness. The minimum level of
surface finish for liquid retaining structures shall be as per clause D.6.16. All such structures shall be
hydro-tested.The contractors shall include in his price of hydro-testing of structure, all arrangements for
testing such as temporary bulk heads, pressure gauges, pumps, pipelines etc.Any temporary
arrangements that may have to be made to ensure stability of the structures shall also be considered to
have been taken into account while quoting the rates.Any leakage that may occur during the hydro-test
or subsequently during the defects liability period or the period for which the structure is guaranteed
shall be effectively stopped either by cement/epoxy pressure grouting, gunting or such other methods as
may be approved by the Engineer. All such rectification of the Client / Engineer at no extra cost to the
TESTING CONCRETE STRUCTURE FOR LEAKAGE
Hydro-static test for water tightness shall be done at full storage by Engineer, as described below:
In case of structures whose external faces are exposed, such as elevated tanks, the requirements of the
test shall be deemed to be satisfied if the external faces show no sign of leakage or sweating and remain
completely dry during the period of observation of seven days after allowing a seven day period for
absorption after filling with water.In case of structures whose external faces are submerged and are not
accessible for inspection, such as underground tanks, the structures shall be filled with water and after
the expiry of seven days after filling,the level of the surface of the water shall be recorded. The level of
water shall be recorded again at subsequent intervals of 24 hrs, over a period of seven days. Backfilling
shall be withheld till the tanks are tested. The total drop in surface level over a period for seven day shall
be taken as an indication of the water tightness of the structure. The Engineer shall decide on the actual
permissible nature of this drop in the surface level, taking into account weather the structures are open
or closed and the corresponding effect it has on evaporation losses. Unless specified otherwise, a
structure whose top is covered shall be deemed to be water tight if the total drop in the surface level
over a period of seven days does not exceed 40 mm.
Each compartment/segment of the structure shall be tested individually and then all together.For
structures such as pipes, tunnels etc. the hydro-static test shall be carried out by filling with water, after
curing as specified, and subjecting to the specified test pressure for specified period. If during this period
the loss of water does not exceed the equivalent of the specified rate, the structure shall be considered
to have successfully passed the test.
If Engineer feels that the materials i.e. .cement, sand coarse aggregates, reinforcement and water are not
in accordance with the specifications or if specified concrete strengths are not obtained, he may order
tests to be carried out on these materials in laboratory, to be approved by the Engineer, as per relevant
IS Codes. Client shall pay only for the testing of material supplied by the Client, otherwise Contractor shall
have to pay for the tests. Transporting of all material to the laboratory shall however be done by the
Contractor at no extra cost to client. In the even of any work being suspected of faulty material or
workmanship requiring its removal or if the works cubes do not give the stipulated strengths, Engineer
reserves the right to order the Contractor to take out cores and conduct tests on them or do ultrasonic
testing or load testing of structure, etc. All these tests shall be carried out by Contractor at no extra cost
to the Client. Alternatively Engineer also reserves the right to ask the Contractor to dismantle and re-do
Signature of Bidder Page 56 of
Ahmedabad Municipal Corporation
such unacceptable work at the cost of Contractor. If the quoted unit rates/prices of concrete shall be
deemed to provide for all tests mentioned above.
All materials, workmanship and finished construction shall be subject to continuous inspection and
approval of Engineer. Materials rejected by Engineer shall be expressly removed from site and shall be
replaced by Contractor immediately at no extra cost to Client.
Upon the completion of concrete work, all forms, equipment, construction tools, protective coverings
any debris, scraps of wood etc. resulting from the work shall be removed and the premises left clean.
ACCEPTANCE CRITERIA
Any concrete work shall satisfy the requirements given below individually and collectively for it to be
a) Properties of constituent materials;
b) Characteristic compressive strength;
c) Specified mix proportions;
d) Minimum cement content;
e) Maximum cement content;
f) Workability;
g) Temperature of fresh concrete;
h) Density of fully compacted concrete;
i) Cover to embedded steel;
k) Tolerances in dimensions;
l) Tolerances in levels;
n) Surface finishes;
o) Special requirements such as :
(i) Water tightness;
(ii) Resistance to aggressive chemicals
(iii) Resistance to freezing and thawing
(iv) Very high strength
(v) Improved fire resistance
(vi) Wear resistance
(vii) Resistance to early thermal cracking
The Engineer’s decision as to the acceptability or otherwise of any concrete work shall be final and
binding of the Contractor. For work not accepted, the Engineer may review and decide whether remedial
measures are feasible so as to render the work acceptable. The Engineer shall in that case direct the
Contractor to undertake and execute the remedial measures. These shall be expeditiously and effectively
implemented by the Contractor.Nothing extra shall become payable to the Contractor. Nothing extra
shall become payable to the Contractor by the Client for executing the remedial measures.
Signature of Bidder Page 57 of
Ahmedabad Municipal Corporation
Item No.08 Providing form work in ordinary timber planking so as to give a rough finish including
centering, shuttering, strutting and propping etc. height of propping and centering
below supporting floor to celling not exceeding 4 M & removal of the same for in situ
reinforced or plain concrete work in (Building SOR, Year 2015-16,P.99, Item No.9.1)
(B) Flat surface such as soffits of slabs,landing and the like. (I) Floors etc. up to 200mm in
thickness (Building SOR 15-16 chapter 9 , item no.09001B1)
Measurement shall be given on Smt. basis.
Item No.09 Providing formwork of ordinary timber planking so as to give a rough finish including
centering shuttering strutting and propping etc. height of propping and centering below
supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (H) (1) Sides and soffits of Beams Beam
Haunchings cantilevers Girders Bressumers and Lintels not exceeding 1 M. in Depth.
Measurement shall be given on Smt. basis.
Item No 10: Providign thermo Mechanically treated bars (RNT EARS) confirming to IS 1786/FC 415 for R.C.C
works includings bendings, binding and placing in position complete upto floor two level.
The work shall consist of furnishing and placing reinforcement to the shape and dimensions shows
as on the drawings or as directed. Steel shall be clean and free from rust and loose mill scale at the
time of fixing in position and subsequent concreting. Reinforcing steel shall conform accurately to
the dimensions given in the bar bending schedules shown on relevant drawings. Bars shall be bent
cold to specified shape and dimensions or as directed using a proper bar bender, operated by hand
or power to attain proper radius of bends. Bars shall not be bent or straightened in a manner that
will injure the material. Bars bent during transport or handling shall be straightened before being
used on the work. They shall not be heated to facilitate bending. Unless otherwise specified, a ‘U’
type hook at the end of each bar shall invariably be provided to main reinforcement. The radius of
the bend shall not be less than twice the diameter of the round bar and the length of straight part
of the bar beyond the end of the curve shall be at least four times the diameter of the round bar. In
case of bars, which are not round, and in case of deformed bars, the diameter shall be taken as the
diameter of circle having an equivalent effective area. The hooks shall be suitably encased to
prevent any splitting of the concrete. All the reinforcement bars shall be accurately placed in exact
position shown on the drawing and shall be securely held in position during, metal hangers,
supporting wires or other approved devices at sufficiently close intervals,. Bars shall not be allowed
to sag between supports nor displaced during concreting or any other operations of the work. All
devices used for positioning shall be of non-corrodible material. Wooden and metal supports shall
no extend to the surface of concrete, except where shown on drawings. Placing of broken stone or
brick and wooden blocks shall not be allowed. Pieces of broken stone or brick and wooden blocks
shall not be used. Spacer bars, precast mortar blocks or other approved devices, shall separate
layers of bars. Reinforcement after being placed in position shall be maintained in a clean condition
until completely embedded in concrete. Special care shall be exercised to prevent any displacement
of reinforcement in concrete already placed. To prevent reinforcement from corrosion, concrete
cover shall be provided as indicated on drawings. All the bars producing from concrete and to which
other bars are to be spliced and which are likely to be exposed for a period exceeding 10 days shall
be protected by a thick coast of neat cement grout. Bars crossing each other where required shall
be secured by binding wires (annealed) of size not less than 1 mm in such manner that they do not
slip over each other at the time of fixing and concreting.
Signature of Bidder Page 58 of
Ahmedabad Municipal Corporation
As far as possible, bars of full length shall be used. In case this is not possible, overlapping of bars
shall be done directed. When practicable, overlapping bars shall not touch each other, but be kept
apart by 25 mm or 1.25 mm times the maximum size of the coarse aggregate whichever is greater
by concrete between them. Where not feasible, overlapping bars shall be bound with annealed
wires not less than 1 mm thick twisted tight. The overlaps shall be staggered for different bears and
located at points along the span where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer-in-charge, bars shall be joined by
couplings, which shall have a cross-section sufficient to transits the full stresses of bars. The ends of
the bars that are joined by coupling shall be upset for sufficient length so that the effective cross
section at the base of threads is not less than normal cross-section of the bar. Threads shall be
standard threads. Steel for coupling shall conform to I.S. 226 When permitted or specified on the
drawings, joints of reinforcement bars shall be butt-welded so as to transmit their full stresses.
Welded joints shall preferably be located at points when steel will not be subject to more than
percent of the maximum permissible stresses and welds so staggered that at any one section not
more than 20 percent of the rods are welded. Only electric are welding using a process which
excludes air from the molten metal and conforms to any or all other special provisions for the work
shall be accepted. Suitable means shall be provided for holding bars securely in position during
welding. It shall be ensured that no voids are left in welding and when welding is done in two or
three stages, previous surface shall be cleaned properly. Ends of the bars shall be cleaned of all
loose scale, rust, grease, paint and other foreign matter before welding. Only competent welders
shall be employed on the work. the M.S. electrodes used for welding shall conform to I.S.
Welded pieces of reinforcement shall be tested. Specimen shall be taken from the actual site and
their number and frequency of test shall be as directed.
Mode of measurement and payment :
For the purpose of calculation consumption, wastage shall not be permitted beyond 5 percent
Excess consumption over 5 % will be charged at penal rate Reinforcement shall be measured in
length including overlaps, separately for different diameters as actually used in the works. Where
welding or coupling is resorted to in place of lap joints such joints shall be measured for a pimento
as equivalent length of overlap as per design requirement. From the length so measured, the
weight of reinforcement shall be calculated in tones on the same basic of as per M-18 even though
steel is supplied to the contractor by the department on actual weight Length shall include hooks at
the ends. Wastage and annealed steel wire for binding shall not be measured and the cost of these
items shall be deemed to be included in the rate for reinforcement.
The rate shall be for a unit One Kg.
ITEM NO.11 : BRICK WORK USING COMMON BURNT CLAY BUILDING BRICKS HAVING CRUSHING STRENGTH NOT LESS THAN
KG/S Q . CM . IN FOUNDATIONS AND PLINTH IN CEMENT MORTAR (B) CONVENTIONAL 1:6 (1 CEMENT : 6 FINE SAND)
(A) IN FOUNDATION & P LINTH
(B) SUPER STRUCTURE
(C)ABOVE FLOOR TWO LEVEL
FOR DETAILED SPECIFICATION REFER R & B DEPT. BOOKLET FOR GENERAL TECHNICAL SPECIFICATION FOR BUILDING WORKS,
SECTION . NO. 6.13, PAGE NO .
ITEM NO . 12 : P ROVDG. 15 M M. T HICK CEMENT P LASTER IN SINGLE COAT ON FAIR SIDE OF B RICK C ONCRETE WALLS FOR
INTERIOR P LASTERING UPTO FLOOR FOUR LEVEL AND FINISHED EVEN AND SMOOTH / MALA P LASTER IN CM 1:4
W ATER M-1. T HE C EMENT MORTAR OF PROPORTION 1:4 SHALL CONFORM TO M-14.
Signature of Bidder Page 59 of
Ahmedabad Municipal Corporation
SCAFFOLDING : W OODEN BALLIES, BAMBOOS, PLANKS, TREATLES AND OTHER SCAFFOLDING SHALL BE SOUND.
THESE SHALL BE PROPERLY EXAMINED BEFORE ERECTION AND USE S TAGE SCAFFOLDING SHALL BE PROVIDED
FOR CEILING PLASTER , WHICH SHALL BE INDEPENDENT OF THE WALLS.
THE SURFACE SHALL BE CLEANED OF ALL DUST, LOOSE MORTAR DROPPINGS, TRACES OF ALGAE, AFFLORESCENCE
AND OTHER FOREIGN MATTER BY WATER OR BY BRUSHING . SMOOTH SURFACE SHALL BE ROUGHENED BY WIRE
BRUSHING IF IT IS NOT HARD AND BY RACKING IF IT IS HARD. IN CASE OF CONCRETE SURFACE, IF A CHEMICAL
RETARDER HAS BEEN APPLIED TO THE FORM WORK, THE SURFACE SHALL BE ROUGHENED BY WIRE BRUSHING AND
ALL THE RESULTING DUST AND LOOSE PARTICLES CLEANED OFF AND CARE SHALL BE TAKEN THAT NONE OF THE
RETARDER IS LEFT ON THE SURFACE. TRIMMING OF PROJECTIONS ON BRICK/CONCRETE SURFACE WHERE
NECESSARY SHALL BE CARRIED OUT TO GET AN EVEN SURFACE.
RAKING OF JOINTS IN CASE OF MASONRY WHERE NECESSARY SHALL BE ALLOWED TO DRY OUT FOR SUFFICIENT
PERIOD BEFORE CARRYING OUT THE PLASTER WORK.
THE WORK SHALL NOT BE SOAKED BUT ONLY DAMPED EVENLY BEFORE APPLYING THE PLASTER. I F THE SURFACE
BECOMES DRY SUCH AREA SHALL BE MOISTENED AGAIN.
FOR EXTERNAL PLASTER , THE PLASTERING OPERATION SHALL BE STARTED FROM TOP FLOOR AND CARRIED
DOWNWARDS . FOR INTERNAL PLASTER , THE PLASTERING OPERATIONS MAY BE STARTED WHEREVER THE
BUILDING FRAME AND CLADDING WORK ARE READY AND THE TEMPORARY SUPPORTING CEILING RESTING ON THE
WALL OF THE FLOOR HAVE BEEN REMOVED, C EILING PLASTER SHALL BE COMPLETED BEFORE STARTING PLASTER
APPLICATIONS OF PLASTER :
THE PLASTER ABOUT 15 X 15 CMS. SHALL BE FIRST APPLIED HORIZONTALLY AND VERTICALLY AT NOT MORE
THAN 2 METRE INTERVALS OVER THE ENTIRE SURFACE TO SERVE AS GAUGE. THE SURFACES OF THESE GAUGES
SHALL BE TRULY INPLANE OF THE FINISHED PLASTERED SURFACE. THE MORTAR SHALL THEN BE APPLIED IN
UNIFORM SURFACE SLIGHTLY MORE THAN THE SPECIFIED THICKNESS, THEN BROUGHT TO A TRUE SURFACE BY
WORKING A WOODEN STRAIGHT EDGE REACHING ACROSS THE GAUGES WITH SMALL UPWARD AND SIDEWAYS
MOVEMENT AT A TIME. FINALLY, THE SURFACE SHALL BE FINISHED OFF TRUE WITH A TROWEL OR WOODEN
FLOAT ACCORDING AS A SMOOTH OR A SANDY GRANULAR TEXTURE IS REQUIRED. E XCESSIVE TROWELLING OR
OVERWORKING THE FLOAT SHALL BE AVOIDED. ALL CORNERS, ARRISES, ANGLES AND JUNCTIONS BE TRULY
VERTICAL OR HORIZONTAL AS THE CASE MAY BE AND SHALL BE CAREFULLY FINISHED. R OUNDING OR
CHAMFERING CORNERS, ARRISES JUNCTIONS ETC. SHALL BE CARRIED OUT WITH PROPER TEMPLATES TO THE SIZE
CEMENT PLASTER SHALL BE USED WITHIN HALF AN HOUR AFTER ADDITION OF WATER . A NY MORTAR OR PLASTER
WHICH IS PARTIALLY SET SHALL BE REJECTED AND REMOVED FORTHWITH FROM THE SITE :
IN SUSPENDING THE WORK AT THE END OF THE DAY, THE PLASTER SHALL BE LEFT OUT CLEAN TO THE LINE BOTH
HORIZONTALLY AND VERTICALLY. WHEN RECOMMENDING THE PLASTER , THE EDGES OF THE OLD WORK SHALL
BE SCRAPED CLEAN AND WETTED WITH CEMENT PUTTY BEFORE PLASTER IS APPLIED TO THE ADJACENT AREA TO
ENABLE THE TWO TO PROPERLY JOINT TOGETHER . P LASTERING WORK SHALL BE CLOSED AT THE END OF THE DAY
ON THE BODY OF THE WALL AND NEARER THAN 15 CM. TO ANY CORNERS OR ARRISES . HORIZONTAL JOINTS IN
PLASTERWORK SHALL NOT ALSO OCCUR ON PARAPET TOPS AND COPINGS AS THESE INVARIABLY LEAD TO
LEAKAGE. NO PORTION OF THE SURFACE SHALL BE LEFT OUT INITIALLY TO BE PACKED UP LATER ON.
E ACH COAT SHALL BE KEPT DAM CONTINUOUSLY TILL THE NEXT COAT IS APPLIED OR FOR A MINIMUM PERIOD OF
7 DAYS. MOISTENING SHALL COMMENCE AS SOON AS PLASTER IS HARDENED SUFFICIENTLY. SOAKING OF WALLS
SHALL BE AVOIDED AND ONLY AS MUCH WATER AS CAN BE READILY ABSORBED SHALL BE USED EXCESSIVE
EVAPORATION ON THE SUNNY OR WINDWARD SIDE OF BUILDING IN HOT AIR OR DRY WEATHER SHALL BE
PREVENTED BY HANDLING MATTINGS OR GUNNY BAGS ON THE OUTSIDE OF THE PLASTER AND KEEPING THEM
M ODE OF MEASUREMENT & PAYMENT :
THE RATE SHALL INCLUDE THE COST OF ALL MATERIALS, LABOUR AND SCAFFOLDING ETC , INVOLVED IN THE
OPERATIONS DESCRIBED UNDER WORKMANSHIP .
A LL PLASTERING SHALL BE MEASURED IN SQUARE METRES UNLESS, OTHERWISE SPECIFIED LENGTH, BREADTH OR
HEIGHT SHALL BE MEASURED CORRECT TO A CENTIMETER .
THICKNESS OF THE PLASTER SHALL BE EXCLUSIVE OF THE THICKNESS OF THE KEY I. E. GROOVES OR OPEN JOINTS
IN BRICK WORK, STONE WORK ETC . OR SPACE BETWEEN LATHS . THICKNESS OF PLASTER SHALL BE AVERAGE
THICKNESS WITH MINIMUM 10 MM. AT ANY POINT ON THIS SURFACE.
THIS ITEM INCLUDES PLASTERING UPTO FLOOR TWO LEVEL.
THE MEASUREMENT OF WALL PLASTERING SHALL BE TAKEN BETWEEN THE WALLS OR PARTITION ( DIMENSIONS
BEFORE PLASTERING BEING TAKEN) FOR LENGTH AND FROM THE TOP OF FLOOR OR SKIRTING TO CEILING FOR
HEIGHT. DEPTH OF COVER OF CORNICES IF ANY SHALL BE DEDUCTED.
SOFFITS OF STAIRS SHALL BE MEASURED AS PLASTERING ON CEILINGS, F LOWING SOFFITS SHALL BE MEASURED
Signature of Bidder Page 60 of
Ahmedabad Municipal Corporation
FOR JAMBS, SOFFITS, SILLS ETC. FOR OPENINGS NOT EXCEEDING 0.5 SQ. MT. EACH IN AREA FOR ENDS OF JOINTS
BEAMS, POSTS, GIRDERS , STEPS ETC . NOT EXCEEDING 0.5 SQ. MT. EACH IN AREA AND FOR OPENINGS EXCEEDING
0.5 SQ. MT. AND NOT EXCEEDING 3.0 SQ. MT. IN EACH AREA DEDUCTIONS AND ADDITIONS SHALL BE MADE IN THE
FOLLOWING MANNER :
(a) NO DEDUCTIONS SHALL BE MADE FOR ENDS JOINTS, BEAMS POSTS ETC. AND OPENINGS NOT EXCEEDING
0.5 SQ. MT. EACH AND NO ADDITION SHALL BE MADE FOR REVEALS, JAMBS, SOFFITS, SILLS ETC. OF THESE
OPENING FOR FINISH TO PLASTER AROUND ENDS OF JOINTS , BEAMS , POSTS ETC .
(b) DEDUCTION FOR OPENINGS EXCEEDING 0.5 SQ. MT. BUT NOT EXCEEDING 3 SQ. MT. EACH SHALL BE
MADE AS FOLLOWS AND NO ADDITION SHALL BE MADE FOR REVEALS, JAMBS , SOFFITS ETC . SILLS ETC . OF THESE
WHEN BOTH FACES OF ALL WALL ARE PLASTERED WITH SAME PLASTER , DEDUCTION SHALL BE MADE FOR ONE
(i) W HEN TWO FACES OF WALL ARE PLASTERED WITH DIFFERENT TYPES OF PLASTERS OR IF ONE FACES IS
PLASTERED AND THE OTHER POINTED, DEDUCTIONS SHALL BE MADE FROM THE PLASTER OR POINTING ON THE
SIDE OF FRAME FOR DOOR , WINDOW ETC . ON WHICH WIDTH OR REVEALS IS LESS THAN THAT ON THE OTHER SIDE
BUT NO DEDUCTIONS SHALL BE MADE ON THE OTHER SIDE. W HERE WIDTH OF REVEALS ON BOTH FACES OF ALL
ARE EQUAL, DEDUCTIONS OF 50% OF AREA OF OPENING ON EACH FACE SHALL BE MADE FROM AREA OF PLASTER
AND/ OR POINTING AS THE CASE MAY BE.
FOR OPENINGS HAVING DOOR FRAMES EQUAL TO PROJECTING BEYOND THE THICKNESS OF WALL, FULL
DEDUCTION FOR OPENING SHALL BE MADE FROM EACH PLASTERED FACE OF THE WALL.
IN CASE OF OPENINGS OF AREA ABOVE 3 SQ. MT. EACH, DEDUCTION SHALL BE MADE FOR OPENING BUT JAMBS,
SOFFITS AND SILLS SHALL BE MEASURED.
THE RATE SHALL BE FOR A UNIT OF ONE SQ. METRE.
FINISHING WITH A FLOATING COAT OF NET CEMENT SLURRY.
M ATERIALS & WORKMANSHIP :
THIS WORK IS ONLY OF PROVIDING SMOOTH CEMENT FINISH WITH FLOATING COAT OF NEAT CEMENT SLURRY.
THE COAT OF CEMENT AND FINE SAND MORTAR OF PROPORTION 1:1 (1.5 MM. THICK ABOUT) SHALL BE APPLIED
TO THE PLASTERED SURFACE WITH A TROWEL TO PROVIDE UNIFORM TEXTURE WHILE THE BASE COAST IS STILL
IN ANY CONTINUOUS FACE OF WALL THE FINISHING TREATMENT SHOULD BE CARRIED OUT CONTINUOUSLY AND
DAY TO DAY BRAKED MADE TO COINCIDE WITH ARCHITECTURAL BREAKS IN ORDER TO AVOID UNSIGHTLY
C URING : ALL THE PLASTER WORK SHALL BE KEPT DAMP CONTINUOUSLY FOR A PERIOD OF 7 DAYS.
M ODE OF MEASUREMENTS & PAYMENT :
THE PAYMENT SHALL BE MADE FOR A UNIT OF 1.0 SQ. MT. OF WORK DONE OVER AND ABOVE THE FINISHING OF
WORK OF BASE COAT.
THE RELEVANT SPECIFICATIONS OF ITEM OF BASE COAT SHALL BE FOLLOWED FOR MEASUREMENTS AND
THE RATE SHALL BE FOR A UNIT OF ONE SQ. METRE.
I TEM NO. 13 : 20 MM THICK SAND FACED CEMENT PLASTER ON WALLS UPTO HEIGHT 10 METRES ABOVE GROUND LEVEL
CONSISTING OF 12 MM THICK BACKING COAT OF C.M. 1:3 (1- CEMENT : 3-SAND) AND 8MM THICK FINISHING COAT OF C.M. 1:1
(1-CEMENT : 1-SAND ) ETC. COMPLETE. R & B-2023-24-17009
Item No.14 P ROVIDING AND LAYING COLOURED GLAZED TILES OF THE SIZE 300 MM X 200 MM X 8 MM/ 300 MM X
MM X 8 MM IN SKIRTING, RISERS OF STEPS AND DEDO ON 10 MM THICK CEMENT PLASTER 1:3 (1-CEMENT: 3-
COARSE SAND ) & JOINTED WITH WHITE CEMENT SLURRY.
1.0. M ATERIALS
1.1. Water shall not be salty brackish and shall be clean, reasonably clear and free objectionable
quantities of silt and traces of oil and injurious alkalis, salts, organicmatter and other deleterious
material which will either weaken the mortar ofconcrete or cause efflorescence or attack the steel
in R.C.C. Container for transport,storage and handling of water shall be clean. Water shall
conform to the standardspecified in I.S. 456-1978.
1.2. If required by the Engineer-in-Charge it shall be tested by comparison with distilled water
Comparison shall be made by means of standard cement tests for soundness time of setting and
mortar strength as specified in I.S. 269-1976. Any indication of unsoundness charge in time of
setting by 30 minutes or more or decrease of more than 10 per cent in strength, of mortar
Signature of Bidder Page 61 of
Ahmedabad Municipal Corporation
prepared with water sample when compared with the results obtained with mortar prepared with
distilled water shall be sufficient cause for rejection of water under test.1.3. Water for curing
mortar, concrete or masonry should not be too acidic or too alkaline. It shall be free of elements
which significantly affect the hydration reaction or otherwise interfere with the hardening of
mortar or concrete during curing or those which produce objectionable stains or other unsightly
deposits on concrete or mortar surfaces
1.3. Hard and bitter water shall not be used for curing
1.4. Potable water will generally found suitable for curing mortar or concrete. Cement mortar Cement
1.5. Cement snail be ordinary Portland slag cement as per I.S.269-1976 or Portland slag cement as
6.1. Sand shall be natural sand, clean, well graded hard strong, durable and gritty particles free from
injurious amounts of dust, clay kankar nodules, soft or flakyparticles shale, alkali salts organic
matter, loam, mica or other deleterious substances and shall be got approved from the Engineer-
in-Charge. The sand shall not contain more contain more than 8 percent of silt as determined by
field test, if necessary the sand shall be washed to make it clean.
6.2. Coarse Sand : The fineness modulus of coarse sand shall not be less than 2.5 and shall not
exceed 3 0. The sieve analysis of coarse shall be as under. I.S. Designation Sieve passing sieve
Percentage by weight Designation
I.S. Sieve Percentage by weight passing Sieve 4.75 mm 100 600 micron 30 – 100 2.36 mm 90 to
300 micron 50 - 701.18 mm 70 to 100 150 micron 0 –
6.3. Fine Sand : The fineness modulus shall not exceed 1.0 The sieve analysis of fine sand shall be
under.I.S. Designation Sieve passing sieve Percentage by weight Designation I.S. Sieve Percentage
by weight passing Sieve 4.75 mm 100 600 micron 40 – 85 2.36 mm 100 300 micron 5 – 50 1.18 mm
75 to 100 150 micron 0 –
11.2. Proportion of Mix 11.2.1. Cement and sand shall be mixed to specified proportion, sand being
measured by measuring boxes, the proportion of cement will be by volume on the basis of 50 Kg/Bag
of cement being equal to 0.0342 Cu.m. The mortar may be hand mixed of machine mixed as directed.
11.3. Proportion of Mortar :
11.3.1. In hand mixed mortar, cement and sand in the specified proportions shall be thoroughly mixed
dry on a clean impervious platform by turning over at least 3 times or more till a homogeneous
mixture of uniform colour is obtained. Mixing platform shall be so arranged that no deleterious
extraneous material shall get mixed with mortar or mortar shall flow out. While mixing, the water shall
be gradually added and thoroughly mixed to from a stiff plastic mass of uniform colour so that each
particle of sand shall be completely covered with a film of w et cement. The water
cement ratio shall be adopted as directed
11.3.2. The mortar so prepared shall be used within 30 minutes of adding water.Only such quantity of
mortar shall be prepared as can be used within 30 minutes shall conform to M-11. Coloured glazed
1. The tiles shall be of best quality as approved by the Engineer-in-charge. They shall be flat and true
to shape They shall he fee from cracks, crazing sports chipper) edges and corners. The glazing shall
be of uniform shade.
2. The other technical specifications for coloured glazed tiles are as per relevant Indian standards.
2.0. Workmanship
2.1. Preparation of Surface: In case of brick masonry wall, the joints shall be raked out to a depth of
while the masonry is being laid. In case of concrete wall the surface shall be chiseled and roughed
with wire brushes. The surface shall be cleaned and wetted thoroughly before commencing the laying
2.2.1. The wall surface shall be covered with 10 mm. thick plaster of cement mortar
1:3 mix and allowed to harden. The plaster shall be roughened with wire brushes both way. The back
of tiles shall be floated with grey cement slurry set and edges with white cement slurry in bedding
Signature of Bidder Page 62 of
Ahmedabad Municipal Corporation
mortar. The tiles shall be gently tapped in position on after the other keeping the joints as thin as
possible. Top of skirting or dedo shall be truly horizontal and the joints vertical or as per required
pattern. 2.2.2. Risers of steps, skirting and dedo shall rest on top of treads or flooring. Where full size
tiles cannot be fixed, They shall be cut to the required size and the edges be
2.2.3. The joints shall be cleaned and flush pointed with white cement. The surface shall be kept wet
for seven days. After curing the surface shall be washed clean.
3.0. Mode of measurements and payment
3.1. The rate shall include the cost of all materials and labour required for various operations
described above. Risers of steps: skirting and dedo shall be measured in square meters, length and
height shall be measured along the finished face of the skirting or dedo including curves, where
special such as covers. internal and external angles, etc., used. The length and height shall be
measured correct lo the centimeter except in case of risersm and skirting where height shall be
measured correct to 3 mm.
3.2. The rate shall be for a unit of one sq. meter.
Providing and laying polished granite stone slab 18 mm thick in risers of steps, dedo and pllars laid on
mm thick cement mortar 1:3 (1 cement:3 coarse sand) and jointed with gray cement slurry including
rubbing & polishing etc. complete. Item shall be executed AS PER SITE REQUIREMENTS AND
CONDITIONS AND INSTRUCTIONS GIVEN BY ENGG-IN CHARGE
The rate shall be for a unit of Smt
Item No.16 Providing and laying polished kota stone slab 25 mm thick in risers of steps,
skirting Dedo and pillars laid on 10 mm thick cement mortar 1:3 (1-Cement :3
coarses and) and jointed with gray cement slury mixed with pigment to match the
shade of slab including rubbing and polishing etc.complete. (upto 10 ton)
The relevant specifications of item no. 59 shall be followed except shall that the
kota stone shall be fixed for risers of steps, skirting or dado in C.M. 1:3 and the polishing
shall be manually instead of machine polishing.
Mode of measurement & payment :
The risers of steps, skirting or dado shall be measured in sq. metre. Length shall
be measured along the finished faces of risers, skirting or dado. Height shall be measured
from finished level of treads or floor to top. Lining of pillar shall be measured under this
The rate shall be for a unit of 1 sq. metre.
ITEM NO .17:- P ROVIDING AND LAYING MARBLE STONE SLAB FLOORING OVER 20 MM (AVERAGE )BASE OF CEMENT MORTAR
1:6 (1-CEMENT : 6 COARSE SAND) OR L.M. 1:1.5(1- LIME PUTTY : 1.5 - COARSE SAND) LAID AND JOINTED
WITH GRAY CEMENT SLURRY INCLUDING RUBBING AND POLISHING COMPLETE . (A) M ARBLE SLAB 25 MM THICK
The rate shall be for a unit of 1 sq. metre.
ITEM NO .18:- P ROVIDING AND LAYING POLISHED K OTA STONE SLAB FLOORING OVER 20 MM (AVERAGE ) THICK BASE
OF CEMENT MORTAR 1:6 (1-CEMENT:6- COARSES AND ) OR L.M.1.1.5 LAID OVER AND JOINTED
WITH GREY CEMENT SLURRY INCLUDING RUBBING AND POLISHING ETC.COMPLETE . (B) 30 MM
The rate shall be for a unit of 1 sq. metre.
Item No.19:- Finishing wall with Apex Ultima Acrylic paint of " Asian Paint " on wall surfaces (two
coats) to give required even shade after application of Exterior Primer of Approved Brand
Signature of Bidder Page 63 of
Ahmedabad Municipal Corporation
& Manufacturers after thoroughly brushing the surface to remove all dirt & remains of
loose powdered materials. (N.S.)
The rate shall be for a unit of 1 sq. metre.
Item No.20:- SCRAPING OIL PAINT FROM STEEL AND OTHER METAL SURFACE AND MAKING THE SURFACE EVEN (WITH HAND
Item No.21:- Painting two coats (excluding priming coat) on new steel and other metal surface
with enamel paint, brushing, interior to give an even shade including cleaning the
surface an even shade including cleaning the surface of all dirt, dust and other foreign
The rate shall be for a unit of 1 sq. metre.
ITEM NO .22:- P ROVIDING LAYING AND JOINTING IN TRUE LINE AND LEVEL 15 MM DIA. U.P.V.C. P IPE (SCH-40) FOR COLD
WATER INCLUDING FITTINGS MAKE PRINCE/ SUPREME/ ASTRAL/ FINOLEX OR EQUIVALENT AS
APPROVED BY ENGINEER IN CHARGE . P IPE SHALL BE FIXED ON THE WALL WITH THE HELP OF CLAMP AT
EVERY TWO METRE C/C OR SHALL BE CONCELLED AS DIRECTED INCLUDING NECESSARY FITTINGS ETC.
INCLUDING TESTING OF PIPE AND JOINTS AND FIXING THE SAME WITH ADHESIVE SOLVENT , INCLUDING COST OF
ALL MATERIALS .
The rate shall be for a unit of 1 Rmt.
Item No.23:- Providing laying and jointing in true line and level 25 mm dia. U.P.V.C. Pipe (SCH-40) for
cold water including fittings make PRINCE/ SUPREME/ ASTRAL/ FINOLEX or equivalent as
approved by Engineer In Charge. Pipe shall be fixed on the wall with the help of clamp
at every two metre C/C or shall be concelled as directed including necessary fittings etc.
including testing of pipe and joints and fixing the same with adhesive solvent, including
cost of all materials
The rate shall be for a unit of 1 Rmt.
Item No : 24 Barricading the entire break down or excavated area on rental basis using wooden
ballies / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board
out side to avoid accident & for smooth traffic diversion & movement including cautionary
board etc. Item also includes for making temporary sufficient nos of lighting arrangement
through out the work with necessary required arrangement. The same shall be removed after
completion of work. (Only for break down work from start to complete) (Based on Drainage
For detailed specification refer5th revision of MORTH (2013) & also amendment shall be
applicable to the latest versions.
The M/s shall be on SMT basis
ITEM NO .25:- G RANITE T AKTI POLISHING AND FINISHING WITH LETTERS GOLDEN COLOUR FOR P OLE / CHAWL NAME .
ETC. COMP .DO AS PER SITE ENGINEER.
The M/s shall be on No. basis
Signature of Bidder Page 64 of
Ahmedabad Municipal Corporation
ITEM NO .:-26 P ROVIDING AND FIXING M.S. GRILLS OF REQUIRED PATTERN TO WOODEN FRAMES OF WINDOWS ETC. WITH
M.S. FLATS AT REQUIRED SPACINGS AND FRAME ALROUND, SQUARE OR ROUND BARS WITH ROUND HEADED
BOLTS AND NUTS OR BY SCREWS (A) P LAIN G RILL .
PROVIDING AND FIXING M.S. GRILLS OF REQUIRED PATTERN TO WOODEN FRAMES OF WINDOWS ETC .
WITH M.S. FLATS AT REQUIRED SPACINGS AND FRAME ALROUND , SQUARE OR ROUND BARS WITH ROUND
HEADED BOLTS AND NUTS OR BY SCREWS (A) PLAIN GRILL. ( UPTO 10 TON )
ITEM NO .27 Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in
case of emergency situation and break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate includes all nece.shifting, fuel
and operating charges . (Nopayment should be allowed for non working condition
Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in
case of emergency situation and break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate includes all nece.shifting, fuel and
operating charges . (Nopayment should be allowed for non working condition of
machinery) for removing safety urgenty to damaged pole direction board safey hard
double ply polyester duplex sling belt with hydra machine
THE RATE SHALL BE FOR A UNIT OF SHIFT B ASIS.
Item No : 28 Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction
of engg.incharge , rate includes all nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to store. (No payment
should be allowed for non working condition of machinery and for pipe line excavation
and laying work)
M/s. shall be on Hr. basis.
ITEM NO:-29 Box type metal letters forming composite box made from 1mm thick stainless steel plate of
grade 304 having brush finish of following font size to be fixed at Main Gate in english and or
Gujrati and including fixing charges approved before fixing by clent / consultant.(a) To (c)
Box type metal letters forming composite box made from 1mm thick stainless steel plate
of grade 304 having brush finish of following font size to be fixed at Main Gate in english and or
Gujrati and including fixing charges approved before fixing by clent / consultant.
Measurement shall be paid in No basis.
Supplying, labour for break down repairing work for activities like excavation, disliting,
removing debris from trench back filling etc. comp. as directed by Eng.in charge.(Building
SOR 2023-24,(Basic rates for Labour work))
Labour charges - Mazdoor (Male) (Sr. No. 1051 Code L-22, Page No.39)
Labour charges - Mazdoor (Fe-Male) (Sr. No. 1050 Code L-21, Page No.39)
Labour charges - Supervision for Machinery (Sr. No. 1058 Code L-29, Page No.39)
Providing Labour for Mice. Work for Breakdown work releted job including required tools
etc.comp.Work with available equipment for breakdown type of work. No extra cost will be given
for the equpement used by the labour for the work.
Signature of Bidder Page 65 of
Ahmedabad Municipal Corporation
The M/s shall be on No basis.
Seal and Signature of the Bidder Add City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 66 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
E TENDER NOTICE NO. – 07 /2026-27
Special Tender Clause For CCRS SLA
Ahmedabad Municipal Corporation has to make a special clause as per for SLA
Name of work :- Ftrzgt Jtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht MþaJJtbtk ytJlth ftbtu
<&t yLg csux vife swœe swœe vtu¤tult yth.me.me <&t c{ef buNlhelt <&t jtuFkzlt dux hevuh fhJt <&t lJt cltJJtlt ftb ctc<.
<t.22.01.2026 lt htus bu.Bgwrlrmvjfrb§hmtnucle Jefje bexekdbtk &guj aatobtk bwÆt lk.21 bwsc
su <u me.me.yth.yum.le Vhegtœlu y.Bgw.ftu.îtht cltJuj Ôntuxmyuv d{wvbtk bwfgt ctœ «tuçjubJtRÍ yum.yuj.yu.lt mbgdt¤t ctœ fhuj
ftbdehe btxu,awftJJtlt &<t ltKtkbtk&e y.Bgw.ftu.lt rl<e-rlgb bwsc vulÕxe leau bwsc fhJtbtk ytJNu.
(A) Penlty For Maintenance and SLA Purpose
CCRS within SLA time (Category & Problem wise) CCRS After SLA time
(Category & Problem wise
Department Category Problem SLA Penalty Penalty Penalty
(Hours) (Hours) (Hours)
Engineering Water>>Engineering Water-low presure 240 Hours 240 480
Engineering Water>>Engineering Water-No Supply 240 Hours 240 480
Engineering Water>>Engineering Water-Other 72 Hours 72 144
Engineering Water>>Engineering Water-Leakage In 48 Hours 48 96
Engineering Water>>Engineering Water-Pollution In 24 Hours 24 48
Engineering Drainage>>Engineering Drainage-Manhole 24 Hours 24 48
Engineering Drainage>>Engineering Drainage-Other 48 Hours 48 96
Engineering Drainage>>Engineering Drainage-Choking Of 48 Hours 48 96
Engineering Drainage>>Engineering Drainage-Public 72 Hours 72 144
Toilets and Urinals-
Blockage or Choking
Signature of Bidder Page 67 of
Ahmedabad Municipal Corporation
Engineering Road Road-Other 48 Hours 48 96
Engineering Road Road-Bhuva On 48 Hours 48 96
Engineering Road Road-Repair Require 72 Hours 72 144
Engineering Storm Water Road-Water logged 24 Hours 24 48
Engineering Storm Water Road-Catch Pit 96 Hours 96 192
Engineering Public Building Public Building- 360 Hours 360 720
Public Toilets and
Urinals-Repairing of
Doors,Windows,Tiles
Engineering Footpath Road-Footpath 168 Hours 168 336
Engineering Building>>Engineering Building-Municipal 168 Hours 168 336
Schools Repairing
Wvhtuf< vulÕxele mbgbgtoœt ctœ vK ftbdehe fhJtbtk l ytJu <tu vwhuvwhe ftbdehele hfb suxje vulÕxe jtdw
(A) Penalty 10% for New Allocated Works.
(B) The Work Order under this Annual Rate Contract (ARC) Tender shall be issued
only against the approved and sanctioned estimate for the respective work.
The time limit for execution of each work shall be specified in the respective Work
Order issued under this tender.
Any penalty for delay or non-compliance shall be calculated and imposed based on
the approved sanctioned estimate amount of the respective work and shall be
governed by the relevant terms, conditions, specifications, and penalty clauses of
Seal and Signature of the Bidder Additional City Engineer (CZ)
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 68 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT-CENTRAL ZONE
Name of Work:- Ftrzgt Jtuzobtk BGþrl.ftWLmejh©e, ^thtmÇg©e, mkm>mÇg©e îtht csux Vt¤Je <uytu îtht MþaJJtbtk
ytJlth ftbtu <&t yLg csux vife swœe swœe vtu¤tult yth.me.me <&t c{ef buNlhelt <&t jtuFkzlt dux hevuh fhJt <&t lJt
cltJJtlt ftb ctc<.
Qty Items Per Amount Rs.
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
1 disposing off the excavated stuff upto 50 Meter
lead.(A) Loose or soft soil Building S.O.R. 2023-24,
I.C.04001A, Iteam No. As Per NBO
0 to 1.5 meter depth.
Extra Rate Over Item of Excavation of Earth for
excavation of asphalt pavement / RCC of thickness
up to 0.20 meter including demolishing the asphalt
carpet, metal, soiling/cutting Reinforcement -
etc.comp. with stacking the material as directed.
(Based on Previously approved rate by C E sir )
a 250.00 up to 0.20 meter thickness (By Manual) SOR - (Jan. 71.10 Smt
2016) Rates for work of Drainage / SWD pipe line-4A
0.20 to 0.30 meter (By any type of Breaker Machine
b 250.00 or R.C.C. Cutter machine including cost of operator, 177.76 Smt
fuel, & transportation etc complete.) SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line-4B
0.30 meter & above (By any type of Breaker Machine
c 400.00 or R.C.C.Cutter machine including cost of operator, 311.08 Smt
fuel, & transportation etc complete.) SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line-4C
Providing and laying cement concrete 1:4:8
(1-Cement: 4- coarses and 8-hand broken
stone aggregates 40mm nominal size) and
3 300.00 curing complete excluding cost of formwork in 2653.67 Cmt
(A) Foundation and Plinth (upto 10 ton). Building
SOR 2023-24 Iteam Cod :05004A Iteam No. As Per
Conveyance of lime murrum building rubbish earth
manure or sludge & execavated rock and rubbish
4 [Lime murrum building rubbish]. Up to 5.00 Km lead
(Building SOR 2023-24 Statement No.5 Item No.
030201A1; Page no.6)
Lead up to 1.0 Km. lead
Lead up to 2.0 Km. lead
Lead up to 3.0 Km. lead
Lead up to 4.0 Km. lead
Lead up to 5.0 Km. lead
Signature of Bidder Page 69 of
Ahmedabad Municipal Corporation
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work in (A) Foundations, footings, Base of columns
and Mass concrete(P.56 I.No.05024AA Building
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
6 131.00 formwork and reinforcement for reinforced concrete 4460.36 Cu.M.
work in (C) Slabs,landing,shelves,Balconies Lintels,
Beams, Girders and Cantilever upto floor two level.
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
7 150.00 formwork and reinforcement for reinforced concrete 4558.20 Cu.M.
work in (D) Columns, Pillars posts and struts upto
floor two level.
Providing formwork of ordinary timber planking so as
to give a rough finish including centering shuttering
strutting and propping etc. height of propping and
centering below supporting floor to ceiling not
8 800.00 exceeding 4 M. and removal of the same for in situ 192.15 Smt
reinforced concrete and plain concrete work in. (H)
(1) Sides and soffits of Beams Beam Haunchings
cantilevers Girders Bressumers and Lintels not
exceeding 1 M. in Depth.
Providing formwork of ordinary timber planking so as
to give a rough finish including centering shuttering
strutting and propping etc. height of propping and
centering below supporting floor to ceiling not
exceeding 4 M. and removal of the same for in situ
reinforced concrete and plain concrete work in. (G)
Columns PillarsPosts and struts. (2)Circular or
curved in Plan.
Providing TMT Bar FE 415 reinforcement for R.C.C.
work including bending, binding and placing in
10 5000.00 position complete upto floor two level. Building SOR 66.59 Kg
2023-24, Iteam Code 05014BA, Iteam No. As Per
NBO 5.4.11, Page No.
Brick work using common burnt clay building
bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in
Cement Mortar1:6 (1-Cement :6 - fine -
sand) Building SOR 2023-24 Iteam Cod : 06002BA
Iteam No. As Per NBO
(A) Conventional (upto 10 ton)
Providing 15 mm thick cement plaster in single coat
on Rough (Similar) side of single or half brick walls
12 450.00 for interior plastering up to floor two level and 174.83 Smt
finished even and smooth in (i) Cement mortar 1:3
(1-cement : 3-sand)
20mm thick sand faced cement plaster on walls upto
height 10 metres above ground level consisting of
12mm thick backing coat of C.M. 1:3 (1-cement : 3-
sand) and 8mm thick finishing coat of C.M. 1:1 (1-
cement : 1-sand) etc. complete. R & B-2023-24-
Signature of Bidder Page 70 of
Ahmedabad Municipal Corporation
Providing and laying coloured glazed tiles of the size
mm in skirting, risers of steps and dedo on 10 mm
14 650.00 thick cement plaster 1:3 (1-cement: 3-coarse sand) & 1426.95 Smt
jointed with white cement slurry. Building SOR
2023-24 Iteam 14036 AIteam No. As Per NBO
Providing and laying polished granite stone slab
mm thick in risers of steps, dedo and pllars laid on
15 5.00 10 mm thick cement mortar 1:3 (1 cement:3 coarse 2690.00 Smt
sand) and jointed with gray cement slurry including
rubbing & polishing etc.complete.
Providing and laying polished Kota stone slab
flooring over 20 mm (Average) thick base of
cement mortar 1:6 (1-cement:6-coarses and)
or L.M.1.1.5 (1-Lime putty:1.5-coarses and)
laid over and jointed with grey cement slurry mixed Sq.M.
with pigment to match the shade of slab
including rubbing and polishing etc. complete. (A)
Providing and laying marble stone slab flooring over
20mm (average)base of cement mortar 1:6 (1-
cement : 6 coarse sand) or L.M. 1:1.5(1- lime putty :
1.5 - coarse sand) laid and jointed with gray cement Sq.M.
slurry including rubbing and polishing complete. (A)
Marble slab 25mm thick
Providing and laying polished Kota stone slab
flooring over 20 mm (Average) thick base of
cement mortar 1:6 (1-cement:6-coarses and) or
L.M.1.1.5 laid over and jointed with grey Sq.M.
cement slurry including rubbing and polishing
etc.complete. (B) 30 mm thick
Finishing wall with Apex Ultima Acrylic paint of "
Asian Paint " on wall surfaces (two coats) to give
required even shade after application of Exterior
Primer of Approved Brand & Manufacturers after
thoroughly brushing the surface to remove all dirt &
remains of loose powdered materials. (N.S.)
Scraping oil paint from steel and other metal surface
20 200.00 and making the surface even (with Hand Scraping.) 48.83 Smt
Painting two coats (excluding priming coat) on
new steel and other metal surface with enamel
paint, brushing, interior to give an even shade
including cleaning the surface an even shade
including cleaning the surface of all dirt, dust and
other foreign matter. R & B-2023-24-19002
Providing laying and jointing in true line and level
mm dia. U.P.V.C. Pipe (SCH-40) for cold water
including fittings make PRINCE/ SUPREME/
ASTRAL/ FINOLEX or equivalent as approved by
Engineer In Charge. Pipe shall be fixed on the wall
22 250.00 with the help of clamp at every two metre C/C or 71.93 rmt.
shall be concelled as directed including necessary
fittings etc. including testing of pipe and joints and
fixing the same with adhesive solvent, including cost
of all materials. Building SOR 2023-24 Iteam23061
Iteam No. As Per NBO
Signature of Bidder Page 71 of
Ahmedabad Municipal Corporation
Providing laying and jointing in true line and level
mm dia. U.P.V.C. Pipe (SCH-40) for cold water
including fittings make PRINCE/ SUPREME/
ASTRAL/ FINOLEX or equivalent as approved by
Engineer In Charge. Pipe shall be fixed on the wall
23 100.00 with the help of clamp at every two metre C/C or 90.93 Rmt
shall be concelled as directed including necessary
fittings etc. including testing of pipe and joints and
fixing the same with adhesive solvent, including cost
of all materials. Building SOR 2023-24 Iteam23062
Iteam No. As Per NBO
Barricading the entire break down or excavated area
on rental basis using wooden ballies / M.S.angles at
max. 2.00 meter centre to centre, C.G.I. Sheet,
reflective paint / Board out side to avoid accident &
for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making
temporary sufficient nos of lighting arrangement
through out the work with necessary required
arrangement. The same shall be removed after
completion of work. (Only for break down work from
start to complete) (Based on Drainage SOR 2015-
Granite Takti polishing and Finishing with letters
25 100.00 Golden Colour For Pole / Chawl Name. etc.comp.do 3392.85 No.
as per site engineer.
Providing and fixing M.S. grills of required pattern to
wooden frames of windows etc. with M.S. flats at
26 5500.00 required spacings and frame alround, square or 100.17 Kg
round bars with round headed bolts and nuts or by
screws (A) Plain Grill.
Providing & Supplying hydra carne Machine of
tone capacity on rental basis in case of emergency
situation and break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
and operating charges . (No payment should be
allowed for non working condition of machinery)
(Based on central work shop rate )
Providing & Supplying JCB Machine on rental basis
in case of emergency situation and break down
type work & also during unavoidable condition
as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating
charges and stacking of useful & non-useful
materials separately up to store. (No payment
should be allowed for non working condition of
machinery and for pipe line excavation and
Box type metal letters forming composite box made
from 1mm thick stainless steel plate of grade
having brush finish of following font size to be fixed
at Main Gate in english and or Gujrati and including
fixing charges approved before fixing by clent /
Signature of Bidder Page 72 of
Ahmedabad Municipal Corporation
Supplying, labour for Mischellinous work like shifting
material, excavation trialpit, and etc work etc. comp.
as directed by Eng.in charge.(Building SOR 2023- -
24,(Basic rates for Labour work))
a 950.00 Labour charges - Mazdoor (Male) (Sr. No. 1051 493.00 No
Code L-22, Page No.39)
b 950.00 Labour charges - Mazdoor (Fe-Male) (Sr. No. 1050 450.00 No
Code L-21, Page No.39)
c 300.00 Labour charges - Supervision for Machinery (Sr. No. 711.00 No
1058 Code L-29, Page No.39)
Seal and Signature of the Bidder Deputy City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 73 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.251.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .