Loading…
Loading…
Tender Value
₹96.2 L
EMD Value
₹1.9 L
Closing Date
12 Jun 2026, 3:00 pm5d left
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Ward 37, Construction of CC tile footpath and hotmix road from the culvert near Nadosi Khadauwa pond to Hyderabad Road.
2026_DOLBU_1156453_1
73/CE/CD/NNB/26-27 (2 To 6) Sr No 5 Tender List 6 Date-01.06.2026
Open Tender
Civil Works
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,328
Bareillye-tender.com
₹1.9 L
4 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Supply of Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceefing 0.5m in depth and earthwork in embankment to be in 20cm layers, including ramming and dressing the surface to required levels & slope & also including 1.50m lift & 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the Engineer-in-Charge. (Excluding Royalty) S.I. No. 253 | 1,354.13 | CUM | 346.27 | ₹4,68,894.6 | BI01010001010000000000000515BI0100001117 |
| 1.02 | Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Brick ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 273) | 52.76 | CUM | 3,600 | ₹1,89,936 | BI01010001010000000000000515BI0100001118 |
| 1.03 | First class brick work in 1:4 cement and fine sand of 1.25 FM. Mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 222.48 | CUM | 5,350 | ₹11,90,268 | BI01010001010000000000000515BI0100001119 |
| 1.04 | 12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i) | 568.5 | SQM | 210 | ₹1,19,385 | BI01010001010000000000000515BI0100001120 |
| 1.05 | Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I. | 20.92 | CUM | 7,645 | ₹1,59,933.4 | BI01010001010000000000000515BI0100001121 |
| 1.06 | RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284 | 2.64 | CUM | 8,260 | ₹21,806.4 | BI01010001010000000000000515BI0100001122 |
| 1.07 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504 | 2.59 | QTL | 8,870 | ₹22,973.3 | BI01010001010000000000000515BI0100001123 |
| 1.08 | Providing laying spreading and compacting graded stone aggregate to wet mix macadom specification including premixing the materials with water at O.M.C in machanical mix plant carriage of mixed material by tipper to site. Laying in uniform layer with paver in sub base/base course on well prepared surface and compactin gwith vibratory roller to achive the desired density, including, guarding, bamicating and mainance of diversion etc. | 447.69 | CUM | 3,613 | ₹16,17,503.97 | BI01010001010000000000000515BI0100001124 |
| 1.09 | Construction of Granular sub (G.S.B.) by providing laying, spreding and compacting speciffied graded, crushed stone in sub base coarse including premixing the materials at O.M.C. in mechanical mixer (PlugMill) including carriage of mixed materials, laying in uniform layers with power roller to achieve the desired density including all materials, labour, machinery, lighting gaurding, barricading and maintance of deiversion complete of as per MORT &HT techincal specification clause No. 404A (Grade-2) | 431.49 | CUM | 3,824 | ₹16,50,017.76 | BI01010001010000000000000515BI0100001125 |
| 1.1 | P/L of Granular sub base with coarse graded materials (Table 400-2 ) in granular sub base by providing coare graded materials, spreading in uniform layer with motor grader on preparing surface mixing by mix in place method with rotovator O.M.C. and compacting with power vibratory roller to achieve the desired density complete as per clause 401compected incluing lighting, guarding, barricating and maintance of diversion etc | 358.16 | CUM | 4,059 | ₹14,53,771.44 | BI01010001010000000000000515BI0100001126 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 28.30 MB
BOQ_2166889.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid