Tender Value
₹19.5 Cr
EMD Value
₹19.5 L
Closing Date
24 Aug 2026, 6:10 pmClosed
EXECUTIVE ENGINEER, PANCHAYAT (R&B) DIVISION, NARMADA
Celebration of Rashtriya Ekta Diwas Function-2026 at Kevadiya Dist-Narmada ( Levelling, GSB, WMM & Other Misc Work at Various Place in Narmada District) (Deposit Work)
334337
14 of 2026-27
Open
Civil Works - Roads
Works
Narmada
8 documents required · 6 mandatory · 2 optional
₹18,000
Executive Engineer, Panchayat (R & B) Division, Rajpipla
₹19.5 L
11 Aug 2026
11 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
Name of Work : Celebration of Rashtriya Ekta Diwas Function-2026 at Kevadiya. Dist Narmada
( Levelling, GSB, WMM & Other Misc. Work at Various Place in Narmada District)
BILL OF QUANTITIES
Item Description of Item (with brief specification and reference to book of
Quantity Unit Rate Amount
No. specifications)
1 Earthwork in cuting in all sorts of soil and soft murrum including
conveying and spreading the stuff, embankment as and where directed
within 200meters from the end of the cutting with all required lead and 104540.00 Cu.M 137.33
2 Earthwork for embankment including breaking clods, dressing with all
lead and lift and including watering rolling and consolidation of
subgrade in layers at O.M.C. to required dry density including filling the 87420.00 Cu.M 182.14
depression which occur during the process using power roller 8T to
10T.(E) From Borrow area within 3.0KM. lead
3 Providing Crane With Operator incl Fuel etc Complete 216.00 Hr. 1052.42
4 Providing JCB With Operator incl Fuel etc Complete 1248.00 Hr. 718.98
5 Providing Roller With Operator incl Fuel etc Complete 162.00 Day 2396.61
6 Construction of 150mm thick compacted granular sub base (Grade-I,
Crushed B.T. materials of 53mm to 26.5mm @ 35%, 26.5mm to
4.75mm @ 45%, below 2.36mm @ 20%) (CBR not less than 30%) as per
table 400.2 of M.O.R.T. & H. gradation including conveying the matrials
on site of work and mixing and spreading into grade and camber,
watering and consolidation at OMC with vibratory roller as per M.O.R.T.
& H. specification including cost of materials and labour etc. complete.
7 Providing and Laying 150 mm thick wet mix macadam (W.M.M.) in two
layers (each layer of 75 mm average) using machine crushed black trap
aggregate of 40 to 50 mm size in the material with water OMC in
mechanically mix (pug mill) carriage of mix material by contractor's own
tipper to site of work including laying, spreading and compacting in sub
base, base course on well prepared under base of compacting as per
MOST specification to achieve the desired density (Mechanically laid)
8 Providing and laying 100 mm thick specified quarry spall in side
shoulders including carriage of materials spreading in live and level and 560.00 SqMt 704.26
9 Providing sock pit of 5.00 Cu.M. Volume including excavating and filling
brickbats with dry masonry work at top for 45cm. height including
covering the top with stone including providing vatas in C.M. 1:3 with 54.00 Each 3486.88
finishing curing etc. complete as directed.
10 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking
concrete block 60mm thick with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as per approved design
Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling
and filling the joint with sand in proper line and level as per guidlines of
IRC : SP 63-2018 etc. Complete.
11 Clearing and grubbing road land including uprooting rank vegetation
grass bushes,shrubs,sapling and trees girth up to 300 mm removal of
stumps of trees cut earlier and disposal of unserviceable materials(D) By 52.63 Hect 34889.38
mechanical means in area of thorny jungle
12 Supply of labour for cleaning and for other misc. works as directed with
necessary equipments. 440.00 Each 510.05
In Words: Rupees Nineteen Crore Forty-Eight Lakh Seventy-One Thousand One Hundred Seventy-One and Sixty-Five Paise
I/We am/are willing to carry out the work at… % above/below percent(Should be written in figures and words) of the estimated
rate mentioned above. Amount of my /our tender works out as under.
* Estimated Amount * Estimated Amount
put to tender put to tender
Deduct :…………% Below Add :………%Above
In Words …………………………………… In Words………………………………
* (Please strike out whichever is not applicable).
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 The amount of dismentalled credit materials at Rs. 64174208.38 shall be deducted from first R.A. Bill.
5 Upon completion of the program, the Contractor shall, at its own cost and responsibility, restore all grounds and areas
used for the program to their original condition, to the satisfaction of the concerned authority. The Contractor shall be
liable for repairing any damage caused during the execution of the program and shall ensure that the site is left clean,
safe, and fit for its intended use.
Dy. Executive Engineer Executive Engineer
Panchayat (R&B) sub Division Panchayat R&B Division
Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.E Tender Notice.pdf
2.SCH-B.pdf
3.SBD Book.pdf
4.BOQ.pdf
5.Specification index.pdf
6.GRs SBD with Index_11zon.pdf
7.COMPILATION.pdf
8.MATERIAL CONSUMPTION.pdf
9.PQ.pdf
Corrigendum RED 2026.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .