Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.3 LAccepted-AOC | 1 | Accepted-AOC lowest quoted | |
| 2 | 2₹3.3 L+₹4,442 (1.36%)Rejected-AOC JARATHA CORNER LAKSHAM VEEDU COLONY ROAD | 2 | Rejected-AOC Highest quoted | |
| 3 | 3₹3.5 L+₹18,604 (5.70%)Rejected-AOC | 3 | Rejected-AOC Highest quoted | |
| 4 | 4₹3.5 L+₹27,861 (8.53%)Rejected-AOC | 4 | Rejected-AOC Highest quoted | |
| 5 | 5₹3.8 L+₹48,430 (14.8%)Rejected-AOC | 5 | Rejected-AOC Highest quoted |
| Sl No | Description | Qty | Unit | Thomas K A L1 | ANANTHARAMAN L4 | K M SREEKUMAR L2 | SIJON NELLIPPILLY L3 | BEST WAY INFRASTRUCTURE L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Sheet Roofing | ||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.9 | cum | 291.01 ₹261.91 Lowest | 315.83 ₹284.25 | 294.98 ₹265.48 | 359.73 ₹323.76 | 331.17 ₹298.05 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.15 | cum | 6,417.71 ₹962.66 Lowest | 6,965.08 ₹1,044.76 | 6,504.97 ₹975.75 | 7,000 ₹1,050 | 7,369.65 ₹1,105.45 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.75 | cum | 7,471.9 ₹5,603.93 Lowest | 8,109.18 ₹6,081.89 | 7,573.49 ₹5,680.12 | 9,235.96 ₹6,926.97 | 8,580.21 ₹6,435.16 |
| 1.00 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 1,072.2 | kg | 157.16 ₹1,68,506.48 Lowest | 170.57 ₹1,82,884.64 | 159.3 ₹1,70,800.98 | 160 ₹1,71,551.52 | 180.47 ₹1,93,499.39 |
| 1.00 | OD230046/2025-2026:Roofing with GI hard colour powder coated trafford sheets .35mm thick or available thickness with overlaps of 150mm at ends and GI bolts and nuts including plain washers and bitumen washer etc complete. | 117.18 | sqm | 502.47 ₹58,879.43 Lowest | 545.33 ₹63,901.77 | 509.3 ₹59,679.77 | 600 ₹70,308 | 577 ₹67,612.86 |
| 1.01 | OD230048/2025-2026:Providing and fixing on Eave face UPVC Half cut Rain water gutter pipes (150mm 4kg/cm2) with all necessary fittings with clamps at 1 M intervel (12.41.2 modified) | 21.7 | metre | 411.59 ₹8,931.5 Lowest | 446.69 ₹9,693.17 | 417.18 ₹9,052.81 | 500 ₹10,850 | 472.63 ₹10,256.07 |
| 1.01 | 50.18.9.19.2:Providing and fixing PVC pipes including fixing the pipe with clamps/clips at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 110 m dia 4 Kgf/cm2 - External work - Exposed on wall | 32 | metre | 287.01 ₹9,184.32 | 311.49 ₹9,967.68 | 290.91 ₹9,309.12 | 200 ₹6,400 Lowest | 329.58 ₹10,546.56 |
| 1.01 | OD259983/2025-2026:engaging coolie for cleaning roof top and sunshade | 4 | each | 875.48 ₹3,501.92 Lowest | 950.15 ₹3,800.6 | 887.39 ₹3,549.56 | 1,000 ₹4,000 | 1,005.34 ₹4,021.36 |
| 1.01 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 311.93 | sqm | 16.57 ₹5,168.68 | 17.98 ₹5,608.5 | 16.79 ₹5,237.3 | 10 ₹3,119.3 Lowest | 19.02 ₹5,932.91 |
Tender Value
₹4.0 L
EMD Value
₹10,092
Closing Date
26 Dec 2025, 2:00 pmClosed
ARYA VISWAN
ASSISTANT ENGINEER PARAPPUKKARA GP NANDIKKARA
Annual Plan Project No 294 2025 26 Sheet roofing upstair of Aurvedha Dispensary building at Parappukkara GP General Civil Work
2025_LSGD_822036_1
10/AE/ET/25-26
Open Tender
Civil Works - Roads
Item Rate
240 days
PARAPPUKKARA G P
Please refer Tender documents.
7 documents required · 7 mandatory
₹890
Yes
₹10,092
Yes
11 Feb 2026
17 Dec 2025
27 Dec 2025
17 Dec 2025
26 Dec 2025
17 Dec 2025
Work Name:Annual Plan-Project No: 294/ 2025-26-Sheet roofing upstair of Aurvedha Dispensary building at Parappukkara GP-General Civil Work
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1377775.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 0.08 MB
viewsbd.pdf
Tender Documents • 1.74 MB
BOQ_1377775.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .