Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance DAKSHIN SRINAGAR MAGURCHHA SOUTH TRIPURA PIN 799143 | SOUTH TRIPURA | TRIPURA | 799143 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance CANARA BANK RAJARBAG UMC UDAIPUR GOMATI TRIPURA PIN 799120 | GOMATI | TRIPURA | 799120 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance ADDRESS BIRGANJ AMARPUR GOMATI DISTRICT TRIPURA 799101 | GOMATI | TRIPURA | 799101 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance TRIPURA TR | KHOWAI | TRIPURA | 799207 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.0 L
EMD Value
₹8,080
Closing Date
14 May 2026, 5:30 pmClosed
EE, Engg. cell, DSE, Agt.
EE, Engg. cell, DSE, Agt.
Construction of CWSN Toilet Block and Ramp and Handrail at PM SHRI Poangbari High School under PM SHRI Scheme under Poangbari RD Block of South Tripura District for the year 2024-25.
2026_DDSE_72586_1
08/EE/ENGG.CELL/DSE/2026-27
Open Tender
Civil Works
Percentage
90 days
Sabroom
Please Refer Tender Document
2 documents required · 2 mandatory
₹1,000
₹8,080
16 Jun 2026
6 May 2026
15 May 2026
6 May 2026
14 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. -All kinds of soil | 1 | cum | 179.9 | ₹179.72 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | - | cum | 161.3 | - |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | cum | 1,177.3 | ₹1,176.12 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level:1:3:6( 1 Cement: 3 fine sand : 6 graded well burnt brick
aggregate 20 mm nominal size) | - | cum | 9,872.1 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 11,080.4 | - |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 1 | cum | 10,461.4 | ₹10,450.94 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five levelexcluding the cost of centring, shuttering, finishing and reinforcement-1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 12,591.1 | - |
| 8 | Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank | - | sqm | 333.9 | - |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank | - | sqm | 570 | - |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | - | sqm | 391 | - |
stage.html
html • 0.03 MB
finance_73851.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.43 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
DNIeT.pdf
Tender Documents • 5.57 MB
BOQ_73851.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .