| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | ₹6.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.4 LRejected-AOC | ₹6.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SAHAD L2 | Sadik Ali P M L1 |
|---|---|---|---|---|---|
| 1.00Leak Rectification Works in DI Pipe | |||||
| 1.00 | 100.49.1.3:Rectification of joint leakages in 200mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. | 12 | no | 8,851 ₹1,06,212 | 8,448.99 ₹1,01,387.88 Lowest |
| 1.00 | 100.49.1.6:Rectification of joint leakages in 350mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. | 10 | no | 12,596 ₹1,25,960 | 12,023.24 ₹1,20,232.4 Lowest |
| 1.00 | 100.49.1.7:Rectification of joint leakages in 400mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. | 9 | no | 13,985 ₹1,25,865 | 13,350 ₹1,20,150 Lowest |
| 2.00Supply of Control Valves,Air Valves & Repairing works | |||||
| 2.00 | 100.98.435:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Kinetic Air Valve Type DK, Size 50mm. | 3 | no | 5,989 ₹17,967 | 5,717.37 ₹17,152.11 Lowest |
| 2.00 | 100.98.439:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 15mm. | 3 | no | 1,598 ₹4,794 | 1,524.47 ₹4,573.41 Lowest |
| 2.00 | 100.98.442:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Large Orifice Type S2, Size 20mm. | 10 | no | 1,846 ₹18,460 | 1,762.29 ₹17,622.9 Lowest |
| 2.00 | 100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm. | 5 | no | 2,316 ₹11,580 | 2,211.09 ₹11,055.45 Lowest |
| 2.00 | 100.98.441:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 40mm. | 3 | no | 2,704 ₹8,112 | 2,580.62 ₹7,741.86 Lowest |
Tender Value
₹5.8 L
EMD Value
₹14,613
Closing Date
29 May 2026, 3:00 pmClosed
Executive Engineer
KWA, PH Division, Shoranur
Annual Maintenance of Various Works of CWSS to Mannur Mankara and Keralassery under PH Section Ottappalam for the Year 2026 27
2026_KWA_852234_1
WRD/KWA-CE(NR)/TR/870/2026
Open Tender
Civil Works - Water Works
Item Rate
KWA, PH Division, Shoranur
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,290
₹14,613
7 Aug 2026
21 May 2026
30 May 2026
21 May 2026
29 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Leak Rectification Works in DI Pipe | |||||
| 1.001 | 100.49.1.3:Rectification of joint leakages in 200mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. | - | no | - | - |
| 1.002 | 100.49.1.6:Rectification of joint leakages in 350mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. | - | no | - | - |
| 1.003 | 100.49.1.7:Rectification of joint leakages in 400mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete. | - | no | - | - |
| 2Supply of Control Valves,Air Valves & Repairing works | |||||
| 2.001 | 100.98.435:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Kinetic Air Valve Type DK, Size 50mm. | - | no | - | - |
| 2.002 | 100.98.439:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 15mm. | - | no | - | - |
| 2.003 | 100.98.442:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Large Orifice Type S2, Size 20mm. | - | no | - | - |
| 2.004 | 100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm. | - | no | - | - |
| 2.005 | 100.98.441:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 40mm. | - | no | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1440026.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.07 MB
2.pdf
Tender Documents • 1.64 MB
AGMT.pdf
Other Document • 0.03 MB
AFFID.pdf
Other Document • 0.04 MB
BOQ_1440026.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].