Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.1 LAdmitted-Finance | ₹93.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹23.3 L (25.1%)Admitted-Finance | ₹1.2 Cr+₹23.3 L (25.1%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GP Engineering Corporation L2 | ALFA TECHNOLOGY & SERVICES L1 |
|---|---|---|---|---|---|
| 1.00SUPPLY PART:Air Preheater Tube (APH Tube) for 110 TPH Boiler of following Specification: | |||||
| 1.01 | Supply of ERW Tubes as per BS 6323, Part-V,
Size: OD : 63.5 mm ,Thickness : 2.33 mms & Length : 4075 mm,
Make-TATA/TUBE INVESTMENT OF INDIA(TII)
No negative tolerance in length is acceptable. | 3,162 | No | 55,71,444 ₹65,74,303.92 | 50,59,200 ₹59,69,856 Lowest |
| 1.02 | Supply of Corton Steel Tubes as per ASTM A423, Grade -1
Size: OD : 63.5 mm ,Thickness : 2.33 & Length : 4075 mm,
Make-TATA/TUBE INVESTMENT OF INDIA(TII)
No negative tolerance in length is acceptable. | 445 | No | 11,47,210 ₹13,53,707.8 | 9,76,775 ₹11,52,594.5 Lowest |
| 1.03 | Supply of ERW Stay Tubes as per BS 3059/320 Part-1,
Size: OD : 63.5 mm ,Thickness : 9 SWG & Length : 4075 mm,
Make-TATA/TUBE INVESTMENT OF INDIA(TII)
No negative tolerance in length is acceptable. | 75 | No | 1,61,100 ₹1,90,098 Lowest | 1,83,375 ₹2,16,382.5 |
| 1.04 | 1. Supply of drain Pipes as per SA335, Grade -P11 , Size:25 NB x SCH 40, Qty-12 Meter.
2. Supply of Elbow 90 Degree, Size-25 NB x SCH 40, Material WP11, Qty-02 Nos.
3. Supply of Equal TEE, Size- 25 NB x SCH 40, Material WP11, Qty-02 Nos. | 1 | Lump Sum | 38,500 ₹45,430 | 10,660 ₹12,578.8 Lowest |
| 2.00SERVICE PART : DISMANTLING, FABRICATION AND REFITTING OF APH TUBES | |||||
| 2.01 | 1. Dismantling of old/ existing Air Pre Heater tubes (Tube Length - 4075 mm, Tube Qty-3682 Nos).
2. Erection, Fitting of Stay tubes and welding of tube at top & bottom plates. (Tube OD:63.5 mm, Thickness: 2.33 mm, Length: 4075 mm, Qty: 75 Nos.
3. Erection, fitting of the tubes and expanding the tubes at top & bottom plates. (Tube: OD-63.5 mm, Thickness-2.33 mm, Length-4075 mm, Qty-3607).
4. Commissioning of New tubes with light and air test.
5. To carry out dismantling and refitting work as per original drawing. Required tools and tackles is in vendor scope. All required materials & consumables is in vendor scope.
6. Please refer to special terms & conditions of the tender document for detailed scope of the job. | 1 | Lump Sum | 29,45,600 ₹34,75,808 | 16,56,900 ₹19,55,142 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
6 Jun 2024, 3:00 pmClosed
HEAD PROCUREMENT
PATNA BIHAR
SUPPLY, TRANSPORTATION, LOADING, UNLOADING, DISMANTLING, FABRICATION AND REFITTING OF AIR PREHEATER TUBES ON TURNKEY BASIS OF 110 TPH BOILER IN COGEN PLANT AT SUGAULI
2024_HPCLB_195619_1
HBL/TEN/PUB/24-25/047
Open Tender
Metal Fabrication
Works
70 days
SUGAULI EAST CHAMPARAN BIHAR
AS PER ATTACHED TENDER DOCUMENT.
2 documents required · 2 mandatory
₹0
₹2.5 L
Yes
13 Jun 2024
15 May 2024
7 Jun 2024
15 May 2024
6 Jun 2024
15 May 2024
15 May 2024 - 6 Jun 2024
SUPPLY PART:Air Preheater Tube (APH Tube) for 110 TPH Boiler of following Specification:
Supply of ERW Tubes as per BS 6323, Part-V, Size: OD : 63.5 mm ,Thickness : 2.33 mms & Length : 4075 mm, Make-TATA/TUBE INVESTMENT OF INDIA(TII) No negative tolerance in length is acceptable.
Supply of Corton Steel Tubes as per ASTM A423, Grade -1 Size: OD : 63.5 mm ,Thickness : 2.33 & Length : 4075 mm, Make-TATA/TUBE INVESTMENT OF INDIA(TII) No negative tolerance in length is acceptable.
Supply of ERW Stay Tubes as per BS 3059/320 Part-1, Size: OD : 63.5 mm ,Thickness : 9 SWG & Length : 4075 mm, Make-TATA/TUBE INVESTMENT OF INDIA(TII) No negative tolerance in length is acceptable.
1. Supply of drain Pipes as per SA335, Grade -P11 , Size:25 NB x SCH 40, Qty-12 Meter. 2. Supply of Elbow 90 Degree, Size-25 NB x SCH 40, Material WP11, Qty-02 Nos. 3. Supply of Equal TEE, Size- 25 NB x SCH 40, Material WP11, Qty-02 Nos.
SERVICE PART : DISMANTLING, FABRICATION AND REFITTING OF APH TUBES
1. Dismantling of old/ existing Air Pre Heater tubes (Tube Length - 4075 mm, Tube Qty-3682 Nos). 2. Erection, Fitting of Stay tubes and welding of tube at top & bottom plates. (Tube OD:63.5 mm, Thickness: 2.33 mm, Length: 4075 mm, Qty: 75 Nos. 3. Erection, fitting of the tubes and expanding the tubes at top & bottom plates. (Tube: OD-63.5 mm, Thickness-2.33 mm, Length-4075 mm, Qty-3607). 4. Commissioning of New tubes with light and air test. 5. To carry out dismantling and refitting work as per original drawing. Required tools and tackles is in vendor scope. All required materials & consumables is in vendor scope. 6. Please refer to special terms & conditions of the tender document for detailed scope of the job.
GP Engineering Corporation
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .