Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | -36.01% | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 LAdmitted-Finance | -35.00% | ₹5.5 L | L2 | Admitted-Finance |
| 3 | L3₹7.2 LAdmitted-Finance | -15.01% | ₹7.2 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹8.5 L
EMD Value
₹17,044
Closing Date
28 May 2026, 6:00 pmClosed
X.En. (RMC) Div.-I, CAD Chambal, Kota
X.En. (RMC) Div.-I, CAD Chambal, Kota
Remove obstruction during rainy season near village Kishanpura Takiya and Rangpur of RMC Sub Division Kota year 2026-27
2026_CADKO_562254_1
NIT No. 04/2026-27 (No. 851-61)
Open Tender
Civil Works
180 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
X.En. (RMC) Div.-I, CAD Chambal, Kota
₹17,044
Yes
1 Jun 2026
24 May 2026
29 May 2026
24 May 2026
28 May 2026
24 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 19,703.2 | Sqm | 1.45 | ₹28,569.64 | BI01010001010000000000000515BI0100001114 |
| 2 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. (diametre) 1000mm (Excluding Labour Charges) NP-3
Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn and neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. (diametre) 1000mm (Labour Charges only) | 10 | RM | 7,659 | ₹76,590 | BI01010001010000000000000515BI0100001119 |
| 3 | Cost of Diesel | 790 | Sqm | 90.5 | ₹71,495 | BI01010001010000000000000515BI0100001125 |
| 4 | Hydraulic excavator/ loader like JCB/ Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity upto 0.40 cum
Hire charges without diesel but with operation staff M.Oil, spares and lubricants (in Rs.) without GST / profit | 100 | Hrs. | 504.4 | ₹50,440 | BI01010001010000000000000515BI0100001119 |
| 5 | Hydraulic excavator/ loader like JCB/ Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity above 0.40 and upto 0.75 cum
Hire charges without diesel but with operation staff M.Oil, spares and lubricants (in Rs.) without GST / profit | 40 | Hrs. | 807.1 | ₹32,284 | BI01010001010000000000000515BI0100001119 |
| 6 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (a) Soft/Loose soil | 7,800 | Cum | 76 | ₹5,92,800 | BI01010001010000000000000515BI0100001129 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_1000505.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid