| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAdmitted-Finance BISWANATH CHARALI TOWN BORGOLA COMPLEX PO BISWANATH CHARALI WARD NO 12 DIST SONITPUR ASSAM PIN 784 173 | BISWANATH | ASSAM | 784173 | ₹6.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.7 Cr+₹15.6 L (2.39%)Admitted-Finance | ₹6.7 Cr+₹15.6 L (2.39%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Refer BOO |
Tender Value
₹5.9 Cr
EMD Value
₹6.2 L
Closing Date
24 Jan 2020, 1:00 pmClosed
CHIEF ENGINEER PROJECT VARTAK
HQ CE PROJECT VARTAK C/O 99 APO PIN 931716
PROVIDING LAYING AND COMPACTING OF 03 CM THICK BITUMINOUS CARPET AND CORRECTION WORK WITH 03 CM THICK BITUMINOUS MACADAM AT DIFFERENT LOCATIONS BETWEEN KM 9PT301 TO 15PT925 ON SHERGOAN MORSHING ROAD FOR AS PART A BETWEEN KM 6PT757 TO KM 11PT235 ON
2020_BRO_533773_1
CE(P)/VTK/29/2019-20
Open Tender
Civil Works - Roads
Works
180 days
Km 9PT301 to 15PT925 on SM Road Km 6PT757 to Km 11
16 documents required · 16 mandatory
₹0
₹6.2 L
Yes
HQ CE PROJECT VARTAK
24 Feb 2020
7 Jan 2020
25 Jan 2020
7 Jan 2020
24 Jan 2020
15 Jan 2020
8 Jan 2020 - 13 Jan 2020
14 Jan 2020
BETWEEN KM 9.301 TO 15.925 ON SHERGOAN-MORSHING ROAD Part 'A'
Providing, laying and compacting Bituminous Macadam layer (BM) to a consolidated thickness of 03 cm including preparation of surface and application of a tack coat of bitumen emulsion complying with IS 8887 (a) 0.3 Kg per square meter area on existing bituminous road surface as preparatory to the super imposition of BM mix with pre-coated aggregate graded as per table No.500-7 and satisfying the physical requirement as per table No.500-6 of MoRT&H specification (Fifth Revision) mixed with minimum 3.4% by weight of total mix as binder in accordance to Table 500-1 as per MoRT&H specification for Road and Bridge works (Fifth Revision) and as per mix design/job mix formula approved by OC Contract for correction work before laying of 30 mm thick BC. The work shall be completed in all respect involving all cost of material, transportation, laying, labour, compensation etc.
Providing, laying and compacting Bituminous concrete to a consolidated thickness of 03 cm including application of tack coat of bitumen emulsion complying with IS 8887 (a) 0.3 Kg per square meter area on existing bituminous surface as preparatory to the super imposition of BC mix for carrying out resurfacing works with pre-coated aggregate conforming to table 500-16 and satisfying the requirement of table 500-17 mixed with minimum 5.4% binder asphalt in accordance to Table 500-1 by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoRT&H specification for Road and Bridge (Fifth Revision)and as per mix design/job mix formula approved by OC Contract. The work shall be completed in all respect including all cost of material, transportation, laying, labour, compensation etc.
BETWEEN KM 6.757 TO KM 11.235 ON MORSHNG-PHUDUNG ROAD Part 'B'
Providing, laying and compacting Bituminous Macadam layer (BM) to a consolidated thickness of 03 cm including preparation of surface and application of a tack coat of bitumen emulsion complying with IS 8887 (a) 0.3 Kg per square meter area on existing bituminous road surface as preparatory to the super imposition of BM mix with pre-coated aggregate graded as per table No.500-7 and satisfying the physical requirement as per table No.500-6 of MoRT&H specification (Fifth Revision) mixed with minimum 3.4% by weight of total mix as binder in accordance to Table 500-1 as per MoRT&H specification for Road and Bridge works (Fifth Revision) and as per mix design/job mix formula approved by OC Contract for correction work before laying of 30 mm thick BC. The work shall be completed in all respect involving all cost of material, transportation, laying, labour, compensation etc.
Providing, laying and compacting Bituminous concrete to a consolidated thickness of 03 cm including application of tack coat of bitumen emulsion complying with IS 8887 (a) 0.3 Kg per square meter area on existing bituminous surface as preparatory to the super imposition of BC mix for carrying out resurfacing works with pre-coated aggregate conforming to table 500-16 and satisfying the requirement of table 500-17 mixed with minimum 5.4% binder asphalt in accordance to Table 500-1 by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoRT&H specification for Road and Bridge (Fifth Revision)and as per mix design/job mix formula approved by OC Contract. The work shall be completed in all respect including all cost of material, transportation, laying, labour, compensation etc.
BETWEEN KM 0.000 TO KM 16.000 ON PHUDUNG- MANDALA ROAD Part 'C'
Providing, laying and compacting Bituminous Macadam layer (BM) to a consolidated thickness of 03 cm including preparation of surface and application of a tack coat of bitumen emulsion complying with IS 8887 (a) 0.3 Kg per square meter area on existing bituminous road surface as preparatory to the super imposition of BM mix with pre-coated aggregate graded as per table No.500-7 and satisfying the physical requirement as per table No.500-6 of MoRT&H specification (Fifth Revision) mixed with minimum 3.4% by weight of total mix as binder in accordance to Table 500-1 as per MoRT&H specification for Road and Bridge works (Fifth Revision) and as per mix design/job mix formula approved by OC Contract for correction work before laying of 30 mm thick BC. The work shall be completed in all respect involving all cost of material, transportation, laying, labour, compensation etc.
Providing, laying and compacting Bituminous concrete to a consolidated thickness of 03 cm including application of tack coat of bitumen emulsion complying with IS 8887 (a) 0.3 Kg per square meter area on existing bituminous surface as preparatory to the super imposition of BC mix for carrying out resurfacing works with pre-coated aggregate conforming to table 500-16 and satisfying the requirement of table 500-17 mixed with minimum 5.4% binder asphalt in accordance to Table 500-1 by weight of total mix and 2% cement by weight of mix (for filler) all as specified as per MoRT&H specification for Road and Bridge (Fifth Revision)and as per mix design/job mix formula approved by OC Contract. The work shall be completed in all respect including all cost of material, transportation, laying, labour, compensation etc.
Mr. Sankatha Prasad Jaiswal
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .