Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAdmitted-Finance 27 0 PRATIK ARCADE BYTCO POINT VILLAGE TOWN NASHIK CITY NASHIK NASHIK MAHARASHTRA 422101 INDIA | NASHIK | MAHARASHTRA | 422101 | L1 | Admitted-Finance | |
| 2 | L2₹68.6 L+₹33.9 L (97.4%)Admitted-Finance 26 12 CHHOTA DHANKOT TILAK BAZAR AGRA UTTAR PRADESH 282003 | AGRA | UTTAR PRADESH | 282003 | L2 | Admitted-Finance | |
| 3 | L3₹78.2 L+₹43.5 L (125.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical Technically Not Accepted | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Not Accepted |
| Sl No | Description | Qty | Unit | Modern Engineers Infratech Pvt Ltd L2 | NEHRA CONSTRUCTIONS L1 | PATIL AND SONS L3 |
|---|---|---|---|---|---|---|
| 1.10 | Trenching & backfilling of Trench (NEW SOR) | 1,000 | M3 | 1,000 ₹11,80,000 | 365 ₹4,30,700 Lowest | 3,500 ₹41,30,000 |
| 1.20Laying,Testing & Comissioning MDPE pipe with supply of warning mat | ||||||
| 1.30 | Laying PE Pipe 125 MM | 3,000 | Meter | 650 ₹23,01,000 | 455 ₹16,10,700 Lowest | 530 ₹18,76,200 |
| 1.40 | Laying PE Pipe 90 MM | 500 | Meter | 600 ₹3,54,000 | 430 ₹2,53,700 Lowest | 490 ₹2,89,100 |
| 1.50 | Laying PE Pipe 63 MM | 1,300 | Meter | 550 ₹8,43,700 | 419 ₹6,42,746 Lowest | 440 ₹6,74,960 |
| 1.60 | Laying PE Pipe 32 MM | 200 | Meter | 500 ₹1,18,000 | 350 ₹82,600 Lowest | 380 ₹89,680 |
| 1.70 | Construction of MDPE valve RCC chamber with base PCC(New SOR) | 12 | M3 | 15,000 ₹2,12,400 | 7,500 ₹1,06,200 Lowest | 11,500 ₹1,62,840 |
| 1.80Supply and installation of Valve chamber cover Size (1MX1M) Heavy Duty | ||||||
| 1.90 | RCC Valve Chamber cover (125 MM,90 & 63 MM PE Line) | 25 | NO | 7,000 ₹2,06,500 | 600 ₹17,700 Lowest | 3,000 ₹88,500 |
| 2.00 | Excavation of Hard Rock - | 50 | M3 | 6,000 ₹3,54,000 | 960 ₹56,640 Lowest | 1,000 ₹59,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 Aug 2026, 3:00 pmClosed
Manager
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune-411045
Tender for rate contract for the period of two years for MDPE Pipeline Network rerouting, Shifting and Restoration of MDPE Gas pipeline network in Nashik GA
2026_MNGL_285232_1
MNGL/CP/2026-27/75
Open Tender
Miscellaneous Services
Works
730 days
NASHIK
AS PER TENDER
16 documents required · 16 mandatory
₹0
₹1 L
Yes
8 Oct 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1.1 | Trenching & backfilling of Trench (NEW SOR) | 1,000 | M3 | - | - | 0.18% |
| 1.2 | Laying,Testing & Comissioning MDPE pipe with supply of warning mat | - | - | - | - | - |
| 1.3 | Laying PE Pipe 125 MM | 3,000 | Meter | - | - | 0.18% |
| 1.4 | Laying PE Pipe 90 MM | 500 | Meter | - | - | 0.18% |
| 1.5 | Laying PE Pipe 63 MM | 1,300 | Meter | - | - | 0.18% |
| 1.6 | Laying PE Pipe 32 MM | 200 | Meter | - | - | 0.18% |
| 1.7 | Construction of MDPE valve RCC chamber with base PCC(New SOR) | 12 | M3 | - | - | 0.18% |
| 1.8 | Supply and installation of Valve chamber cover Size (1MX1M) Heavy Duty | - | - | - | - | - |
| 1.9 | RCC Valve Chamber cover (125 MM,90 & 63 MM PE Line) | 25 | NO | - | - | 0.18% |
| 2 | Excavation of Hard Rock - | 50 | M3 | - | - | 0.18% |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tender75.pdf
Tender Documents • 1.80 MB
BOQ_332965.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .