Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹5,900
Closing Date
15 Jul 2026, 5:00 pm6d left
Divisional Officer
ROADS and BUILDINGS DIVISION, PHULBANI
Constructio of two disable friendly toilets fro PWD Girl students
2026_EICCL_133888_1
SERBPLB2-03-2026-2027
Open Tender
Civil Works - Buildings
60 days
Kandhamal
2 documents required · 2 mandatory
₹4,000
₹5,900
1 Jul 2026
1 Jul 2026
17 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
1 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation inall kinds of soil including dressing and levelling the bed and depositing the soil within intial lead of 50m and intial lift of 1.5m as may be directed and providing shoring and shuttering and struts if necessary complete.
Footing for Tie Beam Ramp | 13.17 | cum | 282.9 | ₹3,725.79 |
| 2 | Supplying , filling in foundation and plinth with sand well watered and rammed in 22.5cm 9" layers with all leads and lifts cost , conveyance , labour, T and P etc. complete ( measurement will be taken on finished compacted section only)
Footing for Tie Beam, 1/3rd of item no. (1.00) , Flooring, Ramp. | 6.93 | cum | 620.6 | ₹4,300.76 |
| 3 | Cement concrete (1:3:6) in foundation and plinth with H.G.C.B. Metal of 4cm .( 1/2 inch) size including lowering,laying,cost,conveyance,royalties,taxes,labour,T and P watering, curing etc. complete. In all respect.
Footing for Tie Beam , Flooring , Ramp. | 2.4 | cum | 6,916.5 | ₹16,599.6 |
| 4 | Plain cement concrete (1:2:4) using 12mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering, curing etc. complete including cost, conveyance , royalties of all materials with labour, labour cess and T and P etc. required for the work complete as per the direction ofthe Engineer-in-charge.
Flooring, Ramp. | 0.91 | cum | 8,431.9 | ₹7,673.03 |
| 5 | Reinforced cement concrete work of M20 with 12mm and 20mm size chips. For R.C.C work including cost of centering and shuttering charges.
(a) Footing ( Column upto plinth ) | 2.46 | cum | 7,232.1 | ₹17,790.97 |
| 5.01 | (b) Plinth Beam (L.W,C.W) | 0.99 | cum | 8,122.4 | ₹8,041.18 |
| 5.02 | © Column Above Plinth Level ( 0.300x0.300) | 1.62 | cum | 16,630.9 | ₹26,942.06 |
| 5.03 | (d) Roof Beam (0.300x0.300) | 0.69 | cum | 16,630.9 | ₹11,475.32 |
| 5.04 | (e) Roof Slab | 1.54 | cum | 14,565.3 | ₹22,430.56 |
| 5.05 | (f) Lintel | 0.2 | cum | 14,961.8 | ₹2,992.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.75 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_599022.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid