| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹16.5 Laccepted-aoc | ₹16.5 L | accepted-aoc |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
23 Feb 2026, 3:05 pmClosed
Chief Engineer, TTD, Tirupati
O/o the Executive Engineer-XII, 2st floor, T.T.D. Admn. Building, K.T.Road, Room no.329 Tirupati, Chittoor(Dist), Andhra Pradesh, India.
Supply Erection and Commissioning of 2 Nos 200Kg per hr capacity Thermax boilers at Annaprasadam complex of Sri Kodanda Rama Swamy Temple Vontimitta for preparation of Annaprasadams in connection with Sri Rama Navami and Sri Sita Ramula Vari Kalyanotsavam 2026
903016
200/EE-XII/TTD/2025-26
OPEN - NCB
Others
Andhra Pradesh
5 documents required · 5 mandatory
₹20,000
10 Mar 2026
18 Feb 2026
18 Feb 2026
Supply Erection and Commissioning of 200 Kg/hr capacity Boilers to Sri Kodanda Rama Swamy Temple Vontimitta. including cost and conveyance of all materials etc complete and including all taxes and EXCLUDING GST and Labour Welfare Cess as directed during execution of the work F.O.R at Vontimitta. Make: Thermax
Technical Specification :
BOILER • One Pressure part assembly consisting of closely wound helical vertical membrane coil fabricated out of high temperature resistant ERW tubes and flats. • One Double jacketed air casing with an aluminum radiator to enclose the pressure parts and serve as an integral combustion air Pre-heater - 01 Set
AUXILARIES • One Pressure atomized, forced draft down firing burner assembly suitable for LDO-HSD firing.
• One Blower coupled with motor mounted on bottom chassis, duly connected to the jacket. • One Fuel pump coupled with motor, mounted on pumping module, for RXA -03 & 04 models & blower mounted fuel pump assembly for RXA–02, RXA-05 & RXA– 06. • One Water pump, with surge suppressor and relief valve, mounted on pumping module. • One Atmospheric economizer and heat optimizer to pre-heat feed water. • One Dust protected pre-wired control panel with necessary switch gear, power and control circuitry. • One Set of tool kit. • One Steam separator assembly (Optional at extra) - 01 Set
PIPING • One Feed water line between optimizer, economizer, feed pump and boiler. • One Fuel oil line between Fuel pump, Y-strainer, burner - 01 Set
MOUNTINGS AND FITTINGS • One Set of isolating needle valves for indicating instruments - 01 Set
A. STEAM • One Main steam stop valve. • One Auxiliary steam stop valve. • One Single port spring loaded safety valve. B. WATER • One Y Strainer. • One Drain valve for economizer. • One Relief valve on feed water pump. • One Non-return valve on feed water line. • One Ball valve for coil blow down. C. FUEL • One Strainer, "Y" type on fuel oil line. • One Main Fuel filter.
INSTRUMENTS, CONTROLS AND SAFETIES - 01 Set • One Burner programmer with matching flame detector. • One Set Audiovisual alarms for abnormal conditions. A. STEAM • One Steam pressure switch for burner ON-OFF
control. • One Steam pressure gauge. • One Steam temperature indicator-cum-switch for high alarm. B. WATER • One Low water level alarm switch on economizer. • One Blow down valve limit switch. C. FUEL • One Fuel Pressure indicator.
Supply, erection and commissioning of the following boiler accessories and circuits (Soft water circuit, Fuel oil circuit, Boiler circuit, Header circuit, PRV circuit & Flue gas circuit etc.,) to Sri Kodanda Rama Swamy Temple, vontimitta including cost and conveyance of all materials etc., complete and excluding all taxes like GST and Labour Welfare Cess as directed during execution of the work F.O.R at vontimitta.
Supply Erection and Commissioning of SOFTNER MODEL US15 (or) Equivalent including cost and conveyance of all materials etc complete and excluding all taxes like GST and Labour Welfare Cess as directed during execution of the work F.O.R at vontimitta. EXCLUDING GST Make: Thermax
Description: US 15 Dia mm : 450 Hose mm : 1650 Resin quantity. Liters : 250 Max. flow M3/hr : 4.0 Min. flow M3/hr: 0.5 Average flow M3/hr : 1.0 Regenerant quantity. 100% NaCl (Kgs) : 40 Max.Operating Pressure., KG/CM2 : 3.5 Min.Operating Pressure. KG/CM2 : 2.0 Output Between Regeneration at 500 ppm M3: 25 Regenerant tank material:HDPE Scope of supply - Ultra -soft Softeners ONE - Water softener comprising. ONE - FRP pressure vessel with inlet and outlet connections, resin charging and with drawl connections and supports. ONE - Set of internal for the above comprising of raw water inlet and bottom collecting system. ONE - Brine tank of H.D.P.E. constructions to store and measure salt for regeneration of the softener complete with brine platform, brine well and brine valve. ONE- Set of PVC Pipe work. ONE - Manually operated SlDE multiport valve for normal operation and regeneration. ONE - initial charge of ion exchange resin for the softener vessel. ONE - Set of inlet and outlet pressure gauges. ONE - Test kit. ONE - Hydraulically operated brine ejector.
Chimney size 300mm dia x 10 mm thick Length 12 mtrs (EXCLUDING GST)
1) All the rates are Excluding GST. 2) The supplier should quote the rate in INR ONLY, along with applicable TAXES (Excluding GST) and F.O.R. (Freight on Road) at Vontimitta
Supply Erection and Commissioning of 200 Kg per hr capacity Boilers to Sri Kodanda Rama Swamy Temple Vontimitta including cost and conveyance of all materials etc complete and including all taxes and EXCLUDING GST and Labour Welfare Cess as directed during execution of the work F O R at Vontimitta Make Thermax
Technical Specification :
BOILER • One Pressure part assembly consisting of closely wound helical vertical membrane coil fabricated out of high temperature resistant ERW tubes and flats. • One Double jacketed air casing with an aluminum radiator to enclose the pressure parts and serve as an integral combustion air Pre-heater - 01 Set
AUXILARIES • One Pressure atomized, forced draft down firing burner assembly suitable for LDO-HSD firing.
• One Blower coupled with motor mounted on bottom chassis, duly connected to the jacket. • One Fuel pump coupled with motor, mounted on pumping module, for RXA -03 & 04 models & blower mounted fuel pump assembly for RXA–02, RXA-05 & RXA– 06. • One Water pump, with surge suppressor and relief valve, mounted on pumping module. • One Atmospheric economizer and heat optimizer to pre-heat feed water. • One Dust protected pre-wired control panel with necessary switch gear, power and control circuitry. • One Set of tool kit. • One Steam separator assembly (Optional at extra) - 01 Set
PIPING • One Feed water line between optimizer, economizer, feed pump and boiler. • One Fuel oil line between Fuel pump, Y-strainer, burner - 01 Set
MOUNTINGS AND FITTINGS • One Set of isolating needle valves for indicating instruments - 01 Set
A. STEAM • One Main steam stop valve. • One Auxiliary steam stop valve. • One Single port spring loaded safety valve. B. WATER • One Y Strainer. • One Drain valve for economizer. • One Relief valve on feed water pump. • One Non-return valve on feed water line. • One Ball valve for coil blow down. C. FUEL • One Strainer, "Y" type on fuel oil line. • One Main Fuel filter.
INSTRUMENTS, CONTROLS AND SAFETIES - 01 Set • One Burner programmer with matching flame detector. • One Set Audiovisual alarms for abnormal conditions. A. STEAM • One Steam pressure switch for burner ON-OFF
control. • One Steam pressure gauge. • One Steam temperature indicator-cum-switch for high alarm. B. WATER • One Low water level alarm switch on economizer. • One Blow down valve limit switch. C. FUEL • One Fuel Pressure indicator.
Supply, erection and commissioning of the following boiler accessories and circuits (Soft water circuit, Fuel oil circuit, Boiler circuit, Header circuit, PRV circuit & Flue gas circuit etc.,) to Sri Kodanda Rama Swamy Temple, vontimitta including cost and conveyance of all materials etc., complete and excluding all taxes like GST and Labour Welfare Cess as directed during execution of the work F.O.R at vontimitta.
Supply Erection and Commissioning of SOFTNER MODEL US15 or Equivalent including cost and conveyance of all materials etc complete and excluding all taxes like GST and Labour Welfare Cess as directed during execution of the work F O R at vontimitta EXCLUDING GST Make Thermax as per tender BOQ specification
Description: US 15 Dia mm : 450 Hose mm : 1650 Resin quantity. Liters : 250 Max. flow M3/hr : 4.0 Min. flow M3/hr: 0.5 Average flow M3/hr : 1.0 Regenerant quantity. 100% NaCl (Kgs) : 40 Max.Operating Pressure., KG/CM2 : 3.5 Min.Operating Pressure. KG/CM2 : 2.0 Output Between Regeneration at 500 ppm M3: 25 Regenerant tank material:HDPE Scope of supply - Ultra -soft Softeners ONE - Water softener comprising. ONE - FRP pressure vessel with inlet and outlet connections, resin charging and with drawl connections and supports. ONE - Set of internal for the above comprising of raw water inlet and bottom collecting system. ONE - Brine tank of H.D.P.E. constructions to store and measure salt for regeneration of the softener complete with brine platform, brine well and brine valve. ONE- Set of PVC Pipe work. ONE - Manually operated SlDE multiport valve for normal operation and regeneration. ONE - initial charge of ion exchange resin for the softener vessel. ONE - Set of inlet and outlet pressure gauges. ONE - Test kit. ONE - Hydraulically operated brine ejector.
Chimney size 300mm dia x 10 mm thick Length 12 mtrs EXCLUDING GST
1) All the rates are Excluding GST. 2) The supplier should quote the rate in INR ONLY, along with applicable TAXES (Excluding GST) and F.O.R. (Freight on Road) at Vontimitta
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQ Nit 200.xls
TENDER_DOCUMENT • 0.14 MB
NIT 200 conditions.doc
TENDER_DOCUMENT • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].