| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-AOC | L1 | Accepted-AOC Being Lowest Vendor | |
| 2 | L2₹30.2 L+₹84,041 (2.86%)Rejected-Finance | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹30.8 L+₹1.4 L (4.79%)Rejected-Finance | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹33.7 L+₹4.4 L (14.9%)Rejected-Finance | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹34.0 L+₹4.6 L (15.8%)Rejected-Finance | L5 | Rejected-Finance Being not L1 |
| Sl No | Description | Qty | Unit | SAI SREENIVASA ENGINEERING L2 | SIRI CONSTRUCTION L4 | GVR ENGINEERING WORKS L5 | R AND A ASSOCIATES ENGINEERS CONTRACTORS L3 | MSN ENGINEERING WORKS L7 | B.Veerabhadra Rao L1 | B SRINIVAS L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Attending day to day work and breakdown and call on repair for uninterupted shore power supply cope points, Junction boxes, Pillar boxes, LT cables off sizes, earthings, cable joints etc complete by providing daily minimum 02 electrician and 02 helper during the complete work period all as specied and directed here-in-after:-
Note: (a) Contractor shall not claim for outsourcing | 350 | Each Job | 600 ₹2,10,000 | 1,720 ₹6,02,000 | 850 ₹2,97,500 | 300 ₹1,05,000 Lowest | 1,200 ₹4,20,000 | 459 ₹1,60,650 | 1,380 ₹4,83,000 |
| 1.01(b) Work will be measured as per unit specified M&L for finding of cable fault inside Jetty gallery or any jetty supply interruption by disconnecting both cable ends, using insulation tester, cable fault finder and rectification complete by cutting at fault position, fixing of straight through heat shrink joint, for cable sizes 150 sqmm to 500 sqmm, 3.5 core, 1100 volts grade and reconnection of both cable end to original position, replacement of defective aluminium cable lugs, fixing with old or required new nuts-bolts-washers complete with testing all as specified and directed. (c) Items required for rectification such as Heat shrink cable end terminals / straight through joints / heat shrink sleeves shall be measured separately as supply only. (d) Required aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate. | ||||||||||
| 2.00 | M&L for de-carbonizing/cleaning of LT 415/380 V 3 phase Air Circuit Breaker at Pillar boxes inside/above Jetty Gallery by removing outer door, inner door, by draw-out movable unit from base, keeping aside carefully, removing all cable connection from rear side bus, interconnection bus between main bus and ACB, checking for any defects due to any flush/loose contact, cleaning of all fixed and moving contact point, terminal connection points with CTC and re-fixing moving unit of ACB, cables, bus the same after applying Backtol (red) solution to the bus bar insulator and replacement of defective aluminium cable lugs and tightening the nuts, bolts, spring washers & thimbles all as specified and directed.
Note :- (a) required aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate (b) all cleaning agents are included in the quoted rate. (c) Disconnection and reconnection of cable will measured separately | 50 | Each Job | 720 ₹36,000 | 1,090 ₹54,500 | 350 ₹17,500 Lowest | 1,200 ₹60,000 | 1,400 ₹70,000 | 500 ₹25,000 | 700 ₹35,000 |
| 3.00 | M&L for de-carbonizing/cleaning of LT 415/380 V 3 phase, 4 wire Junction boxes inside Jetty Gallery used for distribution of power to different pillar boxes by removing cover, by dismentling bunch of cable termination of 3ph+N busbar (cable terminations are not less than 16 nos in each phase of 150 sqmm to 500 sqmm) taking out aluminium/copper complete busbar off sizes, checking for any defects due to any flush, loose contact and cleaning of complete bus with CTC, cleaning of all bus insulators and re-fixing bus etc after applying Backtol (red) solution to the insulator and and refixing all cable connections, replacement of damaged cable lugs and replacement of damaged nuts, bolts, washers and tightening of all nuts, bolts including one coat of painting to inside chamber of cope point with synthetic enamel paint all as specified and directed. Note: (a) Required aluminium or copper busbars, coloured heat shrink sleeve for busbar, cable kits, will be measured as supply only, (b) Required busbar insulators, aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate. | 25 | Each Job | 1,250 ₹31,250 | 2,170 ₹54,250 | 350 ₹8,750 Lowest | 1,200 ₹30,000 | 2,400 ₹60,000 | 900 ₹22,500 | 950 ₹23,750 |
| 4.00 | M&L for de-carbonizing/cleaning of complete LT 415/380 V 3 phase Pillar boxes inside/above Jetty Gallery by removing cover, by dismentling bunch of cable termination of 3ph+N busbar from inside gallery (cable terminations are not less than 4 nos in each phase of 150 sqmm to 500 sqmm) taking out aluminium/copper complete busbar off sizes, checking for any defects due to any flush, loose contact and cleaning of complete bus with CTC, replacing damaged coloured heat shrink sleeve, cleaning of all bus insulators and re-fixing bus etc after applying Backtol (red) solution to the insulator and refixing all cable connections, replacement of damaged cable lugs and tightening the nuts, bolts, washers including one coat of painting to inside chamber of cope point with synthetic enamel paint all as specified and directed. Note: (a) required aluminium or copper busbars, coloured heat shrink sleeve for busbar, cable kits, will be measured as supply only, (b) required busbar insulators, aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate. | 45 | Each Job | 1,130 ₹50,850 | 1,810 ₹81,450 | 350 ₹15,750 Lowest | 1,200 ₹54,000 | 2,400 ₹1,08,000 | 800 ₹36,000 | 700 ₹31,500 |
| 5.00 | M&L for de-carbonizing/cleaning of complete LT 415/380 V 3 phase Cope points fixed at edge of Jetty with half portion above GL and half portion in gallery by removing cover, by dismentling bunch of cable termination of 3ph+N busbar from inside gallery (cable terminations are not less than 4 nos in each phase of 150 sqmm to 500 sqmm) taking out aluminium/copper complete busbar off sizes, checking for any defects due to any flush, loose contact and cleaning of complete bus with CTC, replacing damaged coloured heat shrink sleeve, cleaning of all bus insulators and re-fixing bus etc after applying Backtol (red) solution to the insulator and refixing all cable connections, replacement of damaged cable lugs and tightening the nuts, bolts, washers including one coat of painting to inside chamber of cope point with synthetic enamel paint all as specified and directed. | 20 | Each Job | 720 ₹14,400 | 550 ₹11,000 | 350 ₹7,000 Lowest | 800 ₹16,000 | 1,000 ₹20,000 | 500 ₹10,000 | 750 ₹15,000 |
| 5.01Note: (a) Required aluminium or copper busbars, coloured heat shrink sleeve for busbar, will be measured as supply only, (b) Required busbar insulators, aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate, (c) Cable end terminations will be measured separately. | ||||||||||
| 6.00 | M&L for de-carbonizing/cleaning of complete LT 415/380 V 3 phase Welding Cope points fixed at edge of Jetty above GL by removing cover, by dismentling cable termination of 3ph+N busbar from inside gallery taking out aluminium/copper complete busbar off sizes, checking for any defects due to any flush, loose contact and cleaning of complete bus with CTC, replacing damaged coloured heat shrink sleeve, cleaning of all bus insulators and re-fixing bus etc after applying Backtol (red) solution to the insulator and refixing all cable connections, replacement of damaged cable lugs and tightening the nuts, bolts, washers including one coat of painting to inside chamber of cope point with synthetic enamel paint all as specified and directed.
Note: (a) Required aluminium or copper busbars, cable kit, coloured heat shrink sleeve for busbar will be measured as supply only. (b) Required busbar insulators, aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate, (c) Cable end terminations will be measured separately. | 20 | Each | 550 ₹11,000 | 550 ₹11,000 | 350 ₹7,000 Lowest | 800 ₹16,000 | 750 ₹15,000 | 400 ₹8,000 | 750 ₹15,000 |
| 7.00 | Dismantling taking out complete cable end of sizes 150 sqmm to 500 sqmm, 3.5 core from ACB/MCCB terminals/busbars, cutting cable ends for replacement of burnt/defective aluminiumcable lugs or heat shrink cable end Joints of suitable size or for outdoor heat shrink sleeves single core of suitable size for extended length of XLPE cable and fixing to ACB/MCCB terminals/busbars with nuts, bolts, washers, aluminium cable lugs complete all as specified and directed. Note :- (a) Required aluminium cable lugs and nuts-bolts-washers and busbar insulator shall be inclusive of quoted rate. (b) End join kit and sleevs shall be exclusive of quoted rate. | 350 | Each cable end | 330 ₹1,15,500 | 730 ₹2,55,500 | 120 ₹42,000 | 150 ₹52,500 | 500 ₹1,75,000 | 100 ₹35,000 Lowest | 300 ₹1,05,000 |
| 8.00 | Supply only Heat shrink cable end terminal for 3.5 core 1100 V, 240 to 300 sqmm all as specified and directed. | 10 | Each | 1,950 ₹19,500 | 2,170 ₹21,700 | 2,650 ₹26,500 | 800 ₹8,000 Lowest | 2,200 ₹22,000 | 1,400 ₹14,000 | 1,418.35 ₹14,183.5 |
Tender Value
₹46.6 L
EMD Value
₹93,280
Closing Date
1 Apr 2026, 6:30 pmClosed
GE (I) DM Visakhapatnam
GE (I) DM Visakhapatnam
DAY TO DAY MAINTENANCE CALL ON REPAIRS FOR 24 HRS OF LT PANELS JBS PBS CPS AND ATTENDING BREAKDOWN AND ALLIED WORKS AT JETTY SUBSTATION AND JETTY AREA AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNAM
2026_MES_755934_1
8530/C/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Naval Dockyard Visakhapatnam
As per tender document
8 documents required · 8 mandatory
₹500
GE (I) DM Visakhapatnam
₹93,280
Yes
9 Jun 2026
11 Mar 2026
3 Apr 2026
11 Mar 2026
1 Apr 2026
25 Mar 2026
12 Mar 2026 - 23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Attending day to day work and breakdown and call on repair for uninterupted shore power supply cope points, Junction boxes, Pillar boxes, LT cables off sizes, earthings, cable joints etc complete by providing daily minimum 02 electrician and 02 helper during the complete work period all as specied and directed here-in-after:-
Note: (a) Contractor shall not claim for outsourcing | 350 | Each Job | - | - |
| 1.01 | (b) Work will be measured as per unit specified M&L for finding of cable fault inside Jetty gallery or any jetty supply interruption by disconnecting both cable ends, using insulation tester, cable fault finder and rectification complete by cutting at fault position, fixing of straight through heat shrink joint, for cable sizes 150 sqmm to 500 sqmm, 3.5 core, 1100 volts grade and reconnection of both cable end to original position, replacement of defective aluminium cable lugs, fixing with old or required new nuts-bolts-washers complete with testing all as specified and directed. (c) Items required for rectification such as Heat shrink cable end terminals / straight through joints / heat shrink sleeves shall be measured separately as supply only. (d) Required aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate. | - | - | - | - |
| 2 | M&L for de-carbonizing/cleaning of LT 415/380 V 3 phase Air Circuit Breaker at Pillar boxes inside/above Jetty Gallery by removing outer door, inner door, by draw-out movable unit from base, keeping aside carefully, removing all cable connection from rear side bus, interconnection bus between main bus and ACB, checking for any defects due to any flush/loose contact, cleaning of all fixed and moving contact point, terminal connection points with CTC and re-fixing moving unit of ACB, cables, bus the same after applying Backtol (red) solution to the bus bar insulator and replacement of defective aluminium cable lugs and tightening the nuts, bolts, spring washers & thimbles all as specified and directed.
Note :- (a) required aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate (b) all cleaning agents are included in the quoted rate. (c) Disconnection and reconnection of cable will measured separately | 50 | Each Job | - | - |
| 3 | M&L for de-carbonizing/cleaning of LT 415/380 V 3 phase, 4 wire Junction boxes inside Jetty Gallery used for distribution of power to different pillar boxes by removing cover, by dismentling bunch of cable termination of 3ph+N busbar (cable terminations are not less than 16 nos in each phase of 150 sqmm to 500 sqmm) taking out aluminium/copper complete busbar off sizes, checking for any defects due to any flush, loose contact and cleaning of complete bus with CTC, cleaning of all bus insulators and re-fixing bus etc after applying Backtol (red) solution to the insulator and and refixing all cable connections, replacement of damaged cable lugs and replacement of damaged nuts, bolts, washers and tightening of all nuts, bolts including one coat of painting to inside chamber of cope point with synthetic enamel paint all as specified and directed. Note: (a) Required aluminium or copper busbars, coloured heat shrink sleeve for busbar, cable kits, will be measured as supply only, (b) Required busbar insulators, aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate. | 25 | Each Job | - | - |
| 4 | M&L for de-carbonizing/cleaning of complete LT 415/380 V 3 phase Pillar boxes inside/above Jetty Gallery by removing cover, by dismentling bunch of cable termination of 3ph+N busbar from inside gallery (cable terminations are not less than 4 nos in each phase of 150 sqmm to 500 sqmm) taking out aluminium/copper complete busbar off sizes, checking for any defects due to any flush, loose contact and cleaning of complete bus with CTC, replacing damaged coloured heat shrink sleeve, cleaning of all bus insulators and re-fixing bus etc after applying Backtol (red) solution to the insulator and refixing all cable connections, replacement of damaged cable lugs and tightening the nuts, bolts, washers including one coat of painting to inside chamber of cope point with synthetic enamel paint all as specified and directed. Note: (a) required aluminium or copper busbars, coloured heat shrink sleeve for busbar, cable kits, will be measured as supply only, (b) required busbar insulators, aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate. | 45 | Each Job | - | - |
| 5 | M&L for de-carbonizing/cleaning of complete LT 415/380 V 3 phase Cope points fixed at edge of Jetty with half portion above GL and half portion in gallery by removing cover, by dismentling bunch of cable termination of 3ph+N busbar from inside gallery (cable terminations are not less than 4 nos in each phase of 150 sqmm to 500 sqmm) taking out aluminium/copper complete busbar off sizes, checking for any defects due to any flush, loose contact and cleaning of complete bus with CTC, replacing damaged coloured heat shrink sleeve, cleaning of all bus insulators and re-fixing bus etc after applying Backtol (red) solution to the insulator and refixing all cable connections, replacement of damaged cable lugs and tightening the nuts, bolts, washers including one coat of painting to inside chamber of cope point with synthetic enamel paint all as specified and directed. | 20 | Each Job | - | - |
| 6 | M&L for de-carbonizing/cleaning of complete LT 415/380 V 3 phase Welding Cope points fixed at edge of Jetty above GL by removing cover, by dismentling cable termination of 3ph+N busbar from inside gallery taking out aluminium/copper complete busbar off sizes, checking for any defects due to any flush, loose contact and cleaning of complete bus with CTC, replacing damaged coloured heat shrink sleeve, cleaning of all bus insulators and re-fixing bus etc after applying Backtol (red) solution to the insulator and refixing all cable connections, replacement of damaged cable lugs and tightening the nuts, bolts, washers including one coat of painting to inside chamber of cope point with synthetic enamel paint all as specified and directed.
Note: (a) Required aluminium or copper busbars, cable kit, coloured heat shrink sleeve for busbar will be measured as supply only. (b) Required busbar insulators, aluminium cable lugs and nuts-bolts-washers shall be inclusive of quoted rate, (c) Cable end terminations will be measured separately. | 20 | Each | - | - |
| 7 | Dismantling taking out complete cable end of sizes 150 sqmm to 500 sqmm, 3.5 core from ACB/MCCB terminals/busbars, cutting cable ends for replacement of burnt/defective aluminiumcable lugs or heat shrink cable end Joints of suitable size or for outdoor heat shrink sleeves single core of suitable size for extended length of XLPE cable and fixing to ACB/MCCB terminals/busbars with nuts, bolts, washers, aluminium cable lugs complete all as specified and directed. Note :- (a) Required aluminium cable lugs and nuts-bolts-washers and busbar insulator shall be inclusive of quoted rate. (b) End join kit and sleevs shall be exclusive of quoted rate. | 350 | Each cable end | - | - |
| 8 | Supply only Heat shrink cable end terminal for 3.5 core 1100 V, 240 to 300 sqmm all as specified and directed. | 10 | Each | - | - |
| 9 | Supply only Heat shrink cable end terminal for 3.5 core 1100 V, 400 to 500 sqmm all as specified and directed. | 10 | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
8530Tender.pdf
Tender Documents • 1.17 MB
BOQ_846739.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .