| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | ₹5.0 L | L1 | Accepted-Finance lowest bidder |
| 2 | L2₹5.1 L+₹7,482.76 (1.48%)Rejected-Finance | ₹5.1 L+₹7,482.76 (1.48%) | L2 | Rejected-Finance other than lowest |
| 3 | L3₹5.3 L+₹21,540.10 (4.27%)Rejected-Finance VILLAGE P O SEHALI TEHSIL KOTI DISTT MANDI H P | KOTI | MANDI | HIMACHAL PRADESH | ₹5.3 L+₹21,540.10 (4.27%) | L3 | Rejected-Finance other than lowest |
| Sl No | Description | Qty | Unit | Nitesh Kumar L3 | Ram Lal Thakur L1 | Praveen Kumar L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth up to a lead of 20 Mtrs in pick work, Jumper work and Blasting work in all leads and lifts. | 14.32 | cum | 403 ₹5,770.96 Lowest | 403 ₹5,770.96 Lowest | 403 ₹5,770.96 Lowest |
| 2.00 | Excavation in foundations trenches etc. (for pipes and pits ) upto all depths in all kinds of soil such as pick work,jumper work, blasting and chiselling soft/hard rocks where blasting is prohibited in all leads and lifts including trimming and dressing of sides levelling of bed to correct excavation and returning the stacked soil after laying jointing and testing of G.I.Pipes in trenches in 15 cm. layers including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting/timbering and dewatering where ever required including restoration of un-metalled/metalled paved surface of its original conditions including cost of diversion for traffic night signals fixing caution boards and fencing etc.complete in all respects. | 28.32 | Cum | 572 ₹16,199.04 Lowest | 572 ₹16,199.04 Lowest | 572 ₹16,199.04 Lowest |
| 3.00 | Providing and laying cement concrete 1:3:6(1cement:3 sand:6 crushed stone agg.40mm nominal size)and curing complete excluding cost of form work in foundation and plinth in all leads and lifts. | 2.7 | Cum | 11,900 ₹32,130 Lowest | 11,900 ₹32,130 Lowest | 11,900 ₹32,130 Lowest |
| 4.00Providing and laying cement concrete 1:1.5:3(1cement: 1.5 sand:3 crushed stone agg.20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | ||||||
| 4.01 | In foundation and plinth in all leads and lifts. | 5.56 | Cum | 13,513 ₹75,132.28 Lowest | 13,513 ₹75,132.28 Lowest | 13,513 ₹75,132.28 Lowest |
| 4.02 | Walls (any thickness)but not less than 0.1 mtr.thickness)attached pillasters,buttresses,plinth and string courses etc.from top of foundation level upto floor two level in all leads and lifts. | 8.71 | Cum | 13,534 ₹1,17,881.14 Lowest | 13,534 ₹1,17,881.14 Lowest | 13,534 ₹1,17,881.14 Lowest |
| 4.03 | Suspended floors, roofs,landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers up to floor two level in all leads and lifts. | 2.36 | Cum | 13,584 ₹32,058.24 Lowest | 13,584 ₹32,058.24 Lowest | 13,600 ₹32,096 |
| 5.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm, so as to give a fair finish including centering ,shuttering, propping etc.with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for-in-situ reinforced concrete and plain concrete work in:- | ||||||
| 5.01 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pillasters,buttresses plinth and string courses and the like in all leads and lifts | 100.1 | Sqm. | 500 ₹50,050 | 439 ₹43,943.9 Lowest | 439 ₹43,943.9 Lowest |
| 5.02 | Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm in thickness in all leads and lifts. | 23.84 | Sqm. | 619 ₹14,756.96 Lowest | 619 ₹14,756.96 Lowest | 619 ₹14,756.96 Lowest |
Tender Value
₹4.9 L
EMD Value
₹9,900
Closing Date
2 May 2026, 11:00 amClosed
Executive Engineer Jal Shakti Division Thunag
O/O Executive Engineer Jal Shakti Division Thunag Distt mandi
CO RCC Circular Storage Tank 50,000 Ltr Cap. at Muhath
2026_HPIPH_135079_1
1254-90 dt 24/04/2026
Open Tender
Civil Works - Water Works
Item Rate
Balichowki
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
Yes
₹9,900
Yes
29 Jul 2026
25 Apr 2026
2 May 2026
25 Apr 2026
2 May 2026
25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Cutting in earth work and disposal of excavated earth up to a lead of 20 Mtrs in pick work, Jumper work and Blasting work in all leads and lifts. | 14.32 | cum | - | - |
| - | Excavation in foundations trenches etc. (for pipes and pits ) upto all depths in all kinds of soil such as pick work,jumper work, blasting and chiselling soft/hard rocks where blasting is prohibited in all leads and lifts including trimming and dressing of sides levelling of bed to correct excavation and returning the stacked soil after laying jointing and testing of G.I.Pipes in trenches in 15 cm. layers including consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting/timbering and dewatering where ever required including restoration of un-metalled/metalled paved surface of its original conditions including cost of diversion for traffic night signals fixing caution boards and fencing etc.complete in all respects. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:3:6(1cement:3 sand:6 crushed stone agg.40mm nominal size)and curing complete excluding cost of form work in foundation and plinth in all leads and lifts. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:1.5:3(1cement: 1.5 sand:3 crushed stone agg.20mm nominal size)and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | - | - | - | - |
| - | In foundation and plinth in all leads and lifts. | - | Cum | - | - |
| - | Walls (any thickness)but not less than 0.1 mtr.thickness)attached pillasters,buttresses,plinth and string courses etc.from top of foundation level upto floor two level in all leads and lifts. | - | Cum | - | - |
| - | Suspended floors, roofs,landings and shelves and their supports, balconies, beams, girders, bressumers and cantilivers up to floor two level in all leads and lifts. | - | Cum | - | - |
| - | Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm, so as to give a fair finish including centering ,shuttering, propping etc.with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for-in-situ reinforced concrete and plain concrete work in:- | - | - | - | - |
| - | Vertical surfaces such as walls(any thickness) partitions and the like including attached pillasters,buttresses plinth and string courses and the like in all leads and lifts | - | Sqm. | - | - |
| - | Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm in thickness in all leads and lifts. | - | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
form6.pdf
Tender Documents • 0.85 MB
TERMSNCONDITION.pdf
Tender Documents • 0.23 MB
BOQ_199944.xls
BOQ • 0.24 MB
form8.pdf
Tender Documents • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .