| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.4 LAccepted-AOC | 1 | Accepted-AOC L1 Bidder | |
| 2 | 2₹14.0 L+₹2.5 L (22.0%)Rejected-AOC VALIYAPEEDIYAKKAL HOUSE MUTHUKURISSI P O PALAKKADU 678593 | MUTHUKURISSI | PALAKKAD | KERALA | 678593 | 2 | Rejected-AOC L2 Bidder | |
| 3 | 3₹14.1 L+₹2.7 L (23.4%)Rejected-AOC NO 10 544 THANEERPANTHAL KANNADI KINASSERY 678701 | KINASSERY | PALAKKAD | KERALA | 678701 | 3 | Rejected-AOC L3 Bidder |
Tender Value
₹12.7 L
EMD Value
₹31,745
Closing Date
15 Apr 2025, 5:00 pmClosed
RIJESH A
O/o Assistant Executive Engineer, Workshop Subdivision Malampuzha
GENERAL-Dam safety-Kanhirappuzha dam- Painting and maintenance of spillway gates, hoisting bridge and accessories, emergency gates, gantry cranes and sluice gates of Kanhirappuzha dam in Palakkad district- General Mechanical Work
2025_Irrig_753290_1
IRR/MH/TR/4777/2023_16_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
240 days
Mannarkkad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,745
Yes
19 May 2025
20 Mar 2025
21 Apr 2025
20 Mar 2025
15 Apr 2025
20 Mar 2025
20 Mar 2025 - 15 Apr 2025
Amount
Maintenance and Painting of Spillway Gates and its Hoisting Mechanisms
85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
Maintenance of Gantry Crane ( 1 No ), Emegency Gates (3 nos) and Sluice Gates (3 Nos)
OD12350/2023-2024:Providing with temporary platform for painting the spillway hoisting and Gantry crane , including the cost of material charge handling charge etc. complete (Temporary platform for 1 Set)
85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
OD35804/2024-2025:Overhauling of the Water Escape Valve of Emergency shutter applying grease including Materials, Labour, conveyance etc. complete
OD12347/2023-2024:Erection of Emergency shutter manually after cleaning and greasing the rollers and operating mechanism for taking out the Canal Sluice shutter for painting and maintenance works, including all materials, labour charges etc. complete.
OD12348/2023-2024:Taking out the existing CANAL SLUICE SHUTTER from the groove after dismantling it and dismantling the existing screw rod ,extension channel etc. including cost of all materials, labour charges,hire charges etc. complete.
85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
OD12352/2023-2024:Lifting of emergency shutter after erecting the canal sluice shutter and conducting satisfactory trial run as per the direction of departmental officers including cost of materials, labour charges ,hire charges etc. complete.
OD12353/2023-2024:Trail running of emergency and sluice gates ,safety in grooves,assembling and aligning including cost of all materials,labor all incidental and conveyance charges etc complete as per directions of departmental officer at site
OD12351/2023-2024:Erection of Canal Sluice shutter, extension channel, operating platform and other accessories in proper places. Including cost of all hire charges, materials, labour charges and trial run etc.complete.
Kinanath V P (BID ID -2187411)
SAI ENGINEERING (BID ID -2196400)
Bidder Name
Kinanath V P
K.U. ULAHANNAN
SAI ENGINEERING
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1222438.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .