Loading…
Loading…
Tender Value
₹11.1 L
EMD Value
₹22,265
Closing Date
28 Jul 2026, 3:00 pm
Commandant, 15th Bn TSR(IR-XI), Kumarghat
Commandant, 15th Bn TSR, Saidabari, Kumarghat, Unakoti Tripura.
Construction of 01 one Coy Commander accommodation size-30x15 full wall with brick pillar in c 4 front verandah with Galvalume sheet roofing, attached toilet , tiles flooring and septic tank etc. at Saidabari under 15th Bn TSR
2026_TSR15_74413_1
06/Comdt15thBnTSR/DNIT/2026-27
Open Tender
Civil Works
15th Bn TSR(IR-XI), Saidabari.
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Yes
₹22,265
Yes
8 Jul 2026
8 Jul 2026
29 Jul 2026
8 Jul 2026
28 Jul 2026
8 Jul 2026
8 Jul 2026 - 20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50.m. - All kinds of soil. | - | cum | 231.6 | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slop, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | cum | 1,177.3 | - |
| 3 | (i) Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level: (i) 1:3:6 (1 Cement : 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size) | - | cum | 9,295.7 | - |
| 4 | (ii) 1:2:4 ( 1 Cement : 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 10,742.6 | - |
| 5 | First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 (1 Cement : 4 fine sand). | - | cum | 9,845.2 | - |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | 1 | cum | 161.3 | ₹161.14 |
| 7 | Half brick masonry work with first class bricks in foundation and plinth including cost of all materials and required complete:- (i) In cement mortar 1:4 ( 1 Cement : 4 fine sand) | - | Sqm | 1,311.8 | - |
| 8 | Rainforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete avove plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | 103.9 | - |
| 9 | First class work in superstructure in triangular, square and rectangular pillars above plinth level including cost of all materials as required complete:- (i) In cement mortar 1:4 (1 Cement : 4 fine sand). | 1 | cum | 11,929.99 | ₹11,918.06 |
| 10 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:- In cement mortar 1:4 (1 Cement : 4 fine sand). | - | Sqm | 1,533.5 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_75741.xls
BOQ • 0.35 MB
DNIeT.pdf
Tender Documents • 2.06 MB
Download all tender documents and submit your bid