Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC 2 2 SUKANTA SARANI 4TH LANE PO NONA CHANDANPUKUR BARRACKPORE KOLKATA PIN 700122 | BARRACKPORE | 24 PARAGANAS NORTH | WEST BENGAL | 700122 | L1 | Accepted-AOC The bidder M/S Saha Construction has stood lowest (L1) in the e-Tendering Process. | |
| 2 | L2₹13.6 L+₹330 (0.02%)Rejected-Finance | L2 | Rejected-Finance Quoted rate found 2nd Lowest (L2). | |
| 3 | L3₹13.6 L+₹1,170 (0.09%)Rejected-Finance | L3 | Rejected-Finance Quoted rate found 3rd Lowest (L3). |
Tender Value
Refer Docs
EMD Value
₹27,200
Closing Date
9 Apr 2021, 12:00 pmClosed
EXECUTIVE ENGG (P.W.D), D/DINAJPUR ELEC DIVN
OFFICE OF THE EXECUTIVE ENGINEER (P.W.D), DAKSHIN DINAJPUR ELECTRICAL DIVISION, BALURGHAT Dakshin Dinajpur - 733101
Construction of Temporary Electrification of Accommodation Centre for CAPF and State Police Force wrt ensuing West Bengal Assembly Election 2021 - for 15 (Fifteen) Nos Schools under Banshihari P.S. in the District of Dakshin Dinajpur.
2021_WBPWD_330326_1
WBPWD/EE/DDED/e-NIQ-27/2020-21
Open Tender
ELECTRICAL WORKS ORG
Item Rate
5 days
Banshihari
Please refer tender documents
6 documents required · 6 mandatory
₹27,200
17 Apr 2021
27 Mar 2021
12 Apr 2021
27 Mar 2021
9 Apr 2021
27 Mar 2021
Amount
(i) Up to 3 days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 15 Nos x 11 No of Days = 165 Nos)
S & providing on hire basis 500V/220V, 32A / way, 6 way PDB with isolator on wooden plank board or suitable angle iron frame incl. providing inter coonection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials).
(i) Up to 3 days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 45 Nos x 11 No of Days = 495 Nos)
S & providing on hire basis Main Switch with 1.1 KV grade PVC / A Al cable of folllowing sizes incl. laying in trench / wall with shadding arrangement dismantling the same & mending good the damage at the end of the program (With PWD approve materials).
(a) 4 core 16 sq. mm. PVC / A cable.
(i) Up to 3 days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 300 Mtrs x 11 No of Days = 3300 Mtrs)
(b) 2 core 4 to10 sq. mm. PVC / A cable.
(i) Up to 3 days -
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1800 Mtrs x 11 No of Days = 19800 Nos)
S & drawing on hire basis 2x1.5 sq. mm. / 4 sq. mm PVC Cu. wire incl. dismantling the same at the end of function.
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 3000 Mtrs x 11 No of Days = 33000 Mtrs)
S & providing on hire basis 4 Ft. 40 watt Single Tube Light (commercial type) fitings with necessary Tube lamp & replacement of fuse lamp.
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 600 Nos x 11 No of Days = 6600 Nos)
S & providing on hire basis LED Bulb with necessary accessories.
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 600 Nos x 11 No of Days = 6600 Nos)
Supplying & Providing on hire basis 200 V AC 1400 mm sweep ceiling fan with down rod as reqd. incl. dismantling the same.
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 750 Nos x 11 No of Days = 8250 Nos)
Distribution wiring with 2 x 1.5 sq.mm. PVC Cu. Wire to light / fan points in alkathine pipe on hire basis & dismantling the same at the end of the program. (Without individual control switch).
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1950 Pts x 11 No of Days = 21450 Pts)
Supplying & Providing on 600 mm sweep Air Circulator.
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 30 Nos x 11 No of Days = 330 Nos)
Supplying & Providing on hire basis ( 3 Nos.) 5 amp plug point on casing board with earthing attachment. (For Mobile Charger and Stand Fan).
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 270 Pcs x 11 No of Days = 2970 Pcs.)
S & providing on hire basis 250 watt Metal Hallide fitings with necessary clamping arrangemnt to be fixed on existing wooden / bamboo or on wall incl. gear box & replacement of fuse lamp.
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 150 Nos x 11 No of Days = 1650 Nos)
Earthing the installation with 50 mm. dia G. I. pipe 2.5 Mtr. to 3 Mtr. long & 6 / 8 SWG G. I. wire with bolts, nuts etc.below the GL on hire basis & dismantling the same at the end of the program.
(i) Upto 3 Days.
(ii) Next 11 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 45 Nos x 11 No of Days = 495 Nos)
Hiring & Installation charges for the following capacity DG Sets. incl. All accessories.
(i) 5 KVA DG (Single phase) for 15 Nos School for 14 days. (No of Days 14 x no. of DG 2 x No. of school = 15) = 420 Nos.
To and fro Transportation charges incl. loading & unloading.
(i) 5 KVA DG sets and electrical equipments for 15 Nos of School.
Charge of Electrical Supervisor 01 No. for each shift x 3 shift per day for 14 days for each of 15 Nos School. (Qty. = No of shift 3 x No of days 14 x no of School 15 = 630 Shifts)
Fuel consumption for DG Set with during consumption.
(i) For 5 KVA DG Set. @ 2 Ltr./DG/Hr. (Qty. = No. of DG 30 x no of days 14 x no of working hours 4 = 1680 Hrs.).
N.B.: 1) Rate should be inclusive of all taxes, duties & CESS etc including GST which will not be paid extra (on Item No. 01.00 to 15.00). 2) Bidders are requested to quote Rate for the Items Sl. Nos. 01.01, 02.01, 03.02, 3.05, 04.01, 05.01, 06.01, 07.01, 08.01, 09.01, 10.01, 11.01, 12.01, 13.01, 14.01, 15.00 & 16.01 as spelt out in the BOQ . The rate for the items Sl. Nos. 01.02, 02.02, 03.03, 3.06, 04.02, 05.02, 06.02, 07.02, 08.02, 09.02, 10.02, 11.02 & 12.02 will be calculated automatically. 3)The bidder will have to quote the fuel rate based on the market rate on the date of bidding. 4) The cost of fuel may be charged depending on the actual cost of fuel during the time of execution of work. Log book to be maintained strictly on daily basis.
M/S B. K. DEY SARKAR
M/S Basak Electrical Repairing House
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .